Electrical permit history — 3838 N Campbell Av

3838 N Campbell Av, Tucson — built 2005, with 22 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

3838 N Campbell Av

Build year not published — permits on file from 2005 · 22 permits on record; no permitted panel/service or HVAC work among them

Parcel
11202034L
Built
2005 (earliest permit on file)
Jurisdiction
Tucson
Zoning
PAD-11
Assessor use
Hospital
Parcel size
13.61 acres
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 3838 N Campbell Av, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2025 (1 year ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0325-00203 — Add 1 Relocate 17 sprinkler heads
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

Most recent permit on record for this parcel: 2026-06-22 (TC-COM-0626-00943) — ADDING STEAM STERILIZER IN EXIST CLEAN EQUIP ROOM (STERILE PROCESSING DEPT, BANNER UNIVERSITY TUCSON NORTH OUTPATIENT CLINIC). NEW FLOOR SINK, UPDATED THERMOSTATS AND RETURN LINE OF REVERSE OSMOSIS LOOP FOR EXIST STERILIZERS. HVAC IN ROOM REBALANCED DUE TO ADDED HEAT GAIN. ILIMITED DEMOLITION, ARCHITECUTRAL, MECHANICAL, ELECTRICAL, AND PLUMBING WORK, MINOR CUTTING/PATCHING. NO CHANGE TO STRUCTURE OF BUILDING. NO CHANGE TO LIFE SAFETY OR EGRESS. NO CHANGE TO OCCUPANCY TYPE OR COUNTS..

Permit history (22)

