Electrical permit history — 1707 W Saint Marys Rd
1707 W Saint Marys Rd, Tucson — built 1974, with 118 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
1707 W Saint Marys Rd
Built 1974 — 1970s commercial stock · 118 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 1707 W Saint Marys Rd (aztucsonelectricalsolutions.com/property/11615087d/1707-w-saint-marys-rd-tucson-az-85745) · Public records last checked 2026-08-16
- Parcel
- 11615087D
- Built
- 1974 (county record)
- Jurisdiction
- Tucson
- Zoning
- O-3
- Assessor use
- Medical Clinic
- Parcel size
- 3.82 acres
- Building area
- 55,016 sq ft (assessor record)
- Sewer
- Connection on file (2011, 2017, 2026) (county sewer connection records)
- Flood zone
- X (shaded) — area protected by levee (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 pool / spa permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 pool / spa permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted this year (2026). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0426-00252 — 2nd Floor TI Suite 235 - Modify existing fire alarm system: Providing new devices, relocate and demo existing devices as shown on drawings.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
A pool or spa was permitted in 2026. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Routine
Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2015-09-01 | $43,220,674 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-08-14 (TC-CFO-0826-00142) — Tenant Improvement in an existing shell space on the 2nd floor.
Permit history (118)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-08-14 | TC-CFO-0826-00142City permit record | Pool / spaTenant Improvement in an existing shell space on the 2nd floor | Submitted - online | |
| 2026-08-12finaled | TC-CFO-0826-00139City permit record | Pool / spaThis project needs the okay for a Temporary Certificate of Occupancy (TCO) from an Engineering Inspector and the TCO level for the building. The most recent Engineering inspection did not allow for a TCO. Once okay is given for TCO, please re-request TCO. If you have any questions, please contact CDRC@tucsonaz.gov Tenant Improvement in an existing shell space on the 2nd floor | Complete | |
| 2026-06-22finaled | TF-FOP-0626-00881City permit record | Fire OperationalMedical Office B Occupancy 40 people. Renewal on Tucson Fire Permit | Complete | |
| 2026-04-19finaled | TF-FCP-0426-00252City permit record | Fire Construction2nd Floor TI Suite 235 - Modify existing fire alarm system: Providing new devices, relocate and demo existing devices as shown on drawings. | Complete | |
| 2026-03-18finaled | TF-FCP-0326-00178City permit record | Fire ConstructionModify existing fire sprinkler system. | Complete | |
| 2025-12-17expires 2027-08-16 | TC-COM-1225-02282City permit record | Pool / spaTenant Improvement in an existing shell space on the 2nd floor | In review | |
| 2025-10-08finaled | TF-FOP-1025-01330City permit record | Fire OperationalMedical Office | Complete | |
| 2025-09-09finaled | TF-FOP-0925-01198City permit record | Fire OperationalMedical Facility | Complete |
110 older records are not shown here. — each links to its official file.
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (6)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2017-09-18 | T17DV04637Code enforcement case | Vegetation | Referred |
| 2011-07-29 | T11FR01041Code enforcement case | Code enforcement case | Field |
| 2010-08-04finaled | T10FR01603Code enforcement case | Code enforcement case | Complete |
| 2010-05-10finaled | T10FR00933Code enforcement case | Fire | Complete |
| 2010-03-22finaled | T10FR00613Code enforcement case | Code enforcement case | Complete |
| 2005-11-22 | T05ZV00683Code enforcement case | Code enforcement case | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 11615087D — 118 permits on file from 1997 to 2026 (27 c-of-o, 16 combo, 14 firecons, 12 fire operational) and 6 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
