Electrical permit history — 2220 N Silverbell Rd

2220 N Silverbell Rd

  • Electrical service: no service or distribution permit on record for this 2013 building.
  • Watch for: built 2013; the live question is spare capacity for new loads, not the age of the gear.
  • Other work on record: permanent sign permit 2014, fire automatic extinguishing system permit 2013, new-construction permit 2013, and 26 more — see the records below.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Request a site visit

Is it time to upgrade?

Probably not: no service or distribution work is on record, which is normal for a building built in 2013.

  • Electrical service & distributionLooks currentNo service or distribution permit on record for this 2013 building. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Worth knowing: a 2013 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalWorth checkingNo permit on record names this system. Worth knowing: a 2013 fire automatic extinguishing system permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. The assessor records cooling as WARMED AND COOLED AIR and heating as Forced Air. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyLooks currentLast permitted 2013 (13 years ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T13BU00780 — FIRE SPRINKLERS
  • RoofLooks currentBuilt 2013; no permit on record since, which is normal for equipment this age. The assessor records the roof as Composition Shingle. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

What that usually means electrically

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    A capacity and condition review is the usual starting point before any tenant improvement or added load.

  • Routine

    A trade permit was pulled in 2013. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 35,722 sq ft (county building-footprint layer, 14 structures)
Usable for solar, planning estimate
≈ 25,000 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 280 kW — roughly 700 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 460,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
Estimate $37,000–$60,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 4.5 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

See the property

Satellite imagery © Google.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
11520261A
Year constructed
2013 (assessor record)
Permitting authority
Tucson
Zoning
C-1
Property type
Apartments 25 - 99 Units Subsidized Low Inc
Building area
28,167 sq ft
Cooling
WARMED AND COOLED AIR
Heating
Forced Air
Electrical service
No service or distribution permit on record for this 2013 building. (the era estimate is from the year built, 2013 — not a measurement)

Building area, cooling and heating come from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2014. City records show the permit was finalized. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 37 building permits for this parcel dated between 2005 and 2017. 11 fire automatic extinguishing system permits, 11 new-construction permits, three zoning compliance permits and two trade permits. 29 of them carry a final inspection; the other 8 were issued, expired or are still open, which is not the same as work completed. There are 4 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 11520261A.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85745 · Commercial & industrial reports · Homes in 85745 · Permit data by neighborhood

Planning multifamily electrical or metering work here?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Request a site visit

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Properties on N SILVERBELL RD hold 2,177 City permits on record, 346 of them since 2022.

Counts and years from the same public records.

Complete permit record (41 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026CE-VIO0926-03924FireClosed - Resolved
2019T19DV05724RESIDENTIAL ZONINGCOMPLIAN
2017T17BA00004Stormwater BasinApproved
2014T14OT00212Permanent Sign PermitComplete
2013T13BU00780Fire Automatic Extinguishing System PermitComplete
2013T13BU00631Commercial New Building PermitComplete
2013T13BU00622Fire Automatic Extinguishing System PermitComplete
2013T13BU00624Fire Automatic Extinguishing System PermitComplete
2013T13BU00625Fire Automatic Extinguishing System PermitComplete
2013T13BU00627Fire Automatic Extinguishing System PermitComplete
2013T13BU00601Fire Automatic Extinguishing System PermitComplete
2013T13BU00623Fire Automatic Extinguishing System PermitComplete
2013T13BU00626Fire Automatic Extinguishing System PermitComplete
2013T13BU00628Fire Automatic Extinguishing System PermitComplete
2013T13BU00629Fire Automatic Extinguishing System PermitComplete
2013T13BU00630Fire Automatic Extinguishing System PermitCanceled
2013T13CM02372Commercial Trade PermitComplete
2013T13CM01748Commercial Trade PermitComplete
2013T12CM00292Commercial New Building PermitComplete
2013T12CM00293Commercial New Building PermitComplete
2013T12CM00294Commercial New Building PermitComplete
2013T12CM00299Commercial New Building PermitComplete
2013T12CM00290Commercial New Building PermitComplete
2013T12BU00832GradingComplete
2013T12CM00291Commercial New Building PermitComplete
2013T12CM00295Commercial New Building PermitComplete
2013T12CM00296Commercial New Building PermitComplete
2013T12CM00297Commercial New Building PermitComplete
2013T12CM00298Commercial New Building PermitComplete
2013T12OT01004Floodplain Use PermitComplete
2012D11-0032Development PackageApproved
2012T12SA00242Zoning ComplianceComplete
2012S12-032 Land Split/Lot SplitComplete
2011T11BU01259GradingWithdrawn
2009T09SA00326Zoning ComplianceComplete
2009C9-81-23 RezoningWithdrawn
2008T08DV08940REFUSECANCEL
2008T08DV07150MULTIPLE TYPESNOVERIFY
2007S07-154 Subdivision/PlatsCanceled
2007T07SA00070Zoning ComplianceWithdrawn
2005S05-073 Subdivision/PlatsCanceled

How this report was built

This is a reading of public records for parcel 11520261A — 37 City permits on file from 2005 to 2017 and 4 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year, living area, cooling, heating, roof and walls on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.