Electrical permit history — 1148 N Stone Av
1148 N Stone Av, Tucson — built 1957, with 9 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
1148 N Stone Av
Built 1957 — 1950s commercial stock · last permitted panel/service work 2025 (finaled) · HVAC 2025 (finaled)
Permanent link: Electrical permit history for 1148 N Stone Av (aztucsonelectricalsolutions.com/property/115080950/1148-n-stone-av-tucson-az-85705) · Public records last checked 2026-08-16
- Parcel
- 115080950
- Built
- 1957 (county record)
- Jurisdiction
- Tucson
- Zoning
- C-3
- Assessor use
- Municipal Commercial Property
- Parcel size
- 0.58 acres
- Building area
- 14,937 sq ft (assessor record)
- Sewer
- Connection on file (1961, 2025) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Miracle Mile Historic District — National Register district (City of Tucson)
- Service on record
- City records show the 2025 permit was finalized; the permit description states “To rehab a 49 unit motel converting the rooms to apartments with kitchenettes. Site to have the pool removed and the parking lot refinished with asphalt being replaced. Building upgrades include electrical service, mechanical units, and all plumbing. Fire sprinkler system shall be added.” — an increase in capacity as described, not a confirmed installed rating.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionCurrentLast permitted 2025 (1 year ago). The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. SD-0125-00006 — To rehab a 49 unit motel converting the rooms to apartments with kitchenettes. Site to have the pool removed and the parking lot refinished with asphalt being replaced. Building upgrades include electrical service, mechanical units, and all plumbing. Fire sprinkler system shall be added.
- Heating, cooling & mechanicalCurrentLast permitted 2025 (1 year ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. SD-0125-00006 — To rehab a 49 unit motel converting the rooms to apartments with kitchenettes. Site to have the pool removed and the parking lot refinished with asphalt being replaced. Building upgrades include electrical service, mechanical units, and all plumbing. Fire sprinkler system shall be added.
- Fire alarm & life safetyCurrentLast permitted 2025 (1 year ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. SD-0125-00006 — To rehab a 49 unit motel converting the rooms to apartments with kitchenettes. Site to have the pool removed and the parking lot refinished with asphalt being replaced. Building upgrades include electrical service, mechanical units, and all plumbing. Fire sprinkler system shall be added.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2022-07-25 | $3,250,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-07-29 (TF-FCP-0726-00489) — EXPEDITE - Install new wet pipe fire sprinkler system in existing building of the Stone Ave. Youth housing renovation..
Permit history (9)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-07-29 | TF-FCP-0726-00489City permit record | Fire ConstructionEXPEDITE - Install new wet pipe fire sprinkler system in existing building of the Stone Ave. Youth housing renovation. | In review | |
| 2026-07-07expires 2026-09-27 | TR-ROW-0726-00787City permit record | Right-of-Way (ROW)Installation of three vertical object markers in the alley east of the property. These object markers are intended to be temporary as there will be a future landscape project in this area. | Issued | |
| 2025-12-01 | TE-FPU-1225-00443City permit record | Floodplain UseCIP-1124-00036 was approved. To rehab a 51 unit motel converting them into kitchenettes. Site to have upgrades in electrical, mechanical, and plumbing. Link to TD-DEV-1125-00294 & TC-COM-1125-02156 & SD-0125-0006 & TP-PRE-1224-00273 | Issued | |
| 2025-11-26expires 2027-07-15 | TC-COM-1125-02156City permit record | Commercial BuildingCIP-1124-00036 was approved. To rehab a 51 unit motel converting them into kitchenettes. Site to have upgrades in electrical, mechanical, and plumbing. Link to TD-DEV-1125-00294 & TC-COM-1125-02156 & SD-0125-0006 & TP-PRE-1224-00273 | In revision | |
| 2025-11-25expires 2028-12-03 | TD-DEV-1125-00294City permit record | Development PackageCIP-1124-00036 -This is a City of Tucson project. HCD is rehabbing 51 units. It has also gone through HPO review and is exempt from the Flood Zone requirement. HPO and one other review is stating resubmit but that has all been cleared. | Issued | |
| 2025-01-27finaled | TC-COM-0125-00164City permit record | Commercial BuildingRun temporary gas line on exterior of building to feed hot water heaters on the first and second floors (+/-100 lf) | Complete | |
| 2025-01-14finaled 2025-11-18 | SD-0125-00006Design review | Historic Preservation Zone/Historic LandmarkTo rehab a 49 unit motel converting the rooms to apartments with kitchenettes. Site to have the pool removed and the parking lot refinished with asphalt being replaced. Building upgrades include electrical service, mechanical units, and all plumbing. Fire sprinkler system shall be added.Econolodge Stone Ave Youth Transitional Housing Project | Complete | |
| 2024-08-29finaled | TZ-CMP-0824-00119City permit record | Zoning Verification LetterHotel/ Motel/ Lodging | Complete |
Show 1 older record
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2017-06-05finaled | T17FC00466City permit record | FIRECONSFIRE ALARM PANEL INSTALL & MONITORING | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (1)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2017-12-30 | T17DV06847Code enforcement case | Code enforcement case | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 115080950 — 9 permits on file from 2017 to 2026 (2 commercial building, 1 fire construction, 1 right-of-way (row), 1 floodplain use) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).