Electrical permit history — 2333 E Glenn St

2333 E Glenn St, Tucson — built 1963, with 55 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Multifamily property

2333 E Glenn St

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1963 — 1960s multifamily stock · last permitted panel/service work 2018 (permit expired without a confirmed final)

Is it time to upgrade?

  • Electrical service & distributionPermitted — completion not confirmedA 2018 permit specifies this work (the permit description states “ELECTRICAL SERVICE AND PANEL UPGRADE”), but the available record does not show a final inspection. The permit expired without a confirmed final status. Official status: Expired. T18CM09539 — ELECTRICAL SERVICE AND PANEL UPGRADE
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    There is an electrical reconnect permit from 2009. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

Solar and energy potential

Roof footprint
≈ 23,574 sq ft (county building-footprint layer)
Usable for solar, planning estimate
≈ 16,500 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 180 kW — roughly 450 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 300,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$24,000–$39,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 2.3 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
112052790
Year constructed
1963 (county record)
Permitting authority
Tucson
Zoning
R-3
Property type
Apartments 25 - 99 Units 2 Story
Sewer
Connection on file (1963) (county sewer connection records)
Flood zone
AE — Special Flood Hazard Area (FEMA)
Service on record
A 2018 permit expired without a confirmed final status; the permit description states “ELECTRICAL SERVICE AND PANEL UPGRADE” — an increase in capacity as described, not a confirmed installed rating.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 55 building permits for this parcel dated between 1997 and 2026. By category the work is plumb (18), commercial building (13) and elect (6). 33 of them carry a final inspection; the other 22 were issued, expired or are still open, which is not the same as work completed. There are 24 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 112052790. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85719 · Commercial & industrial reports · Homes in 85719 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

Complete permit record (79 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TC-COM-0426-00505Commercial BuildingInspections
2026TC-COM-0426-00509Commercial BuildingInspections
2026TC-COM-0426-00511Commercial BuildingInspections
2026TC-COM-0426-00513Commercial BuildingInspections
2026TC-COM-0426-00531Commercial BuildingInspections
2026TC-COM-0426-00532Commercial BuildingInspections
2026TC-COM-0426-00533Commercial BuildingInspections
2026TC-COM-0126-00046Commercial BuildingInspections
2026TC-COM-0126-00047Commercial BuildingInspections
2026TC-COM-0126-00048Commercial BuildingInspections
2026TC-COM-0126-00014Commercial BuildingInspections
2025CE-VIO0725-02952Code enforcement caseClosed - unfounded
2024CE-VIO0924-03767Code enforcement caseClosed - unfounded
2024CE-VIO0824-03447Code enforcement caseClosed - unfounded
2023TC-RES-0723-06769Residential Building - One or Two FamilyVoid
2023TC-COM-0723-01693Commercial BuildingIssued
2023TR-UTL-0523-01556Right-of-Way (ROW) - UtilityComplete
2022T22CM06001COMBOFinal
2022T22DV01734RefuseNoverify
2021T21DV06128ElectricalComplian
2021T21DV03753Code enforcement caseNoverify
2020T20DV08101Code enforcement caseComplian
2020T20DV07870RefuseNoverify
2020T20DV07298Code enforcement caseNoverify
2020T20DV05633RefuseReferred
2020T20DV04576RefuseComplian
2019T19CM04089Commercial BuildingIssued
2019T19RW02898ROWFinal
2019T19CM00580COMBOFinal
2019T19CM00146COMBOFinal
2018T18CM09539COMBOExpired
2018T18CM07191COMBOFinal
2018T18OT00336Floodplain UseApproved
2018T18CM02285COMBOFinal
2018T18RW01373ROWExpired
2017T17DV03021Code enforcement caseComplian
2017T17CM04076COMBOFinal
2017T17DV02120ElectricalComplian
2017T17DV00122RefuseComplian
2016T16DV00025RefuseComplian
2015T15DV06150RefuseComplian
2015T15OT00811FLOODPLNFinal
2015T15CM04018COMBOFinal
2015T15DV04019Work without permitComplian
2015T15CM03119COMBOFinal
2012T12DV06153RefuseNoverify
2011T11PL01551PLUMBFinal
2009T09PL02108PLUMBFinal
2009T09CM00501COMBOExpired
2009T09DV01067FireComplian
2009T09EL00429ELECTFinal
2009T09EL00430ELECTFinal
2009T09EL00431ELECTFinal
2009T09EL00432ELECTFinal
2009T09EL00433ELECTFinal
2009T09EL00434ELECTFinal
2007T07PL00315PLUMBFinal
2003T03VL00447FireComplian
2003T03CM01792COMBOExpired
2003T03DV00299Code enforcement caseComplian
2002T02PL01627PLUMBFinal
2002T02PL01546PLUMBFinal
2002T02PL01420PLUMBFinal
2002T02PL01215PLUMBExpired
2002T02PL01216PLUMBFinal
2002T02VL00720Code enforcement caseComplian
2002T02VL00695Work without permitComplian
2002T02PL00354PLUMBFinal
2002T02VL00241Work without permitInvalid
2002T02AN00092ADDRNEWIssued
2002T02PL00143PLUMBFinal
2002T02PL00144PLUMBExpired
2002T02PL00075PLUMBFinal
2002T02PL00057PLUMBFinal
2001T01PL02610PLUMBFinal
1997T97PL00126PLUMBFinal
1997T97PL00127PLUMBFinal
1997T97PL00128PLUMBFinal
1997T97PL00129PLUMBFinal

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 112052790 — 55 permits on file from 1997 to 2026 (18 plumb, 13 commercial building, 10 combo, 6 elect) and 24 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-22; the permit record is refreshed on a rolling cycle (at least every 45 days), and the assessor’s building file when the county publishes a new roll. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.