Electrical permit history — 2945 N Bear Canyon Rd
2945 N Bear Canyon Rd, Tucson — with 86 permits on record. Review electrical, HVAC and remodel history with links to official records.
Electrical Property Screening Report · Property
2945 N Bear Canyon Rd
A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.
Verify parcel data at official source ↗
Build year not published — permits on file from 2021 · 86 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 2945 N Bear Canyon Rd (aztucsonelectricalsolutions.com/property/11451206b/2945-n-bear-canyon-rd-tucson-az-85749) · Public records last checked 2026-08-22
Is it time to upgrade?
- Electrical service & panelNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service work shows in the record we read — typical for a newer home, whose service was sized to modern code at construction. Nothing here has needed a service permit since.
- Heating & coolingNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes.
- Water heaterNot in this windowNothing in the permit records we read for this parcel that names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system.
- Plumbing work on recordPermitted — completion not confirmedA 2022 permit specifies this work (the permit description states “Private Sewer to serve new Mason Ranch Apartments”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Issued. T22CM07364 — Private Sewer to serve new Mason Ranch Apartments
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
Modern service and panel. Most upgrades here are about available breaker spaces and circuit capacity rather than the service itself. The permit record does not confirm this; an on-site inspection is required.
What to check at the panel
Everything above is read off public records. These are the things only someone standing at the panel can settle, and they take about a minute.
- The number stamped on the main breaker handle — 100, 125, 150, 175 or 200. That is the service rating, and no record on this page confirms it.
- The busbar rating printed on the panel label. It is a different number from the main breaker, and it is the one that decides how much solar a panel can take under the 120% rule.
- The manufacturer and catalog number on the label inside the door.
- How many full-size spaces are left, how many positions the label permits a tandem breaker in, and the tandem limit the label states. A full panel is a different job from a full service.
- The conductor material at the main lugs, and whether the terminations look clean and tight.
- Whether there is a separate meter-main outside as well as the panel indoors — that changes where a disconnect and any new feeder would land.
- Whether the water heater, dryer and range are gas or electric. No public record carries fuel type, and it is the single biggest variable in a load calculation — it can move the calculated load on the same house by more than 40 A.
With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work.
What these jobs cost here
No floor area on record, so the cooling side cannot be priced from the record alone.
Electrical panel or service upgrade
$3,300
Most jobs like this land between $2,900 and $4,100.
The existing underground lateral is adequate for the new service and stays. That is the ordinary case, and it makes an underground job cheaper than an overhead one — the opposite of what most people expect, because there is no mast, riser or weatherhead. The bottom of this range is a clean, simple job: single storey, framed wall, the panel staying where it is, a short service run, and nothing unexpected once the cover comes off. That job is real and we do book it — but it is the best case, not the average, and the figure above it is what most houses actually come to.
Priced from built 2021 (modern 200 A era), City of Tucson permit fee and the 2023 NEC it has adopted, Tucson Electric Power as the serving utility and a finalled permit (TF-FCP-0925-00718) describing an underground service, so that is what is priced rather than assumed.
What would move this price
- Only if the panel has to move — a clothes closet, a bathroom, over a stairway, or behind a door +$3,900
If every one of those turned out to apply, this becomes about $8,000. That is the worst realistic case, not a prediction — none of them is a claim about your house.
- If your service is underground and the lateral is big enough to keep, you are already on the cheaper path. Ask the contractor to confirm the conduit size before you assume it: a 100 A original in 1¼″ conduit will not take 200 A, and that single fact swings the job by thousands.
- A service upgrade fixes capacity and the safety of the service equipment. It does not fix branch wiring. If the reason you are here is flickering lights, warm outlets or cloth-jacketed wiring, an upgrade is a down payment on a much bigger problem, and it is worth knowing that before you spend in the wrong order. (The report reserves the era-specific wiring checks for the years they actually apply to — read those above.)
- You may not need the upgrade at all. NEC 220.87 lets an existing dwelling be sized from twelve months of actual metered demand rather than a calculated load, and real houses draw far less than the calculation predicts. Ask your utility for a year of interval data and have it run that way first. Two cautions so this does not backfire: the demand tile in a TEP online account shows on-peak demand only, which is not the annual maximum the code asks for — you want the formal usage-data release — and 220.87 proves CAPACITY and nothing else. It does not create empty breaker spaces, and it does not make an obsolete panel, or one whose breakers have a documented failure history, safe. Those are separate questions with separate answers — and where the era makes a brand worth checking, the report above says so on its own.
- Whether the service is already 200 A. Nothing in the public record says so, and the number is stamped on the main breaker handle.
