Electrical permit history — 267 S Avenida Del Convento
267 S Avenida Del Convento, Tucson — built 2017, with 120 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
267 S Avenida Del Convento
Built 2017 — 2010s commercial stock · 1 open code case · 120 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 267 S Avenida Del Convento (aztucsonelectricalsolutions.com/property/11620636b/267-s-avenida-del-convento-tucson-az-85745) · Public records last checked 2026-08-16
- Parcel
- 11620636B
- Built
- 2017 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- I-1
- Assessor use
- Municipal Commercial Property
- Parcel size
- 1.48 acres
- Building area
- 10,014 sq ft (assessor record)
- Sewer
- Connection on file (2017, 2024) (county sewer connection records)
- Flood zone
- X (shaded) — 0.2% annual-chance flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2025 (1 year ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0425-00310 — ADDING NOTIFICATION TO STORAGE CONVEX BEING UPGRADED TO A COMMISARY
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth looking at
There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.
- Worth confirming
A pool or spa was permitted in 2023. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2026-06-30 (TF-FOP-0626-00915) — July 4th, 2026, in the Mercado District. food trucks /concert at MSA.
Permit history (120)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-06-30finaled | TF-FOP-0626-00915City permit record | Fire OperationalJuly 4th, 2026, in the Mercado District. food trucks /concert at MSA | Complete | |
| 2025-10-23 | TR-ROW-1025-01317City permit record | Right-of-Way (ROW)The 36th Annual All Souls Procession Weekend is a cultural and economic staple for the City of Tucson-Drawing over 150,000 participants from all over the world and generating over $30M in economic impacts. The Main Event Sunday November 9, 2025 | Void | |
| 2025-09-30finaled | TF-FOP-0925-01294City permit record | Fire OperationalMercado Flea market 10/12 | 9am-3pm 11/16 | 9am-3pm 12/14 | 9am-3pm 01/11 | 9am-3pm 2/08 | 9am-3pm 03/08 | 9am-3pm 04/12 | 9am-3pm | Complete | |
| 2025-09-12finaled | TF-FOP-0925-01211City permit record | Fire OperationalThe 36th Annual All Souls Procession | Complete | |
| 2025-09-12finaled | TR-ROW-0925-01118City permit record | Right-of-Way (ROW)The 36th Annual All Souls Procession Main event day 11/9/2025 4 pm-10 pm The All Souls Procession is a cultural and economic staple for The City of Tucson-drawing upwards of 200,000 participants from all over the planet and generating $30M in impacts annually. Traffic control set up and take down: Generally pre staging in the am hours and closures beginning around 4 pm and tear down that evening post event | Complete | |
| 2025-08-21 | TF-FOP-0825-01128City permit record | Fire OperationalVOID - Submit 30 days before event - 19th Annual TMC A-Mountain Half-Marathon running race, staged on CUSHING, just west of Convento. Approx 1000 runners, with approx 10 10x10 tents, three food trucks, an inflatable start/finish line with 1 or 2 personally-owned generators. Randy Accetta 520-991-0733 | Void | |
| 2025-08-21finaled | TR-ROW-0825-01040City permit record | Right-of-Way (ROW)19th TMC A-Mountain Half-Marathon Events scheduled for Sunday, October 19, 2025 is the 2025 edition of a long-standing charity running event. This year's event will be staged primarily on CUSHING STREET, West of Convento and EAST of Grande. The route will include Sentinel Peak, Grande, and The Loop river path. The staging time will be approximately 4:30 am - 11:55 am on Sunday, morning, October 19th. Traffic control set up and take down: 5am - 11:50am | Complete | |
| 2025-07-09 | TR-ROW-0725-00894City permit record | Right-of-Way (ROW)As requested, I am submitting this online ROW request for the annual TMC A-Mountain Half-Marathon fundraising running event on Sunday, October 25, 2025 | Needs resubmittal |
112 older records are not shown here. — each links to its official file.
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (4)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2025-10-10 | CE-VIO1025-04472Code enforcement case | Work without permit | Closed - resolved |
| 2025-01-23 | TR-NOV0125-00001Code enforcement case | Code enforcement case | Received |
| 2021-01-27 | T21DV00423Code enforcement case | Refuse | Complian |
| 2018-05-01 | T18DV02467Code enforcement case | Code enforcement case | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 11620636B — 120 permits on file from 2016 to 2026 (44 fireoper, 16 combo, 15 fire operational, 15 firecons) and 4 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
