Electrical permit history — 1055 N Park Av
1055 N Park Av, Tucson — built 1969, with 59 permits on record. Review electrical, HVAC and remodel history with links to official records.
Multifamily property
1055 N Park Av
Built 1969 — 1960s multifamily stock · HVAC 2021 (finaled)
Permanent link: Electrical permit history for 1055 N Park Av (aztucsonelectricalsolutions.com/property/11504475b/1055-n-park-av-tucson-az-85719) · Public records last checked 2026-08-16
- Parcel
- 11504475B
- Built
- 1969 (county record)
- Jurisdiction
- Tucson
- Zoning
- UC-1
- Assessor use
- Apartments 100+ Units 3 Or More Story
- Parcel size
- 0.29 acres
- Building area
- 56,067 sq ft (assessor record)
- Sewer
- Connection on file (2017) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalCurrentLast permitted 2021 (5 years ago). City inspection record: COT - LCBU - Building Final approved 2022-12-29. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T21CM01524 — Buildout of Subway restaurant including interior non bearing walls, electric, hvac, plumbing, sprink
- Fire alarm & life safetyCurrentLast permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T22FC00360 — SUITE 102 - Tenant Improvement Change shell system SSU to grid ceiling SSP.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
A pool or spa was permitted in 2023. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
Recorded sales (2)
| Date | Price | Type |
|---|---|---|
| 2019-03-29 | $8,000,000 | Warranty Deed |
| 1998-11-20 | $601,000 | Special Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-08-07 (TR-UTL-0826-01307) — Installing 717' of new underground fiber optic to serve at 1055 N. Park Ave. Tucson, AZ 85719.
Permit history (59)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-08-07 | TR-UTL-0826-01307City permit record | Right-of-Way (ROW) - UtilityInstalling 717' of new underground fiber optic to serve at 1055 N. Park Ave. Tucson, AZ 85719 | Needs resubmittal | |
| 2026-04-06 | TR-UTL-0426-00627City permit record | Right-of-Way (ROW) - Utilityinstalling 717' of new underground fiber optic to serve at 1055 N. Park Ave Tucson, AZ 85719 Request for 30 Day Renewal as of 08/01/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts. | Renewal/extension fees due | |
| 2026-02-12finaled | TR-ROW-0226-00187City permit record | Right-of-Way (ROW)** CONTINUATION OF TR-ROW-1125-01407** Six (6) locations will each require an approximate 15' × 8' work area and will include pavement paint and four (4) flexible delineators, in accordance with the plans provided by the City of Tucson.- BEN ELIAS PM | Complete | |
| 2025-11-13finaled | TR-ROW-1125-01407City permit record | Right-of-Way (ROW)There is no excavation work, no travel lane or sidewalk closures will be needed for painting of 7 EScooter bays on park amd University | Complete | |
| 2025-05-13finaled | TR-ROW-0525-00650City permit record | Right-of-Way (ROW)We are a student apartment community who will be having move in day on Saturday, August 16th and Thursday, August 21st only and are hoping to have Park Ave closed going south bound to 1st st. Traffic control set up and take down: 6AM take down at 5PM | Complete | |
| 2024-05-16finaled | TR-ROW-0524-00591City permit record | Right-of-Way (ROW)We are a student housing apartment and we are having Move-In day on August 15th and August 18th. HUB Student Union. Traffic control set up and take down times: 08/15/2024 7am setup and 5:30pm take down 08/18/2024 7am setup and 5:30pm take down | Complete | |
| 2023-04-18finaled | TR-ROW-0423-00646City permit record | Pool / spaWe are an apartment complex located near campus, and we do not have available space to allow our residents to unload for their move-in process. Last year, we were able to use the alley between N Tyndall Ave and N Park Ave, pictured in the site plan, to allow residents a space to unload their belongings to bring to their units. We would love to have that arrangement again. Set up at 7:00am, Take down at 7:00pm Dates of event 08/15/2023, 08/17/2023, 08/18/2023 | Complete | |
| 2022-08-08finaled | T22RW02826City permit record | ROWALLOW HIGH VOLUME OF VEHICLES TO STOP IN ALLEY AND UNLOAD FOR MOVE-N PURPOSES AT THE HUB AT PARK AV ON AUGUST 16TH - 17TH. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | Final |
51 older records are not shown here. — each links to its official file.
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (8)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2020-11-06 | T20DV07293Code enforcement case | Code enforcement case | Complian |
| 2020-10-29 | T20DV07132Code enforcement case | Code enforcement case | Referred |
| 2020-09-30 | T20DV06589Code enforcement case | Code enforcement case | Complian |
| 2020-01-28 | T20DV00628Code enforcement case | Code enforcement case | Noverify |
| 2020-01-28 | T20DV00665Code enforcement case | Code enforcement case | Noverify |
| 2011-04-18 | T11DV02615Code enforcement case | Sign | Noverify |
| 2006-04-19finaled | T06FR00823Code enforcement case | Code enforcement case | Complete |
| 1998-08-24 | T98VL00609Code enforcement case | Sign | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 11504475B — 59 permits on file from 2000 to 2026 (12 row, 7 combo, 5 firecons, 5 addition / alteration) and 8 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
