Electrical permit history — 1000 E Fort Lowell Rd
1000 E Fort Lowell Rd, Tucson — built 1958, with 9 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
1000 E Fort Lowell Rd
Built 1958 — 1950s commercial stock · 9 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 1000 E Fort Lowell Rd (aztucsonelectricalsolutions.com/property/11308160c/1000-e-fort-lowell-rd-tucson-az-85719) · Public records last checked 2026-08-17
- Parcel
- 11308160C
- Built
- 1958 (county record)
- Jurisdiction
- Tucson
- Zoning
- C-1
- Assessor use
- Office Building 1 Story
- Parcel size
- 0.29 acres
- Building area
- 1,688 sq ft (assessor record)
- Sewer
- Connection on file (1952, 2018) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2010 solar pv permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2010 solar pv permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Solar was permitted here in 2010. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
- Routine
Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2009-01-20 | $248,000 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2025-07-23 (TR-UTL-0725-01193) — 2 5x5 bellholes in dirt/blktop front for crews to repair/replace gas line.
Permit history (9)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-07-23finaled | TR-UTL-0725-01193City permit record | Right-of-Way (ROW) - Utility2 5x5 bellholes in dirt/blktop front for crews to repair/replace gas line | Complete | |
| 2022-08-22finaled | T22RW03018City permit record | ROW**AFTER-THE-FACT** TEP REPLACED CROSS ARMS ON A POLE AS AN EMERGENCY, NO EXCAVATION WAS REQUIRED ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. Emergency – After the fact permit a MCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Tucson Electric Power to address since DTM did not have an opportunity to review, approve or inspect work. | Final | |
| 2020-12-31finaled | T20OT00850City permit record | C-OF-OOFFICE | C of o | |
| 2019-11-14finaled | T19RW07019City permit record | ROWINSTALLATION OF SMALL CELL EQUIPMENT MOUNTED ON EXISTING COX STRAND ON THE EAST SIDE OF 1000 E FORT LOWELL RD. SITE#PH79ASH02_D | Final | |
| 2017-06-22expired 2017-07-28 | T17RW02748City permit record | ROWReplacing one pole and anchor in alley between Fort Lowell and Blanton (185' South of Fort Lowell and 100' East of Park Ave) | Expired | |
| 2017-03-10finaled | T17CM01963City permit record | COMBOREMOVE EXISTING ROOF & REPL & ADD 2FT HEIGHT TO EXISTING CEILING | L of c | |
| 2010-04-13finaled | T10OT00801City permit record | Solar PVC OF O: OFFICE SOLAR INSTALLATION | C of o | |
| 2008-06-03finaled | T08CM01822City permit record | COMBOTI:OFFICE | C of o |
Show 1 older record
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2007-01-19expired 2007-07-25 | T07CM00234City permit record | COMBOTI: DEMO TO MAKE ACCESSIBLE RESTROM AND C OF O INSP. | Withdrwn |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (4)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2021-08-27 | T21DV05906Code enforcement case | Vegetation | Referred |
| 2014-03-05 | T14DV01283Code enforcement case | Graffiti | Complian |
| 2010-06-17finaled | T10FR01204Code enforcement case | Code enforcement case | Complete |
| 2007-04-02finaled | T07FR00613Code enforcement case | Code enforcement case | Complete |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 11308160C — 9 permits on file from 2007 to 2025 (3 row, 3 combo, 1 right-of-way (row) - utility, 1 c-of-o) and 4 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.