Electrical permit history — 8700 E Tanque Verde Rd

8700 E Tanque Verde Rd, Tucson — built 2000, with 33 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

8700 E Tanque Verde Rd

Built 2000 — 2000s commercial stock · 33 permits on record; no permitted panel/service or HVAC work among them

Parcel
114540540
Built
2000 (county record)
Jurisdiction
Tucson
Zoning
O-3
Assessor use
Retail Strip Center
Parcel size
1.44 acres
Building area
7,590 sq ft (assessor record)
Sewer
Connection on file (2007) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 8700 E Tanque Verde Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2021 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2021 firecons permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2021 (5 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T21FC00768 — MODIFY EXISTING FIRE SPRINKLER SYSTEM TO ACCOMODATE NEW TENANT.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2000. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Recorded sales (5)

Recorded transfers from the Pima County Assessor — 5 of 5
DatePriceType
2021-03-10$1,000,000Warranty Deed
2015-10-30$750,000Warranty Deed
2004-09-23$1,200,000Warranty Deed
2004-09-10$1,200,000Warranty Deed
1999-02-02$200,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2025-04-29 (TE-FPU-0425-00175) — PLEASE REFERENCE PERMIT TR-UTL-1124-02182 and TE-FPU-1124-00400. Permit was approved and issued but work did not begin in allotted time frame. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd..

Permit history (33)

Permit history for this parcel — 8 of 33 records
DateRecordWhatStatusValue
2025-04-29expired 2025-08-11TE-FPU-0425-00175City permit recordFloodplain UsePLEASE REFERENCE PERMIT TR-UTL-1124-02182 and TE-FPU-1124-00400. Permit was approved and issued but work did not begin in allotted time frame. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd.Issued
2025-04-29finaledTR-UTL-0425-00709City permit recordRight-of-Way (ROW) - UtilityPLEASE REFERENCE PERMIT TR-UTL-1124-02182. Permit was approved and issued but work did not begin in allotted time frame. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 6am to 2pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if neededComplete
2024-11-18expired 2025-04-08TE-FPU-1124-00400City permit recordFloodplain UsePublic sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd.Issued
2024-11-18TR-PIA-1124-00020City permit recordPrivate Improvement Agreement (PIA)Primary scope of work includes installing 3740 of new 8in sewer line along the south side of E. Tanque Verde Rd. with a full road crossing from north to south at each the maximum west end of the project and maximum east end of the project. PIA work includes the removal and eventual replanting of trees within COT ROW, and the replacing of median curb and landscape due to excavation crossing E. Tanque Verde Rd. from north to south in two locations.Submitted - online
2024-11-18finaledTR-UTL-1124-02182City permit recordRight-of-Way (ROW) - UtilityPublic sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 7am to 3pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed 05/05/2025 DENIED – DUE TO THE APPLICANT APPLYING AFTER THE EXPIRATION DATE. APPLY FOR NEW PERMIT TO CONTINUE WORK.Complete
2021-10-13finaledT21FC00768City permit recordFIRECONSMODIFY EXISTING FIRE SPRINKLER SYSTEM TO ACCOMODATE NEW TENANT.Final
2021-05-19finaledT21CM04277City permit recordCOMBOtenant improvementL of c
2016-10-19finaledT16CM07921City permit recordCOMBODETACHED CARPORT; COMMFinal
Show 25 older records
Permit history for this parcel — remaining 25 records
DateRecordWhatStatusValue
2016-09-22finaledT16OT01169City permit recordSIGN1- NON ILLUM WAL SIGNFinal
2016-08-17expires 2026-10-31DP16-0143City permit recordDevelopment PackageCANOPY AND CARPORTIssued
2001-08-08finaledT01OT00296City permit recordSIGNSIGN:2883Final
2000-10-26finaledT00CM05286City permit recordCOMBOTI:OFFICEFinal
2000-07-05T00CM03351City permit recordCOMBOTI:OFFICEWithdrwn
2000-03-14finaledT00BU00784City permit recordSPKLRFIRE SPKR:RELOCATE 14 ADD 3Final
2000-03-14finaledT00BU00785City permit recordSPKLRFIRE SPKR:RELOCATE 9Final
2000-03-13finaledT00BU00777City permit recordSPKLRFIRE SPKR:RELOCATE 11Final
2000-03-13finaledT00BU00778City permit recordSPKLRFIRE SPKR:RELOCATE 6Final
2000-02-29expired 2000-04-29T00EX00325City permit recordEXCAVEXCAV:350LF OF CURBClosed
2000-02-16finaledT00CM00740City permit recordPool / spaTI:OFFICE 463" x 50 SPACE, METAL STUDS W/ GYP BDC of o
2000-02-16finaledT00CM00741City permit recordPool / spaTI:OFFICE 267" x 232" SPACE,METAL STUDS W/ GYP BDC of o
2000-02-11finaledT00BU00457City permit recordSPKLRFIRE SPKR:ADD 10 RELOCATE 25Final
2000-02-07expired 2000-04-07T00EX00200City permit recordEXCAVEXCAV:40 LFClosed
2000-02-02finaledT00CM00462City permit recordPool / spaTI:OFFICE 34 x 42 SPACE, METAL STUDS W/ GYP BDC of o
2000-02-02finaledT00CM00463City permit recordPool / spaTI:COMMON AREA 44x 72 SPACE; LOUNGE LOBBY AND CORRIDOR, METAL STUDS W/ GYP BDC of o
2000-01-19P00AN00170City permit recordADDRNEWIssued
2000-01-19finaledT00CM00215City permit recordPool / spaTI:OFFICE 50 x 58 SPACE, METAL STUDS W/ GYP BDC of o
2000-01-13expired 2000-07-18T00BU00121City permit recordSPKLRSPKR:NEW 89Expired
1999-11-12finaledT99BU03123City permit recordSPKLRFIRE SPKR:320 4" PIPEFinal
1999-09-08finaledT99BU02424City permit recordGRADINGGRADING:350CY CUT & 1650CY FILLFinal
1999-06-22expired 2000-11-20T99CM03026City permit recordCOMBONEW OFFICE BUILDINGExpired
1999-05-12P99AN01321City permit recordADDRNEWIssued
1999-05-12T99CM02290City permit recordCOMBOOFFICE BUILDINGVoid
1998-12-28D98-0081City permit recordDevelopment PackageTANQUE VERDE OFFICE BUILDINGApproved

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (6)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 6 of 6 records
DateRecordWhatStatus
2023-05-23CE-VIO0523-03690Code enforcement caseVegetationClosed - unfounded
2020-06-18T20DV04230Code enforcement caseRefuseComplian
2008-09-18finaledT08FR02951Code enforcement caseCode enforcement caseComplete
2006-05-30finaledT06FR01548Code enforcement caseCode enforcement caseComplete
2005-05-05finaledT05FR00616Code enforcement caseCode enforcement caseComplete
2004-04-28finaledT04FR00083Code enforcement caseCode enforcement caseComplete

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 114540540 — 33 permits on file from 1998 to 2025 (7 spklr, 6 combo, 5 pool / spa, 2 floodplain use) and 6 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.