Permit history for this parcel — 8 of 22 records
DateRecordWhatStatusValue
2026-06-22TC-COM-0626-00943City permit recordDemolitionADDING STEAM STERILIZER IN EXIST CLEAN EQUIP ROOM (STERILE PROCESSING DEPT, BANNER UNIVERSITY TUCSON NORTH OUTPATIENT CLINIC). NEW FLOOR SINK, UPDATED THERMOSTATS AND RETURN LINE OF REVERSE OSMOSIS LOOP FOR EXIST STERILIZERS. HVAC IN ROOM REBALANCED DUE TO ADDED HEAT GAIN. ILIMITED DEMOLITION, ARCHITECUTRAL, MECHANICAL, ELECTRICAL, AND PLUMBING WORK, MINOR CUTTING/PATCHING. NO CHANGE TO STRUCTURE OF BUILDING. NO CHANGE TO LIFE SAFETY OR EGRESS. NO CHANGE TO OCCUPANCY TYPE OR COUNTS.Fees due
2026-04-20TC-UTL-0426-00042City permit recordUtilitiesNEW PAVED SURFACE PARKING LOTIn review
2026-04-13TC-COM-0426-00539City permit recordCommercial BuildingNEW PAVED SURFACE PARKING LOT/PARKING SHADE CANOPY/SHUTTLE STOP SHADE STRUCTURE AND FOUNDATIONSNeeds resubmittal
2026-04-13TD-DEV-0426-00092City permit recordDevelopment PackageNEW PAVED SURFACE PARKING LOTIn review
2026-01-07TR-UTL-0126-00054City permit recordRight-of-Way (ROW) - UtilityInstall underground fiber optic conduit within City of Tucson right-of-way along North Campbell Avenue, including 75' of trenching and surface restoration per City of Tucson standards. Aerial fiber installation totaling approximately 1,801' LF is shown on the plans for reference only and is excluded from the permit and will be addressed separately.Void
2025-10-13expires 2026-11-18TC-COM-1025-01881City permit recordCommercial BuildingREMOVE EXISTING EXHAUST FAN AND ONE BIOSAFETY CABINETS. INSTALLING TWO NEW EXHAUST FANS AND TWO NEW BIOSAFTEY CABINETSIn revision
2025-09-04finaledTC-COM-0925-01627City permit recordCommercial BuildingElectrical work in Brain LabInspections complete
2025-03-21finaledTR-ROW-0325-00382City permit recordRight-of-Way (ROW)Relocating pedestrian crosswalk, modifying two ADA ramps, adding two pedestrian actuated flashing beacons, adding fencing to direct pedestrians to new crosswalk. Permit update 5/2/2025: Approved time extension to 5:00 AM - 5:00 PM & Renewed for 90 days.Complete
Show 14 older records
Permit history for this parcel — remaining 14 records
DateRecordWhatStatusValue
2025-03-10finaledTF-FCP-0325-00203City permit recordFire ConstructionAdd 1 Relocate 17 sprinkler headsComplete
2025-03-04TF-FCP-0325-00175City permit recordFire ConstructionVOID - Submit under Permit#TF-FCP-1024-00904 - Add 1 Relocate 17 sprinkler headsVoid
2025-01-29expired 2026-03-23TC-COM-0125-00189City permit recordDemolitionTHIS PROJECT IS PHASE 2 & 3 (OF 3) FOR THE RENOVATION OF THE EXISTING SECOND LEVEL NORTH INFUSION AREA. THE PHASE 2 & 3 RENOVATION CONSISTS OF 2,710 SF INCLUDING: FINISH UPDATES TO (3) EXISTING EXAM ROOMS AND (1) EXISTING SOILED HOLD ROOM AS WELL AS SELECTIVE DEMOLITION OF INTERIOR PARTITIONS, CEILINGS AND MILLWORK TO CREATE (1) NEW EQUIPMENT ALCOVE, (1) NEW STAFF WORK ROOM, (1) NEW WORKSTATION, AND (7) NEW INFUSION BAYS. THERE WILL BE MECHANICAL, ELECTRICAL AND PLUMBING WORK ASSOCIATED WITH THIS SCOPE. THERE WILL BE NO CHANGE TO THE EXISTING OCCUPANCY OR BUILDING TYPE.Issued
2024-10-25finaledTF-FCP-1024-00904City permit recordFire ConstructionRelocate 5 Sprinkler HeadsComplete
2024-06-27finaledTC-COM-0624-01261City permit recordAddition / alterationReceptacle additions for BUMCT North Building 2 located at 3838 N. Campbell Ave.Complete
2024-05-15expired 2025-06-09TC-COM-0524-00932City permit recordCommercial BuildingPhase 1 (of 3) renovation of existing 2nd level north infusion area. 2,265 SF including: finish updates to (6) existing exam rooms, (1) new procedure room, (1) new equipment/med room, a nurse station, intake area, equipment alcove and nourishment area. No change to existing occupancy or building type.Inspections
2022-07-27applied 2022-06-10 · expired 2026-03-06DP22-0155Development packageDevelopment PackageRestricted record - Site/Grading - Banner Health North Campus, Pedestrian Safety Initiative. Remove existing crosswalk aIssued
2022-04-28applied 2022-04-27 · expired 2022-11-15T22CM03149Commercial buildingAddition / alterationStark Electric is installing the electrical and TEP said they will need a completed inspection of thIssued
2022-04-27applied 2022-03-30 · expired 2023-04-16T22CM02289Commercial buildingAddition / alterationApprox. 1,119 SF of interior renovations to expand the Audiology department and relocate schedulers202573 sq ftIssued$250,000
2019-12-06applied 2019-03-18 · expired 2020-06-16T19OT00252SignPermanent SignMASTER SIGN PROGRAM - NEW FREESTANDING SIGNS & REVISION OF WALL SIGNS PERMITTED & INSTALLED UNDER T1Issued
2018-10-02applied 2018-09-13 · expired 2019-03-24T18OT00989SignPermanent SignPermanent Wall signage for UMC Banner Cancer Center in PAD zoneIssued
2018-06-08T18OT00619SignPermanent SignPERMIT SUBMITTAL FOR MASTER SIGN PROGRAM (FREESTANDING SIGNAGE) - UPDATED - BUILDING SIGNAGE UNDER TSubmitted
2006-09-12applied 2006-02-02D06-0007Development packageDevelopment PackageRONALD MCDONALD HOUSEApproved
2005-12-16applied 2005-09-12 · expired 2006-05-31D05-0035Development packageDevelopment PackageUMC CANCER CENTERApproved

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 11202034L — 22 permits on file from 2005 to 2026 (4 commercial building, 4 development package, 3 fire construction, 3 addition / alteration) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.