Electrical permit history — 265 N Granada Av

265 N Granada Av, Tucson — built 1984, with 49 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Multifamily property

265 N Granada Av

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1984 — 1980s multifamily stock · HVAC 1997 (finaled)

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service or distribution work shows in the record we read. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalLikely dueLast permitted 1997 (29 years ago). The assessor records cooling as WARMED AND COOLED AIR and heating as Forced Air. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T97ME00297 — BOILER:REPAIR
  • Fire alarm & life safetyFinaled permit foundLast permitted 2021 (5 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T21FC00629 — To remove and replace the alarm panel.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. The assessor records the roof as Clay Tile. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Solar was permitted here in 2023. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

  • Worth confirming

    There is an electrical reconnect permit from 2021. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

  • Worth confirming

    A pool or spa was permitted in 2004. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Routine

    A trade permit was pulled in 2016. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 80,083 sq ft (county building-footprint layer, 27 structures; 3 neighbouring structures crossing the lot line excluded)
Usable for solar, planning estimate
≈ 56,100 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 620 kW — roughly 1,550 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 1,020,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$82,000–$133,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 1.9 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
11619227A
Year constructed
1984 (assessor record)
Permitting authority
Tucson
Zoning
PAD-2
Property type
Apartments 100+ Units 3 Or More Story
Building area
109,390 sq ft
Cooling
WARMED AND COOLED AIR
Heating
Forced Air

The building area, cooling and heating above come from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2023. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2023. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 49 building permits for this parcel dated between 1997 and 2023. By category the work is addition / alteration (13), trade permit (10), fire automatic extinguishing system (9) and zoning compliance (5). 36 of them carry a final inspection; the other 13 were issued, expired or are still open, which is not the same as work completed. There are 8 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 11619227A. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85701 · Commercial & industrial reports · Homes in 85701 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on N GRANADA AV hold 219 City permits on record, 93 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (57 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2024CE-VIO0724-02763Code enforcement caseClosed - Unfounded
2024CE-VIO0524-01640Code enforcement caseClosed - Unfounded
2023T22CM05250Commercial Solar PermitComplete
2022T22CM06319Commercial Trade PermitIssued
2022T22DV03922OBSTR DEAD TREES AND SHRUBSCOMPLETE
2022T22SA00035Zoning ComplianceComplete
2021T21CM06585Commercial Trade PermitComplete
2021T21FC00629Fire Alarm System PermitComplete
2021T21DV04560EMERGENCYCOMPLIAN
2020T20SA00097Zoning ComplianceComplete
2017T17CM06841Commercial Addition/Alteration PermitCanceled
2017T17CM06372Commercial Addition/Alteration PermitComplete
2017T17CM06375Commercial Addition/Alteration PermitCanceled
2017T17CM06377Commercial Addition/Alteration PermitComplete
2017T17CM06378Commercial Addition/Alteration PermitCanceled
2017T17CM06380Commercial Addition/Alteration PermitCanceled
2017T17CM06371Commercial Addition/Alteration PermitComplete
2017T17CM06373Commercial Addition/Alteration PermitCanceled
2017T17CM06374Commercial Addition/Alteration PermitCanceled
2017T17CM06376Commercial Addition/Alteration PermitCanceled
2017T17CM06379Commercial Addition/Alteration PermitCanceled
2017T17OT01077Permanent Sign PermitComplete
2017DP17-0221Development PackageIssued
2016T16SA00308Zoning ComplianceCanceled
2016T16CM05088Commercial Trade PermitComplete
2016T16DV03019CAR THROUGH COMMERCIAL BUILDINCOMPLIAN
2016T16DV00082DILAPIDATED STRUCTURENOVERIFY
2013T13DV00093CLEAN CITIES INITIATIVE PGRMNOVERIFY
2008T08SA00321Zoning ComplianceComplete
2008T08SA00217Zoning ComplianceComplete
2008T08DV00856RESIDENTIAL ZONINGCOMPLIAN
2007S07-149 Subdivision/PlatsCanceled
2006T06OT00380Permanent Sign PermitComplete
2005T05BU00928Fire Automatic Extinguishing System PermitComplete
2005T05BU00722Fire Automatic Extinguishing System PermitComplete
2005T05BU00651Fire Automatic Extinguishing System PermitComplete
2005T05BU00490Commercial Trade PermitComplete
2005T05BU00500Fire Automatic Extinguishing System PermitComplete
2005T05BU00488Commercial Trade PermitComplete
2005T05BU00489Commercial Trade PermitComplete
2005T05BU00470Fire Automatic Extinguishing System PermitComplete
2005T05CM00237Commercial Addition/Alteration PermitComplete
2005T05BU00311Fire Automatic Extinguishing System PermitComplete
2004T04BU03021Commercial Pool/Spa PermitComplete
2004T04BU02910Commercial Addition/Alteration PermitWithdrawn
2004T04BU02888Fire Automatic Extinguishing System PermitComplete
2004T04BU02889Fire Automatic Extinguishing System PermitComplete
2004T04BU02887Fire Automatic Extinguishing System PermitComplete
2004T04PL01916Commercial Trade PermitComplete
2004T04CM02556Commercial New Building PermitComplete
2004T04CM02558Commercial New Building PermitComplete
2004T04CM02433Commercial New Building PermitComplete
2004T04BU02119GradingComplete
1999T99VL01482Permanent Sign PermitComplete
1997T97EL02158Commercial Trade PermitComplete
1997T97EL01866Residential Trade PermitComplete
1997T97ME00297Commercial Trade PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 11619227A — 49 City permits on file from 1997 to 2023 and 8 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area, cooling, heating, roof, walls on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-08-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.