- Whether the panel can stay where it is. A panel in a closet, over stairs or behind a door has to move, and that alone adds $1,500 to $5,000.
- The floor area is not on the assessor record for this parcel, so there is no honest basis for a tonnage — and without a tonnage there is no price.
This is an estimate, not a quote. It is built from this property’s public record and current City of Tucson market rates — nobody has seen your panel, your duct or your roof. A real price comes from a site visit, and the things that move it most are the ones listed above that no record carries.
Change the assumptions — the panel’s location, the duct, the tonnage, whether the service is overhead or underground — and watch the number move. That is the point of it.
See the property
Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: FEMA flood zone X — minimal flood hazard, not a Special Flood Hazard Area. FIRM panel 04019C1720M, effective 2012-09-28. Open this property on FEMA’s official flood map ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 11451206B ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 11451206B
- Year constructed
- 2021 (earliest permit on file)
- Permitting authority
- Tucson
- Zoning
- R-3
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Estimated electrical service era
- approximately 200 A (estimated from the year built, 2021 — not a measurement; verify on site)
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What this means for work here
Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What that reading rests on. The issuing offices hold 86 building permits for this parcel dated between 2021 and 2026. By category the work is fire construction (45), commercial building (19), demolition (5) and right-of-way (row) - utility (4). 13 of them carry a final inspection; the other 73 were issued, expired or are still open, which is not the same as work completed. There are 3 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
City permit record (82): 2026 TR-UTL-0626-01025 · 2026 TS-PRM-0626-00209 · 2026 TR-UTL-0526-00885 · 2026 TR-UTL-0226-00281 · 2025 TF-FCP-1025-00884 · 2025 TF-FCP-0925-00822 · 2025 TF-FCP-0925-00823 · 2025 TF-FCP-0925-00824 · 2025 TF-FCP-0925-00825 · 2025 TF-FCP-0925-00826 · 2025 TF-FCP-0925-00827 · 2025 TF-FCP-0925-00828 · 2025 TF-FCP-0925-00830 · 2025 TF-FCP-0925-00831 · 2025 TF-FCP-0925-00832 · 2025 TF-FCP-0925-00833 · 2025 TF-FCP-0925-00834 · 2025 TF-FCP-0925-00835 · 2025 TF-FCP-0925-00836 · 2025 TF-FCP-0925-00837 · 2025 TF-FCP-0925-00838 · 2025 TF-FCP-0925-00840 · 2025 TF-FCP-0925-00841 · 2025 TF-FCP-0925-00842 · 2025 TF-FCP-0925-00818 · 2025 TF-FCP-0925-00819 · 2025 TC-COM-0925-01718 · 2025 TF-FCP-0925-00718 · 2025 TF-FCP-0925-00719 · 2025 TF-FCP-0925-00721 · and 52 older — search the parcel at the office below
Code enforcement cases (3): 2025 CE-VIO1025-04811 · 2025 CE-VIO1025-04636 · 2023 CE-VIO1223-06814
Development package (1): 2023 DP21-0174
Commercial building (3): 2022 T22CM07364 · 2022 T21CM05449 · 2022 T21CM05538
Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 11451206B. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All property under construction · Commercial property in 85749 · Commercial & industrial reports · Homes in 85749 · Permit data by neighborhood
Planning work at this home?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.
Complete permit record (89 entries)
Every permit and case we hold for this parcel, newest first. Each number links to the official file.
