Electrical permit history — 218 S Avenida Del Porvenir
218 S Avenida Del Porvenir
- Electrical service: upgraded to 200 A in 2019, passed final inspection.
- Watch for: built 1965, the years some homes got aluminum branch wiring. Worth a look at the outlets and panel.
- Other work on record: solar added 2019.
From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
Is it time to upgrade?
Probably not: the service was upgraded to 200 A in 2019.
- Electrical service & panelLooks current200 A per a 2019 permit that passed final inspection. The label in your panel is the final word. T19CM06446 — ELECTRIC SERVICE UPGRADE TO 200 AMPS
- Heating & coolingWorth checkingNo permit on record names this system. Worth knowing: a 2019 solar pv permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. The assessor records cooling as Refrigeration and heating as Forced Air. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes.
- Water heaterWorth checkingNo permit on record names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
- RoofWorth checkingNo permit on record names this system. The assessor records the roof as Built Up.
What that usually means electrically
- Era-based check — high priority
This is the aluminum branch-circuit window (roughly 1965–1973). Solid aluminum on 15/20 A circuits is a recognized fire hazard at the terminations and needs approved repair — COPALUM or AlumiConn, not a wire nut.
What to check at the panel
These are the things only someone standing at the panel can settle — about a minute’s work. Check them against the 200 A the 2019 permit describes.
- The number stamped on the main breaker handle. The 2019 permit describes 200 A; the handle and the panel label are the final word.
- The busbar rating printed on the panel label. It is a different number from the main breaker, and it is the one that decides how much solar a panel can take under the 120% rule.
- The manufacturer and catalog number on the label inside the door.
- How many full-size spaces are left, how many positions the label permits a tandem breaker in, and the tandem limit the label states. A full panel is a different job from a full service.
- The conductor material at the main lugs, and whether the terminations look clean and tight.
- Whether there is a separate meter-main outside as well as the panel indoors — that changes where a disconnect and any new feeder would land.
- Whether the water heater, dryer and range are gas or electric. No public record carries fuel type, and it is the single biggest variable in a load calculation — it can move the calculated load on the same house by more than 40 A.
- The brand on the door or the breaker faces. Federal Pacific panels usually read “Federal Pacific Electric” or “FPE”; Zinsco panels read “Zinsco”, or on later stock “Sylvania” or “Sylvania-Zinsco”. Finding a Square D, Eaton, Cutler-Hammer, Siemens or GE panel here is the ordinary result and is not a finding — those are current, supported lines with breakers on the shelf.
- The conductors landing on the 15 and 20 A breakers. Silver-coloured rather than copper is the 1965–1973 solid-aluminum branch-circuit question, and it is repaired at the terminations, not by replacing the panel. The aluminum feeder between meter and panel, and the aluminum service conductors overhead, are normal on houses of every era and are a different thing entirely.
- Whether the kitchen counter, bathroom, garage and exterior receptacles have GFCI protection, and whether the test button actually trips them.
With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work. It offers to start from the 1,088 sq ft on the assessor record; every other value is yours to enter. Open the load calculator
What these jobs cost here
200 A per a 2019 permit that passed final inspection — an upgrade is not the job here.
Air conditioning or heat pump replacement Estimate
$13,500
Most jobs like this land between $10,900 and $16,600.
Priced from 1,088 sq ft → about 2 tons, the size most Tucson quotes start from (about one ton per 500 sq ft); cooling on the assessor record reads “Refrigeration”; City of Tucson permit fee.
Priced for a one-story home. The assessor records a built-up roof, so the patch around the new unit has to be re-coated, and your roof warranty may require the original roofer.
What would move this price
- Only if the duct has to be replaced — no record carries its condition, and on an attic system at this age it is a real possibility +$5,000
- Only if it is a foam or built-up roof that has to be re-coated at the patch +$900
If every one of those turned out to apply, this becomes about $22,500. That is the worst realistic case.
- Most Tucson houses carry a packaged unit on the roof, and how easy that roof is to reach is worth more than a thousand dollars of difference on the same equipment.
- If you are told a heat pump means you need a 200 A service, ask which load. It is almost never the compressor — a 5-ton outdoor unit is about a 31 A circuit. It is the electric BACKUP HEAT STRIP, which on a large kit can be a 109 A circuit on its own. In Tucson's mild heating season the strip kit can often be sized far smaller, or left out, and the service question disappears with it.
- Equipment here lasts ten to fourteen years, not the fifteen to twenty you will read nationally — a rooftop package unit at the short end. Replace rather than repair if the unit is twelve or more and the repair is over $1,500, if the compressor has failed and it is eight or more, or if the repair is over 40% of a new system.
- Most Tucson quotes size the unit at about one ton per 500 sq ft. A Manual J load calculation often comes out smaller, which means cheaper equipment and a unit that runs long enough to dry the air in the monsoon. Ask for the Manual J before you accept the tonnage.
