A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.
Verify parcel data at official source ↗
Build year not published — permits on file from 1998 · 31 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 3105 N Campbell Av (aztucsonelectricalsolutions.com/property/11307118c/3105-n-campbell-av-tucson-az-85719) · Public records last checked 2026-09-22
Is it time to upgrade?
- Electrical service & panelNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 addition / alteration permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service work shows in the record we read. Homes of this era typically started with 100 to 150 A service; whether that still fits depends on what has been added since — air conditioning, a spa, an EV charger.
- Heating & coolingNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 addition / alteration permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes.
- Water heaterNot in this windowNothing in the permit records we read for this parcel that names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system.
- Plumbing work on recordNot in this windowNothing in the permit records we read for this parcel that names this system. Unremarkable — plenty of buildings never need a permitted plumbing repair.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
AFCI protection did not enter the code until the 1999 NEC (bedroom circuits, effective 2002) and was not expanded to most living areas until 2008 — so houses from the earlier part of this range typically have none at all. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
200 A is typical and is usually adequate — worth confirming the panel has physical space before planning new loads. The permit record does not confirm this; an on-site inspection is required.
What to check at the panel
Everything above is read off public records. These are the things only someone standing at the panel can settle, and they take about a minute.
- The number stamped on the main breaker handle — 100, 125, 150, 175 or 200. That is the service rating, and no record on this page confirms it.
- The busbar rating printed on the panel label. It is a different number from the main breaker, and it is the one that decides how much solar a panel can take under the 120% rule.
- The manufacturer and catalog number on the label inside the door.
- How many full-size spaces are left, how many positions the label permits a tandem breaker in, and the tandem limit the label states. A full panel is a different job from a full service.
- The conductor material at the main lugs, and whether the terminations look clean and tight.
- Whether there is a separate meter-main outside as well as the panel indoors — that changes where a disconnect and any new feeder would land.
- Whether the water heater, dryer and range are gas or electric. No public record carries fuel type, and it is the single biggest variable in a load calculation — it can move the calculated load on the same house by more than 40 A.
With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work.
What these jobs cost here
No floor area on record, so the cooling side cannot be priced from the record alone.
Electrical panel or service upgrade
$3,300
Most jobs like this land between $2,900 and $4,100.
The existing underground lateral is adequate for the new service and stays. That is the ordinary case, and it makes an underground job cheaper than an overhead one — the opposite of what most people expect, because there is no mast, riser or weatherhead. The bottom of this range is a clean, simple job: single storey, framed wall, the panel staying where it is, a short service run, and nothing unexpected once the cover comes off. That job is real and we do book it — but it is the best case, not the average, and the figure above it is what most houses actually come to.
Priced from built 1998 (200 A, pre-2008 AFCI-code era), City of Tucson permit fee and the 2023 NEC it has adopted, Tucson Electric Power as the serving utility and a finalled permit (TF-FCP-1125-00993) describing an underground service, so that is what is priced rather than assumed.
What would move this price
- Only if the panel has to move — a clothes closet, a bathroom, over a stairway, or behind a door +$3,900
If every one of those turned out to apply, this becomes about $8,000. That is the worst realistic case, not a prediction — none of them is a claim about your house.
- If your service is underground and the lateral is big enough to keep, you are already on the cheaper path. Ask the contractor to confirm the conduit size before you assume it: a 100 A original in 1¼″ conduit will not take 200 A, and that single fact swings the job by thousands.
- A service upgrade fixes capacity and the safety of the service equipment. It does not fix branch wiring. If the reason you are here is flickering lights, warm outlets or cloth-jacketed wiring, an upgrade is a down payment on a much bigger problem, and it is worth knowing that before you spend in the wrong order. (The report reserves the era-specific wiring checks for the years they actually apply to — read those above.)
- You may not need the upgrade at all. NEC 220.87 lets an existing dwelling be sized from twelve months of actual metered demand rather than a calculated load, and real houses draw far less than the calculation predicts. Ask your utility for a year of interval data and have it run that way first. Two cautions so this does not backfire: the demand tile in a TEP online account shows on-peak demand only, which is not the annual maximum the code asks for — you want the formal usage-data release — and 220.87 proves CAPACITY and nothing else. It does not create empty breaker spaces, and it does not make an obsolete panel, or one whose breakers have a documented failure history, safe. Those are separate questions with separate answers — and where the era makes a brand worth checking, the report above says so on its own.
- Whether the service is already 200 A. Nothing in the public record says so, and the number is stamped on the main breaker handle.
- Whether the panel can stay where it is. A panel in a closet, over stairs or behind a door has to move, and that alone adds $1,500 to $5,000.
- The floor area is not on the assessor record for this parcel, so there is no honest basis for a tonnage — and without a tonnage there is no price.
This is an estimate, not a quote. It is built from this property’s public record and current City of Tucson market rates — nobody has seen your panel, your duct or your roof. A real price comes from a site visit, and the things that move it most are the ones listed above that no record carries.
Change the assumptions — the panel’s location, the duct, the tonnage, whether the service is overhead or underground — and watch the number move. That is the point of it.