| Year | Number | Type | Status |
|---|---|---|---|
| 2026 | TR-UTL-0626-01025 | Right-of-Way (ROW) - Utility | Issued |
| 2026 | TS-PRM-0626-00209 | Sign - Permanent | Awaiting submittal |
| 2026 | TR-UTL-0526-00885 | Right-of-Way (ROW) - Utility | Issued |
| 2026 | TR-UTL-0226-00281 | Right-of-Way (ROW) - Utility | Complete |
| 2025 | CE-VIO1025-04811 | Code enforcement case | Closed - unfounded |
| 2025 | CE-VIO1025-04636 | Code enforcement case | Closed - unfounded |
| 2025 | TF-FCP-1025-00884 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00822 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00823 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00824 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00825 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00826 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00827 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00828 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00830 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00831 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00832 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00833 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00834 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00835 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00836 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00837 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00838 | Fire Construction Permit | Issued |
| 2025 | TF-FCP-0925-00840 | Fire Construction Permit | Issued |
| 2025 | TF-FCP-0925-00841 | Fire Construction Permit | Issued |
| 2025 | TF-FCP-0925-00842 | Fire Construction Permit | Issued |
| 2025 | TF-FCP-0925-00818 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00819 | Fire Construction Permit | Inspections |
| 2025 | TC-COM-0925-01718 | Commercial Building | Inspections |
| 2025 | TF-FCP-0925-00718 | Fire Construction Permit | Inspections complete |
| 2025 | TF-FCP-0925-00719 | Fire Construction Permit | Complete |
| 2025 | TF-FCP-0925-00721 | Fire Construction Permit | Complete |
| 2025 | TF-FCP-0925-00723 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00724 | Fire Construction Permit | Complete |
| 2025 | TF-FCP-0925-00726 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00728 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00730 | Fire Construction Permit | Complete |
| 2025 | TF-FCP-0925-00732 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00733 | Fire Construction Permit | Complete |
| 2025 | TF-FCP-0925-00736 | Fire Construction Permit | Complete |
| 2025 | TF-FCP-0925-00738 | Fire Construction Permit | Complete |
| 2025 | TF-FCP-0925-00740 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00742 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00745 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00746 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00748 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00749 | Fire Construction Permit | Inspections |
| 2025 | TF-FCP-0925-00751 | Fire Construction Permit | Expired |
| 2025 | TF-FCP-0925-00753 | Fire Construction Permit | Expired |
| 2025 | TF-FCP-0925-00754 | Fire Construction Permit | Expired |
| 2025 | TF-FCP-0925-00757 | Fire Construction Permit | Expired |
| 2025 | TC-FBB-0825-00104 | Factory Built Buildings | Inspections |
| 2025 | TR-ROW-0625-00788 | Right-of-Way (ROW) | Complete |
| 2025 | TR-UTL-0625-00907 | Right-of-Way (ROW) - Utility | Complete |
| 2025 | TC-DMO-0425-00075 | Demolition Permit | Inspections complete |
| 2024 | TC-DMO-1224-00276 | Demolition Permit | Withdrawn |
| 2024 | TC-DMO-1224-00275 | Demolition Permit | Withdrawn |
| 2024 | TC-DMO-1224-00273 | Demolition Permit | Withdrawn |
| 2024 | TC-COM-1224-02331 | Commercial Building | Withdrawn |
| 2024 | TC-DMO-1124-00260 | Demolition Permit | Withdrawn |
| 2024 | TF-FCP-0924-00749 | Fire Construction Permit | Issued |
| 2024 | TZ-CMP-0724-00099 | Zoning Verification Letter | Complete |
| 2023 | CE-VIO1223-06814 | Code enforcement case | Closed - unfounded |
| 2023 | DP21-0174 | Development Package | Issued |
| 2023 | TR-PIA-0323-00012 | Private Improvement Agreement (PIA) | Issued |
| 2022 | T22CM07364 | Commercial Trade Permit | Issued |
| 2022 | TC-COM-1122-00133 | Commercial Building | Inspections |
| 2022 | TC-COM-1222-00257 | Commercial Building | Inspections |
| 2022 | TC-COM-1222-00258 | Commercial Building | Inspections |
| 2022 | TC-COM-1222-00259 | Commercial Building | Inspections |
| 2022 | DP22-0172 | Development Package | Issued |
| 2022 | T21CM05449 | Commercial New Building Permit | Issued |
| 2022 | T21CM05538 | Commercial New Building Permit | Issued |
| 2021 | T21CM05523 | Commercial Building | Issued |
| 2021 | T21CM05524 | Commercial Building | Issued |
| 2021 | T21CM05525 | Commercial Building | Issued |
| 2021 | T21CM05526 | Commercial Building | Issued |
| 2021 | T21CM05527 | Commercial Building | Issued |
| 2021 | T21CM05528 | Commercial Building | Issued |
| 2021 | T21CM05529 | Commercial Building | Issued |
| 2021 | T21CM05530 | Commercial Building | Issued |
| 2021 | T21CM05531 | Commercial Building | Issued |
| 2021 | T21CM05532 | Commercial Building | Issued |
| 2021 | T21CM05533 | Commercial Building | Issued |
| 2021 | T21CM05534 | Commercial Building | Issued |
| 2021 | T21CM05535 | Commercial Building | Issued |
| 2021 | T21CM05536 | Commercial Building | Issued |
| 2021 | T21CM05537 | Commercial Building | Inspections |
| 2021 | T21CM05539 | Commercial Building | Issued |
prints this report — permits, comparisons and sources — as a clean document
How this report was built
This is a reading of public records for parcel 11451206B — 86 permits on file from 2021 to 2026 (45 fire construction, 19 commercial building, 5 demolition, 4 right-of-way (row) - utility) and 3 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-22; the permit record is refreshed on a rolling cycle (at least every 45 days), and the assessor’s building file when the county publishes a new roll. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.