Electrical permit history — 244 E Grant Rd
244 E Grant Rd, Tucson — built 2025, with 4 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
244 E Grant Rd
Build year not published — permits on file from 2025 · last permitted panel/service work 2025 (permitted, completion not confirmed)
Permanent link: Electrical permit history for 244 E Grant Rd (aztucsonelectricalsolutions.com/property/11501155x/244-e-grant-rd-tucson-az-85705) · Public records last checked 2026-08-16
- Parcel
- 11501155X
- Built
- 2025 (earliest permit on file)
- Jurisdiction
- Tucson
- Zoning
- C-2
- Assessor use
- Municipal Vacant Land
- Parcel size
- 1.15 acres
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
- Service on record
- A 2025 permit was issued; completion is not confirmed in the available record; the permit description states “Replace vandalized existing 200amp service Like for Like COT is Customer”.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionPermitted — completion not confirmedA 2025 permit specifies this work (the permit description states “Replace vandalized existing 200amp service Like for Like COT is Customer”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Inspections. TC-COM-0825-01538 — Replace vandalized existing 200amp service Like for Like COT is Customer
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 addition / alteration permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth confirming
Vacant or limited-use parcels often need the service re-established or re-sized before a tenant can occupy the space.
Most recent permit on record for this parcel: 2026-01-03 (TC-COM-0126-00002) — 1. Provide qualified electricians to install materials and perform labor per all NEC, NFPA70E and OSHA standards. 2. Provide and install (2) additional neutral wires from existing panel to existing power post location near break tent to convert existing two pole 30A circuit into two single phase 20A circuits. 3. Provide and install (1) new circuit in existing raceway from existing panel to existing power post location near break tent to add a fourth dedicated circuit to this location. Add two additional duplex receptacles and a bubble cover. one duplex receptacle per circuit. 4. Provide and install (1) additional circuit in existing raceway from existing panel to existing power post location near shower trailer. Install (1) NEX outdoor rated box with two duplex receptacles and bubble cover. 5. Provide and install (2) new quad receptacle boxes next to panel, each with a dedicated circuit and bubble cover for charging station and future use. 6. Energize and power check all new install. 7. Perform all work in a safe, neat and workman like manner..
Permit history (4)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-01-03finaled | TC-COM-0126-00002City permit record | Addition / alteration1. Provide qualified electricians to install materials and perform labor per all NEC, NFPA70E and OSHA standards. 2. Provide and install (2) additional neutral wires from existing panel to existing power post location near break tent to convert existing two pole 30A circuit into two single phase 20A circuits. 3. Provide and install (1) new circuit in existing raceway from existing panel to existing power post location near break tent to add a fourth dedicated circuit to this location. Add two additional duplex receptacles and a bubble cover. one duplex receptacle per circuit. 4. Provide and install (1) additional circuit in existing raceway from existing panel to existing power post location near shower trailer. Install (1) NEX outdoor rated box with two duplex receptacles and bubble cover. 5. Provide and install (2) new quad receptacle boxes next to panel, each with a dedicated circuit and bubble cover for charging station and future use. 6. Energize and power check all new install. 7. Perform all work in a safe, neat and workman like manner. | Complete | |
| 2025-12-12 | TD-DEV-1225-00304City permit record | Development PackageRestricted Records: STAR Village is a temporary tent style shelter on City Owned property. This is a COT project. New water service, electrical panel have been run to the site. The site has +/- 20 tow person tents, 2 Cooltainer modulars, 3 larger tents, shower trailer, and port a potties on site. | Needs resubmittal | |
| 2025-08-20applied 2025-08-19 · expired 2026-02-24 | TC-COM-0825-01556Commercial building | Trade permitInstall 3/4" PVC private plumbing from meter for Women's Shelter | Inspections | |
| 2025-08-20applied 2025-08-14 · expired 2026-04-20 | TC-COM-0825-01538Commercial building | Trade permitReplace vandalized existing 200amp service Like for Like COT is Customer8 sq ft | Inspections | $5,500 |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 11501155X — 4 permits on file from 2025 to 2026 (2 trade permit, 1 addition / alteration, 1 development package) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
