Electrical permit history — 2102 N Forbes Bl

2102 N Forbes Bl

  • Electrical service: no service or distribution permit on record for this 1980 building.
  • Watch for: built 1980; distribution gear this age is often past manufacturer support.
  • Other work on record: fire automatic extinguishing system permit 2023 (expired without a final), special events fire permit - vendor permit 2023, zoning compliance permit 2022, and 7 more — see the records below.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Request a site visit

Is it time to upgrade?

Possibly: no service or distribution work is on record for this 1980 building.

  • Electrical service & distributionWorth checkingNo service or distribution permit on record for this 1980 building. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Worth knowing: a 2023 special events fire permit - vendor permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalWorth checkingNo permit on record names this system. Worth knowing: a 2023 special events fire permit - vendor permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyLikely needs attentionLast permitted 2006 (20 years ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T06BU01230 — FIRE SPRINKLER: ADD 2 RELOCATE 2
  • RoofWorth checkingNo permit on record names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear.

  • Worth confirming

    Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.

  • Routine

    A trade permit was pulled in 2017. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 13,624 sq ft (county building-footprint layer)
Usable for solar, planning estimate
≈ 9,500 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 105 kW — roughly 260 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 170,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
Estimate $14,000–$22,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Aviation Pkwy and Kino Pkwy”, is about 3.5 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

See the property

Satellite imagery © Google.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
115160480
Year constructed
1980 (assessor record)
Permitting authority
Tucson
Zoning
I-1
Property type
Warehouse W/Off/Rtl Interior @ .26-.60
Building area
11,900 sq ft
Electrical service
No service or distribution permit on record for this 1980 building. (the era estimate is from the year built, 1980 — not a measurement)

Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2023. The permit expired without a confirmed final status. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 18 building permits for this parcel dated between 2001 and 2026. Five fire automatic extinguishing system permits, five trade permits, four addition or alteration permits and one cell tower building permit. 9 of them carry a final inspection; the other 9 were issued, expired or are still open, which is not the same as work completed. There is 1 code-enforcement case recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Street and utility work at this address. The City’s file also shows one right-of-way or utility permit here (2024) — work in the street or on a utility’s lines, not on the building, so it is left out of the counts above.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 115160480.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All industrial property · Commercial property in 85745 · Commercial & industrial reports · Homes in 85745 · Permit data by neighborhood

Planning heavy-power or service-capacity work here?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Request a site visit

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Properties on N FORBES BL hold 340 City permits on record, 65 of them since 2022.

Counts and years from the same public records.

How this report was built

This is a reading of public records for parcel 115160480 — 18 City permits on file from 2001 to 2026 and 1 street or utility permit and 1 code enforcement case — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 22 Sep 2026 and compared against the City’s 13 Nov 2026 permit export, with no change for this parcel.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.