Electrical permit history — 255 N Commerce Park Lp

255 N Commerce Park Lp

  • Electrical service: no service or distribution permit on record for this 2002 building.
  • Watch for: built 2002; the live question is spare capacity for new loads, not the age of the gear.
  • Other work on record: solar added 2022, fire automatic extinguishing system permit 2020, addition or alteration permit 2020 (expired without a final), and 22 more — see the records below.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Request a site visit

Is it time to upgrade?

Probably not: no service or distribution work is on record, which is normal for a building built in 2002.

  • Electrical service & distributionLooks currentNo service or distribution permit on record for this 2002 building. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Worth knowing: a 2022 trade permit permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalLikely needs attentionLast permitted 2008 (18 years ago) — the permit passed final inspection. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T08CM00097 — TI: HVAC UPGRADE
  • Fire alarm & life safetyLooks currentLast permitted 2020 (6 years ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T19FC01080 — Add to existing Fire Alarm - adding 5 control relays so the Fire alarm can interface with teh rolling storage shelves
  • RoofWorth checkingNo permit on record names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

What that usually means electrically

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear.

  • Worth confirming

    Solar was permitted here in 2022. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

  • Routine

    A trade permit was pulled in 2010. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Solar was permitted here in 2022 — the arithmetic below is for the whole roof; an existing array changes what is left.

Roof footprint
≈ 71,988 sq ft (county building-footprint layer)
Usable for solar, planning estimate
≈ 50,400 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 550 kW — roughly 1,380 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 900,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
Estimate $72,000–$117,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 2.2 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

See the property

Satellite imagery © Google.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
11619377B
Year constructed
2002 (assessor record)
Permitting authority
Tucson
Zoning
PAD-4
Property type
Warehousing Off/Retail Interior @ .26-.60
Building area
71,818 sq ft
Electrical service
No service or distribution permit on record for this 2002 building. (the era estimate is from the year built, 2002 — not a measurement)

Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2022. City records show the permit was finalized. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 32 building permits for this parcel dated between 2002 and 2022. Nine addition or alteration permits, eight fire automatic extinguishing system permits, four grading permits and three trade permits. 23 of them carry a final inspection; the other 9 were issued, expired or are still open, which is not the same as work completed.

Street and utility work at this address. The City’s file also shows one right-of-way or utility permit here (2025) — work in the street or on a utility’s lines, not on the building, so it is left out of the counts above.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 11619377B.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All industrial property · Commercial property in 85745 · Commercial & industrial reports · Homes in 85745 · Permit data by neighborhood

Planning heavy-power or service-capacity work here?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Request a site visit

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Properties on N COMMERCE PARK LP hold 161 City permits on record, 50 of them since 2022.

Counts and years from the same public records.

Complete permit record (32 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2022TC-COM-1022-00002Commercial Trade PermitIn Review
2022T21CM09780Commercial Trade PermitComplete
2020T20FC00639Fire Automatic Extinguishing System PermitComplete
2020T20CM00809Commercial Addition/Alteration PermitExpired
2020T19FC01080Fire Alarm System PermitComplete
2018T18CM07224Commercial Addition/Alteration PermitComplete
2018T18BA00054Stormwater BasinApproved
2017T17FC00711Fire Alarm System PermitExpired
2016T16CM06997Commercial Addition/Alteration PermitComplete
2016T16BU01183Fire Automatic Extinguishing System PermitComplete
2011T11BU00234GradingComplete
2011D10-0027Development PackageComplete
2011T11BU00027Fire Automatic Extinguishing System PermitCanceled
2011T11CM00004Commercial Addition/Alteration PermitComplete
2010CWH-10-0027Commercial Water Harvesting OrdinanceActive
2010T10BU01020GradingComplete
2010T10BU00769Commercial Trade PermitComplete
2010T10BU00214Fire Automatic Extinguishing System PermitCanceled
2009T09CM02423Commercial Addition/Alteration PermitComplete
2008T08CM00097Commercial Addition/Alteration PermitComplete
2007T07CM03436Commercial Addition/Alteration PermitComplete
2007T07BU00536Commercial Addition/Alteration PermitComplete
2007T07BU00226Fire Automatic Extinguishing System PermitComplete
2006T06CM04015Commercial Addition/Alteration PermitComplete
2005T05BA00148Stormwater BasinApproved
2005T05BA00149Stormwater BasinApproved
2002T02BU02648Fire Automatic Extinguishing System PermitComplete
2002T02BU02340Fire Automatic Extinguishing System PermitComplete
2002T02BU01481Fire Automatic Extinguishing System PermitComplete
2002T02CM00633Commercial New Building PermitComplete
2002T02BU00182GradingComplete
2002T02BU00210GradingComplete

How this report was built

This is a reading of public records for parcel 11619377B — 32 City permits on file from 2002 to 2022 and 1 street or utility permit — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.