Electrical permit history — 2525 N Treat Av
2525 N Treat Av, Tucson — built 1998, with 14 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
2525 N Treat Av
Build year not published — permits on file from 1998 · 14 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 2525 N Treat Av (aztucsonelectricalsolutions.com/property/112071060/2525-n-treat-av-tucson-az-85716) · Public records last checked 2026-08-16
- Parcel
- 112071060
- Built
- 1998 (earliest permit on file)
- Jurisdiction
- Tucson
- Zoning
- R-2
- Assessor use
- Municipal Vacant Land
- Parcel size
- 0.44 acres
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Vacant or limited-use parcels often need the service re-established or re-sized before a tenant can occupy the space.
Most recent permit on record for this parcel: 2025-02-23 (TR-ROW-0225-00248) — On Sunday, April 6th, Living Streets Alliance will host its 22nd Cyclovia Tucson event, having participants enjoy one of Tucson's Bike Boulevards from Broadway Village to La Madera Park. It connects the neighborhoods of La Madera, Country Glenn, Blenman-Elm, Sam Hughes, and Broadmoor-Broadway which are part of Ward 3 and Ward 6. The route will have activities at La Madera Park, Himmel Park, and 2 other pocket parks in Blenman-Elm and Country Glenn. Over 45 other nonprofit organizations and NGOs, local businesses, and community partners will bring the 3 mile route to life, providing a free, fun, car-free day for an anticipated 50,000 people from across the region to enjoy..
Permit history (14)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-02-23finaled | TR-ROW-0225-00248City permit record | Right-of-Way (ROW)On Sunday, April 6th, Living Streets Alliance will host its 22nd Cyclovia Tucson event, having participants enjoy one of Tucson's Bike Boulevards from Broadway Village to La Madera Park. It connects the neighborhoods of La Madera, Country Glenn, Blenman-Elm, Sam Hughes, and Broadmoor-Broadway which are part of Ward 3 and Ward 6. The route will have activities at La Madera Park, Himmel Park, and 2 other pocket parks in Blenman-Elm and Country Glenn. Over 45 other nonprofit organizations and NGOs, local businesses, and community partners will bring the 3 mile route to life, providing a free, fun, car-free day for an anticipated 50,000 people from across the region to enjoy. | Complete | |
| 2022-03-10 | T22RW00897City permit record | ROWWater well discharge, 24 hour signs for discharge route along section of E Alturas St, west of N Treat Av. Complete closure required LTF # 75018 ID# AZDM75018 | Withdrwn | |
| 2021-12-15 | T21OT00927City permit record | Floodplain UseWater well discharge, 24 hour for discharge: LTF # 75018ID# AZDM75018 | Submitted | |
| 2021-12-01finaled | T21RW05111City permit record | ROWWATER WELL DISCHARGE, 24 HOUR SIGNS FOR DISCHARGE ROUTE ALONG SECTION OF E ALTURAS ST, WEST OF N TREAT AV. COMPLETE ROAD CLOSURE REQUIRED. LTF # 75018 ID# AZDM75018 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813. | Final | |
| 2020-12-10completed 2020-12-10 | T20SE00014Special exception | Zoning Examiner Special ExceptionSE-20-14 COT Water2525 N Treat - Expansion of an existing City of Tucson wellsite. - Expand City of Tucson Water wellsiteSE-20-14 COT Water2525 N Treat | Approved | |
| 2020-07-13finaled | T20RW04022City permit record | ROWEquip Well B-044C JOC 181807-04: Isolate the segment of water line, on Alturas St for the new water connection for the well site and to abandon the old water connection to the well site per JOC 181807-04. See attached sheet 2. PROJECT MANAGER - Dorothy Dolan 520.308-9651 NOTES: ***CONTRACTOR MUST NOTIFY RESIDENTS 48 HOURS IN ADVANCE*** | Final | |
| 2020-07-01expired 2026-02-15 | DP20-0136City permit record | Development PackageSITE/Special Exception - Equip Well B-044C. 2525 N. Treat Avenue. | Issued | |
| 2020-06-24finaled | T20CM03954City permit record | Commercial BuildingEQUIP NEW WELL WITH 1,000 GPM PUMP/MOTOR | Complete |
Show 6 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2020-04-28finaled | T20RW02402City permit record | ROWSTORMWATER HARVESTING BASINS AND TREE PLANTING | Final | |
| 2020-04-17finaled | T20RW02255City permit record | ROWTEP crew will be changing out an old pole, trenching 10' from new pole and installing new underground pedestal. | Final | |
| 2019-10-22finaled | T19RW06387City permit record | ROWTransfer 1 cable attachment, 3 aerial drops and 1 pole mount terminal; Remove 1 ready access terminal, 1 down guy and 1 anchor; Install 1 cable tag, 1 ready access terminal, 1 down guy, 1 anchor, 1 guy guard, aerial suspension strand; Pull old pole. | Final | |
| 2019-09-09finaled | T19RW05020City permit record | ROWAIR-VACUUM EXCAVATION OF 7 UTILITY POTHOLES 12" X 12" IN SIDE ALONG ALTURAS AVE FOR THE DESIGN PHASE OF TUCSON WATER EQUIPMENT WELL B-44C PROJECT | Final | |
| 2019-04-03finaled | T19RW01800City permit record | ROWWATER WELL DISCHARGE - 24 HOUR SIGNAGE FOR DISCHARGE ROUTE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY LFT#: 75018 ID#: AZDM75018 06/17/2019-PLAN CHANGE WATER WELL DISCHARGE=24 HR SIGNAGE FOR DISCHARGE ROUTE | Final | |
| 1998-12-11finaled | T98ME01002City permit record | MECHPRESSURE VESSEL CERTIFICATE:TUC-24633 | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (2)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2016-07-08 | T16DV04163Code enforcement case | Code enforcement case | Complian |
| 2011-12-07 | T11DV09819Code enforcement case | Refuse | Referred |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, once. No list, no follow-up unless you ask for it.
How this report was built
This is a reading of public records for parcel 112071060 — 14 permits on file from 1998 to 2025 (8 row, 1 right-of-way (row), 1 floodplain use, 1 zoning examiner special exception) and 2 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
