Electrical permit history — 320 N Commerce Park Lp

320 N Commerce Park Lp

  • Electrical service: a 2026 service or distribution permit is on record but is not closed (no final inspection).
  • Watch for: built 2000; gear this age is due for infrared scanning and torque checks.
  • Other work on record: addition or alteration permit 2026 (permit not closed), floodplain use permit 2026 (permit not closed), solar added 2025, and 19 more — see the records below.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Request a site visit

Is it time to upgrade?

Worth checking: a 2026 service permit is on record but is not closed.

  • Electrical service & distributionWorth checkingA 2026 service or distribution permit is on record but is not closed (no final inspection). The nameplate on the service equipment is the final word. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TC-COM-0826-01258 — Installation of 3 EV chargers on existing electrical service.
  • Heating, cooling & mechanicalWorth checkingA 2023 permit covers this work, but the record shows no final inspection (official status: Issued). TC-COM-1023-02428 — Air Handler replacement
  • Fire alarm & life safetyLikely needs attentionLast permitted 1999 (27 years ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T99BU02374 — FIRE SPKR:ADD 235
  • RoofWorth checkingNo permit on record names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear.

  • Worth confirming

    Solar was permitted here in 2025. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

  • Routine

    A trade permit was pulled in 2010. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Solar was permitted here in 2025 — the arithmetic below is for the whole roof; an existing array changes what is left.

Roof footprint
≈ 29,333 sq ft (county building-footprint layer, 2 structures; 2 neighbouring structures crossing the lot line excluded)
Usable for solar, planning estimate
≈ 20,500 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 230 kW — roughly 580 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 380,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
Estimate $30,000–$49,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 2.2 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

See the property

Satellite imagery © Google.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
11619360D
Year constructed
2000 (assessor record)
Permitting authority
Tucson
Zoning
PAD-4
Property type
Municipal Commercial Property
Building area
56,278 sq ft
Electrical service
A 2026 service or distribution permit is on record but is not closed (no final inspection). The nameplate on the service equipment is the final word. (the era estimate is from the year built, 2000 — not a measurement)

Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2026. The work was permitted, but final completion is not confirmed. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 30 building permits for this parcel dated between 1999 and 2026. Eight fire automatic extinguishing system permits, five trade permits, four addition or alteration permits and four solar permits. 16 of them carry a final inspection; the other 14 were issued, expired or are still open, which is not the same as work completed. There is 1 code-enforcement case recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 11619360D.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All institutional and public property · Commercial property in 85745 · Commercial & industrial reports · Homes in 85745 · Permit data by neighborhood

Planning facility electrical or compliance work here?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Request a site visit

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Properties on N COMMERCE PARK LP hold 161 City permits on record, 50 of them since 2022.

Counts and years from the same public records.

Complete permit record (31 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TC-COM-0826-01258Commercial Trade PermitInspections
2026TC-COM-0126-00093Commercial Addition/Alteration PermitInspections
2026TE-FPU-0326-00084Floodplain Use PermitIssued
2025TC-COM-1125-02159Commercial Solar PermitInspections Complete
2025TC-COM-1125-02158Commercial Solar PermitInspections
2025TC-COM-1025-01916Commercial Solar PermitInspections
2025TC-COM-1125-02160Commercial Solar PermitInspections Complete
2025TD-DEV-0625-00167Development PackageInspections Complete
2025TP-PRE-0425-00081Pre-Application ConferenceComplete
2023TC-COM-1023-02428Commercial Trade PermitIssued
2023TC-COM-0723-01697Commercial Trade PermitIssued
2020T20CM07986Commercial Trade PermitApproved
2013T13DV09131COMMERCIAL ZONINGCOMPLIAN
2010T10PL00879Residential Trade PermitComplete
2006T06CM05031Commercial Addition/Alteration PermitComplete
2006T06OT02459Floodplain Use PermitComplete
2006T06BU01420Fire Automatic Extinguishing System PermitComplete
2006T06CM01449Commercial Addition/Alteration PermitComplete
2006T06OT00778Floodplain Use PermitSubmitted
2000T99BU03138Commercial Addition/Alteration PermitCanceled
1999T99BU02374Fire Automatic Extinguishing System PermitComplete
1999T99BU02375Fire Automatic Extinguishing System PermitCanceled
1999T99BU02337Fire Automatic Extinguishing System PermitWithdrawn
1999T99BU02335Fire Automatic Extinguishing System PermitWithdrawn
1999T99BU02250Fire Automatic Extinguishing System PermitComplete
1999T99BU02249Fire Automatic Extinguishing System PermitComplete
1999T99BU02197Fire Automatic Extinguishing System PermitComplete
1999T99CM00949Commercial New Building PermitComplete
1999T99CM00944Commercial New Building PermitComplete
1999T99BU01389GradingComplete
1999D98-0069Development PackageApproved

How this report was built

This is a reading of public records for parcel 11619360D — 30 City permits on file from 1999 to 2026 and 1 code enforcement case — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.