See the property
Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot, so no zone is shown here. That is a gap in this page, not a statement about the property. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 11307118C ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 11307118C
- Year constructed
- 1998 (earliest permit on file)
- Permitting authority
- Tucson
- Zoning
- C-1
- Estimated electrical service era
- approximately 200 A (estimated from the year built, 1998 — not a measurement; verify on site)
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What this means for work here
Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What that reading rests on. The issuing offices hold 31 building permits for this parcel dated between 1998 and 2026. By category the work is permanent sign (5), right-of-way (row) permit - utility (5), fire automatic extinguishing system (4) and addition / alteration (3). 12 of them carry a final inspection; the other 19 were issued, expired or are still open, which is not the same as work completed. There are 2 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
Sign (4): 2026 TS-PRM-0826-00312 · 2026 TS-PRM-0626-00235 · 2026 TS-PRM-0326-00089 · 2026 TS-PRM-1225-00513
Commercial building (3): 2026 TC-COM-0526-00770 · 2026 TC-COM-0426-00585 · 2025 TC-COM-0725-01290
City permit record (16): 2026 TE-FPU-0626-00236 · 2026 TP-PRE-0626-00136 · 2026 TF-FCP-0426-00259 · 2026 TF-FOP-0426-00535 · 2026 TF-FCP-0326-00214 · 2026 TF-FCP-0326-00177 · 2026 TF-FCP-0226-00090 · 2025 TF-FCP-1125-00993 · 2025 TF-FCP-1125-00998 · 2025 TF-FCP-1025-00908 · 2025 TE-FPU-0925-00365 · 2025 TC-UTL-0825-00074 · 2025 TE-FPU-0425-00147 · 2025 TC-DMO-0125-00006 · 2025 TE-FPU-0225-00052 · 1998 T98VL00582
Certificate of occupancy (1): 2026 TC-COM-0825-01534
Code enforcement cases (2): 2026 CE-VIO0126-00127 · 2008 T08DV01935
Development package (1): 2025 TD-DEV-0425-00116
Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 11307118C. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All property under construction · Commercial property in 85719 · Commercial & industrial reports · Homes in 85719 · Permit data by neighborhood
Planning work at this home?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.
How this property compares nearby
Properties on N CAMPBELL AV hold 4,143 City permits on record, 860 of them since 2022.
Computed from the same public records as this report — counts and years, not an appraisal.
Complete permit record (33 entries)
Every permit and case we hold for this parcel, newest first. Each number links to the official file.
| Year | Number | Type | Status |
|---|---|---|---|
| 2026 | TS-PRM-0826-00312 | Permanent Sign Permit | In Review |
| 2026 | TC-COM-0526-00770 | Commercial Addition/Alteration Permit | Inspections |
| 2026 | TS-PRM-0626-00235 | Permanent Sign Permit | Issued |
| 2026 | TC-COM-0426-00585 | Commercial Addition/Alteration Permit | Inspections |
| 2026 | TE-FPU-0626-00236 | Floodplain Use Permit | Fees Due |
| 2026 | TP-PRE-0626-00136 | Pre-Application Conference | In Review |
| 2026 | TF-FCP-0426-00259 | Other IFC Construction Permit | Issued |
| 2026 | TF-FOP-0426-00535 | General Operational Fire Permit | Fees Paid |
| 2026 | TF-FCP-0326-00214 | Fire Alarm System Permit | Issued |
| 2026 | TS-PRM-0326-00089 | Permanent Sign Permit | Inspections |
| 2026 | TS-PRM-1225-00513 | Permanent Sign Permit | Inspections Complete |
| 2026 | TF-FCP-0326-00177 | Fire Automatic Extinguishing System Permit | Inspections |
| 2026 | TF-FCP-0226-00090 | Fire Automatic Extinguishing System Permit | Issued |
| 2026 | record | Right-of-Way (ROW) Permit - Utility | Complete |
| 2026 | TC-COM-0825-01534 | Commercial Addition/Alteration Permit | Complete |
| 2026 | CE-VIO0126-00127 | Sign | Closed - Unfounded |
| 2025 | TF-FCP-1125-00993 | Fire Automatic Extinguishing System Permit | Complete |
| 2025 | TF-FCP-1125-00998 | Fire Alarm System Permit | Complete |
| 2025 | record | ROW Permit - Development/Building | Inspections |
| 2025 | record | Right-of-Way (ROW) Permit - Utility | Needs Resubmittal |
| 2025 | record | Right-of-Way (ROW) Permit - Utility | Inspections |
| 2025 | TF-FCP-1025-00908 | Fire Automatic Extinguishing System Permit | Complete |
| 2025 | TE-FPU-0925-00365 | Floodplain Use Permit | Issued |
| 2025 | TC-COM-0725-01290 | Commercial New Building Permit | Revision Fees Due |
| 2025 | record | Right-of-Way (ROW) Permit - Utility | Needs Resubmittal |
| 2025 | record | Right-of-Way (ROW) Permit - Utility | Complete |
| 2025 | TC-UTL-0825-00074 | Private Utilities Permit | Expired |
| 2025 | TD-DEV-0425-00116 | Development Package | Inspections Complete |
| 2025 | TE-FPU-0425-00147 | Floodplain Use Permit with Elevation Certificate | Complete |
| 2025 | TC-DMO-0125-00006 | Commercial Demolition Permit | Complete |
| 2025 | TE-FPU-0225-00052 | Floodplain Use Permit | Complete |
| 2008 | T08DV01935 | PAINT DIST | CANCEL |
| 1998 | T98VL00582 | Permanent Sign Permit | Complete |
prints this report — permits, comparisons and sources — as a clean document
How this report was built
This is a reading of public records for parcel 11307118C — 31 City permits on file from 1998 to 2026 and 2 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The assessor’s building record, the sewer connection file and the flood map were also not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.
The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.