Electrical permit history — 440 N Grande Av

440 N Grande Av, Tucson — built 1983, with 30 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

440 N Grande Av

Built 1983 — 1980s commercial stock · 30 permits on record; no permitted panel/service or HVAC work among them

Parcel
11619219B
Built
1983 (county record)
Jurisdiction
Tucson
Zoning
PAD-4
Assessor use
Privately Owned Academic School - Charter
Parcel size
1.39 acres
Building area
19,012 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 440 N Grande Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2017 (9 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T17FC00671 — *** NO PLANS *** Modify existing wet pipe Fire Sprinkler system
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Solar was permitted here in 2024. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

Most recent permit on record for this parcel: 2026-03-26 (TC-COM-0326-00425) — AS-BUILT PLAN FOR EXISTING CLASSROOM BUILDING AT NOSOTROS ACADEMY.

Permit history (30)

Permit history for this parcel — 8 of 30 records
DateRecordWhatStatusValue
2026-03-26TC-COM-0326-00425City permit recordCommercial BuildingAS-BUILT PLAN FOR EXISTING CLASSROOM BUILDING AT NOSOTROS ACADEMYWithdrawn
2026-03-26TC-COM-0326-00426City permit recordCommercial BuildingAS-BUILT PLANS FOR EXISTING CLASSROOM BUILDING AT NOSOTROS ACADEMY FOR CERTIFICATE OF OCCUPANCYNeeds resubmittal
2024-08-14finaledTC-COM-0824-01596City permit recordSolar PVBUILDING 2 PV SOLAR SYSTEM (MASTER PLAN SET UNDER TC-COM-0624-01142)Inspections complete
2024-08-14finaledTC-COM-0824-01597City permit recordCommercial BuildingBUILDING 3 NORTH PV SYSTEM (POI 3), MASTER PLANSET IS UNDER TC-COM-0624-01142Inspections complete
2024-08-14expired 2025-02-10TC-COM-0824-01598City permit recordSolar PV"Void - Duplicate/Same scope of work as existing application permit number #TC-COM-0824-1597. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf " BUILDING 3 SOUTH PV SOLAR SYSTEM (POI 4). MASTER PLAN SET UNDER TC-COM-0624-01142Void
2024-08-14finaledTC-COM-0924-01868City permit recordCommercial BuildingBUILDING 3 SOUTH PV SYSTEM (POI 4), MASTER PLANSET IS UNDER TC-COM-0824-01597. Structural/electrical inspections and all other conditions are under approved permit TC-COM-0824-01597 Permit is for Interconnection and TEP clearance for POI-04Inspections complete
2024-06-13finaledTC-COM-0624-01142City permit recordSolar PVINSTALLATION OF 99.55KWDC SOLAR PV SYSTEM, MOUNTED ON 3 NEW CANOPY STRUCTURES, (2) MAIN SERVICE COMBINATIONS OF SINGLE PHASE METER PACK SERVICESInspections complete
2024-04-02expires 2027-06-27TD-DEV-0424-00112City permit recordDevelopment PackageRestricted Access - INSTALLATION OF (3) NEW CANOPY STRUCTURES AT CHARTER SCHOOLIssued
Show 22 older records
Permit history for this parcel — remaining 22 records
DateRecordWhatStatusValue
2024-01-29TF-FCP-0124-00072City permit recordFire ConstructionWITHDRAWN - should go to AZSFM per Patricia Shelton - Add one Smoke, One Pull, and One Horn Strobe to exisitng FACP at Nosotros Academy.Withdrawn
2023-06-26expired 2023-12-23TC-COM-0623-01574City permit recordCommercial BuildingADD DOOR IN PLACE OF WINDOW REMOVE NON-BEARING PARTITIONExpired
2023-06-22expired 2023-12-19TC-COM-0623-01551City permit recordFence / wallVOID -Duplicate Application. There is already a permit in process for this address (T22CM07008). REPLACE WINDOW WITH DOOR REMOVE INTERIOR WALL AND DOOR ADD NON-BEARING PARTITIONVoid
2023-04-06TF-FCP-0423-00564City permit recordFence / wallVOID-CHARTER SCHOOL SHOULD GO THROUGH THE STATE FIRE MARSHALL-Add 3 Sidewall sprinklerVoid
2023-01-10finaledTR-ROW-0123-00230City permit recordRight-of-Way (ROW)Remove and replace 80’L X 4’W sidewalk. - Emergency after the fact permit.Complete
2023-01-09TR-ROW-0123-00227City permit recordRight-of-Way (ROW)Remove and replace 80’L X 4’W sidewalk.Withdrawn
2022-09-13expired 2025-01-27T22CM07008City permit recordCommercial BuildingNEW OFFICES AND TEACHERS LOUNGEInspections
2019-10-24finaledT19RW06450City permit recordROWINSTALLATION OF SMALL CELL EQUIPMENT MOUNTED ON EXISTING COX STRAND ON THE NORTH SIDE OF 440 N GRANDE AVEFinal
2019-10-24finaledT19RW06459City permit recordROWTEP will be removing 1 pole (51) in the ROW a 2'x2' hole 6' deep will be backfilled without sidewalk impact. NOTES: This road is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS. BUSINESS ACCESS MUST BE MAINTAINED AND SIGNEDFinal
2017-08-18T17CM06404City permit recordCOMBOREPL 2" BACKFLOW VALVEVoid
2017-08-14finaledT17FC00671City permit recordFIRECONS*** NO PLANS *** Modify existing wet pipe Fire Sprinkler systemFinal
2010-09-16T10CM02589City permit recordCOMBOTI/REMODEL: KITCHEN FOR NOSOTROS ACADEMYWithdrwn
2006-03-22finaledT06OT00823City permit recordSIGN10886Final
2005-10-03finaledT05BU02437City permit recordSPKLRFIRE SPKR: UNDERGROUND PIPE 112'4"Final
2005-08-22finaledT05BU02112City permit recordSPKLRFIRE SPKR :NEW 135Final
2005-08-04finaledT05BU01959City permit recordBUILDFIRE ALARM SYSTEMFinal
2005-06-24finaledT05CM03099City permit recordCOMBOTI: SCHOOLC of o
2002-07-31expired 2002-09-29T02EX00893City permit recordEXCAVEXC: 38 FT TRENCH-RELOCATE FIRE HYDRANTClosed
2002-05-13T02AN00416City permit recordADDRNEWIssued
2002-05-13finaledT02CM02379City permit recordCOMBOTI:CHARTER SCHOOLC of o
2002-05-13finaledT02CM02380City permit recordCOMBOTI:CHARTER SCHOOLC of o
1997-11-04expired 1998-05-04T97PL01823City permit recordPLUMBWATER HEATER:REPLACEMENTExpired

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (1)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 1 of 1 records
DateRecordWhatStatus
2009-01-05finaledT09FR00012Code enforcement caseCode enforcement caseComplete

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 11619219B — 30 permits on file from 1997 to 2026 (6 commercial building, 5 combo, 3 solar pv, 2 fence / wall) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.