Electrical permit history — 906 N 1st Av

906 N 1st Av, Tucson — built 1974, with 18 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

906 N 1st Av

Built 1974 — 1970s commercial stock · last permitted panel/service work 2016 (finaled) · HVAC 2016 (finaled)

Parcel
115045670
Built
1974 (county record)
Jurisdiction
Tucson
Zoning
HR-3
Assessor use
Club Lodge Fraternal/Sorority
Parcel size
0.79 acres
Building area
12,961 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
West University Historic District — Historic Preservation Zone — Contributing (City of Tucson)
Service on record
City records show the 2016 permit was finalized; the permit description states “UPGRADE UP TO 600AMP” — an increase in capacity as described, not a confirmed installed rating.

See the property

County aerial photograph centered on 906 N 1st Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentLast permitted 2016 (10 years ago). City inspection record: ELECTRIC - FINAL approved 2017-11-02. Contractor of record: MOON ELECTRIC INC. The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T16CM04777 — UPGRADE UP TO 600AMP
  • Heating, cooling & mechanicalCurrentLast permitted 2016 (10 years ago). City inspection record: BUILDING - FINAL approved 2017-12-28. Contractor of record: EDWARD S HEATING AND COOLING L L C. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T16CM08309 — HVAC REPL 4 PACKAGE UNITS
  • Fire alarm & life safetyCurrentLast permitted 2021 (5 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T21FC00670 — Moving existing Firelite MS-5UD-3 from problematic POTS lines to NAPCO SLE-LTEV-CFB LTE Communicator. Changing monitoring services.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

Most recent permit on record for this parcel: 2022-04-19 (T22CM02892) — Gas Pressure Test.

Permit history (18)

Permit history for this parcel — 8 of 18 records
DateRecordWhatStatusValue
2022-04-19finaledT22CM02892City permit recordCOMBOGas Pressure TestFinal
2022-02-26finaledT22CM01428City permit recordCOMBOGas pressure testFinal
2021-09-22finaledT21FO00635City permit recordFIREOPERKAPPA ALPHA 9/23/21 1 TENT 8AMFinal
2021-09-01finaledT21FC00670City permit recordFIRECONSMoving existing Firelite MS-5UD-3 from problematic POTS lines to NAPCO SLE-LTEV-CFB LTE Communicator. Changing monitoring services.Final
2019-10-22finaledT19RW06383City permit recordROWN.559725 TRANSFER 1 CABLE ATTACHMENT. INSTALL 1 CABLE TAG. PULL OLD POLE.Final
2019-10-18finaledT19RW06227City permit recordROWTRANSFER 1 CABLE ATTACHMENT. INSTALL 1 CABLE TAG. REMOVE OLD POLE WORK IS IN THE ALLEYFinal
2019-09-06finaledT19FO00711City permit recordFIREOPERKAPPA ALPHA (1) TENT SET UP 09.05.19Final
2017-12-21finaledT17FC01041City permit recordFIRECONSRelocate Two HeadsFinal
Show 10 older records
Permit history for this parcel — remaining 10 records
DateRecordWhatStatusValue
2016-11-02finaledT16CM08309City permit recordCOMBOHVAC REPL 4 PACKAGE UNITSL of c
2016-11-02finaledT16OT01335City permit recordFLOODPLNReplace 4 Package Units.Final
2016-10-07finaledT16RW01914City permit recordROWTEP TO REPLACE BAD POLE WORK ORDER # 6127666Final
2016-07-05T16CM05141City permit recordCOMBO3 NEW AC SYSTEMS FOR FRATERNITYWithdrwn
2016-06-21finaledT16CM04777City permit recordCOMBOUPGRADE UP TO 600AMPFinal
2009-10-19expired 2010-04-24T09PL01709City permit recordPLUMBREPLACE: WATER HEATER (APA)Expired
2008-10-10finaledT08BU01810City permit recordTENTSCANOPYFinal
2008-10-02finaledT08BU01766City permit recordTENTSTENTFinal
2006-01-18finaledT06OT00145City permit recordSIGN10448Final
2002-01-30finaledT02BU00303City permit recordSPKLRFIRE SPKR:ADD 20Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (14)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 14 records
DateRecordWhatStatus
2024-12-02CE-VIO1224-04777Code enforcement caseRefuseClosed - resolved
2014-08-20T14DV06327Code enforcement caseRefuseComplian
2011-08-09T11DV06362Code enforcement caseRefuseComplian
2010-08-23finaledT10FR01794Code enforcement caseFireComplete
2009-12-03T09DV06692Code enforcement caseSignComplian
2009-08-04finaledT09FR02583Code enforcement caseFireComplete
2009-07-20finaledT09FR02385Code enforcement caseCode enforcement caseComplete
2008-10-28T08DV10178Code enforcement caseRefuseComplian
Show 6 older records
Code enforcement history for this parcel — remaining 6 records
DateRecordWhatStatus
2008-09-16finaledT08FR02825Code enforcement caseFireComplete
2006-11-08finaledT06FR02728Code enforcement caseCode enforcement caseComplete
2005-12-12T05ZV00735Code enforcement caseZoningComplian
2005-08-22finaledT05FR01302Code enforcement caseCode enforcement caseComplete
2004-09-24finaledT04FR00393Code enforcement caseCode enforcement caseComplete
2004-06-23T04ZV00428Code enforcement caseSignComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 115045670 — 18 permits on file from 2002 to 2022 (5 combo, 3 row, 2 fireoper, 2 firecons) and 14 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.