The label in your panel is the final word; the permit on record is T19CM06446. If you need more circuits rather than more service, a subpanel is the far cheaper job.
- The duct. No record carries its condition, and on a Tucson house with duct in an unconditioned attic it is often worth more than a bigger machine.
- Whether that floor area is all conditioned space. An assessor figure can include a garage, an enclosed porch or an addition that was never cooled, and every square foot of that oversizes the equipment this page priced.
Price it for your house — change the assumptions (the panel’s location, the duct, the tonnage, whether the service is overhead or underground) and watch the number move.
Solar on this property
Solar was permitted here in 2019 and passed final inspection, about 7.56 kW per the permit. What that means if you add anything: the panel’s busbar already carries the solar backfeed, so an EV charger, a heat pump or a bigger air conditioner has to fit what is left under the 120% rule in NEC 705.12, not just the service size. Check the busbar rating on the panel label before you add a load.
A battery, more panels or an EV charger tied to the solar is new permitted work, and anything that changes the solar connection usually needs a new interconnection application with TEP. TEP credits exported surplus at its RCP rate — about 5¢/kWh for new applications, locked for 10 years — so sizing to the home’s own use matters more than filling the roof.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 116260700 ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 116260700
- Year constructed
- 1965 (county record)
- Permitting authority
- Tucson
- Zoning
- R-1
- Living area
- 1,088 sq ft
- Cooling
- Refrigeration
- Heating
- Forced Air
- Electrical service
- 200 A per a 2019 permit that passed final inspection. The label in your panel is the final word.
Living area, cooling and heating come from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.
What this means for work here
The most recent permit with evidence of issuance is dated 2019. City records show the permit was finalized. The permit covers only the work described in that record.
What that reading rests on. The issuing offices hold 5 building permits for this parcel dated between 2010 and 2019. Three trade permits and two solar permits. 2 of them carry a final inspection; the other 3 were issued, expired or are still open, which is not the same as work completed. There is 1 code-enforcement case recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
City permit record (5): 2019 T19CM06446 · 2019 T19CM05785 · 2019 T19CM04545 · 2016 T16CM03254 · 2010 T10EL00253
Code enforcement cases (1): 2015 T15DV00077
Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 116260700.
See an error? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All homes in 85745 · Homes by ZIP code · Commercial property in 85745 · Permit data by neighborhood
Planning work at this home?
Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.
Want a plain-English brief of this record first?
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Permanent link: Electrical permit history for 218 S Avenida Del Porvenir (aztucsonelectricalsolutions.com/property/116260700/218-s-avenida-del-porvenir-tucson-az-85745)
Electrical summary — 218 S Avenida Del Porvenir, Tucson, AZ 85745
Parcel 116260700Year built 1965Living area 1,088 sq ftPermit history City of TucsonRecord checked 13 Nov 2026
- Electrical service: upgraded to 200 A in 2019, passed final inspection.
- Watch for: built 1965, the years some homes got aluminum branch wiring. Worth a look at the outlets and panel.
- Other work on record: solar added 2019.
Permits on record, newest first
| Date | Permit | Type | Status |
|---|---|---|---|
| Sep 2019 | T19CM06446 | Electrical service/panel | Final |
| Aug 2019 | T19CM05785 | Solar | Final |
Voided or withdrawn permit records: 3 (not listed).
Era flags
- Built 1965–1973: the years some homes got solid aluminum branch wiring.
- Built before 1996: GFCI outlets were not required at all kitchen counters.
- Built before 2008: AFCI breakers were not required in most rooms.
Ask the home inspector to check
- The 15 and 20 A circuits for solid aluminum wiring (silver-colored wire at outlets and breakers).
- That the main breaker reads 200 A and the panel label matches the 2019 upgrade.
- The solar breaker and the panel’s busbar rating before adding an EV charger or heat pump (the 120% rule).
Live report: https://www.aztucsonelectricalsolutions.com/property/116260700/218-s-avenida-del-porvenir-tucson-az-85745
How this property compares nearby
Built in 1965 — earlier than about 82% of the 12,496 homes in ZIP 85745. 1,088 sq ft of living area — below this ZIP’s median of 1,696 sq ft. About 22% of homes in this ZIP still cool with evaporative — this one has moved to refrigeration cooling. Properties on S AVENIDA DEL PORVENIR hold 40 City permits on record, 9 of them since 2022.
Counts and years from the same public records.
How this report was built
This is a reading of public records for parcel 116260700 — 5 City permits on file from 2010 to 2019 and 1 code enforcement case — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year, living area, cooling, heating, roof and walls on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 22 Sep 2026 and compared against the City’s 13 Nov 2026 permit export, with no change for this parcel.
What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.
Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
Permit history: City of Tucson addresses, back to the mid-1990s. Elsewhere in Pima County: property facts from the Assessor, no permit history yet.