Electrical permit history — 3125 N Alvernon Wy

3125 N Alvernon Wy, Tucson — built 1982, with 32 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Multifamily property

3125 N Alvernon Wy

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1982 — 1980s multifamily stock · last permitted panel/service work 2024 (permitted, completion not confirmed) · HVAC 2026 (permitted, completion not confirmed) · 1 open code case

Is it time to upgrade?

  • Electrical service & distributionPermitted — completion not confirmedA 2024 permit specifies this work (the permit description states “Replacement of 800-amp 10-meter pack”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Issued. TC-COM-0424-00683 — Replacement of 800-amp 10-meter pack
  • Heating, cooling & mechanicalPermitted — completion not confirmedA 2026 permit specifies this work (the permit description states “SOSACE needs to update and pass inspection on a previous installation of a simple mini split heat pump install, on a studio apartment. We did a heat load calculation, and a 12,000 BTUH will work well. Half of the work is already done because the Power and the condensate lines are already there. The previous heat pump had a dedicated 240V 20-amp circuit installed and inspected when the building complex was built.”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Inspections. The assessor records cooling as WARMED AND COOLED AIR and heating as Forced Air (assessor characteristics can lag permitted work). TC-COM-1125-02134 — SOSACE needs to update and pass inspection on a previous installation of a simple mini split heat pump install, on a studio apartment. We did a heat load calculation, and a 12,000 BTUH will work well. Half of the work is already done because the Power and the condensate lines are already there. The previous heat pump had a dedicated 240V 20-amp circuit installed and inspected when the building complex was built.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. The assessor records the roof as Composition Shingle. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth looking at

    There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Worth confirming

    There is an electrical reconnect permit from 1999. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

  • Routine

    A trade permit was pulled in 2025. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 26,450 sq ft (county building-footprint layer, 6 structures)
Usable for solar, planning estimate
≈ 18,500 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 200 kW — roughly 500 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 330,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$26,000–$43,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 2.2 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
11105016B
Year constructed
1982 (assessor record)
Permitting authority
Tucson
Zoning
R-3
Property type
Apartments 25 - 99 Units 2 Story
Building area
36,224 sq ft
Cooling
WARMED AND COOLED AIR
Heating
Forced Air
Service on record
A 2024 permit was issued; completion is not confirmed in the available record; the permit description states “Replacement of 800-amp 10-meter pack”.

The building area, cooling and heating above come from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 32 building permits for this parcel dated between 1999 and 2026. By category the work is trade permit (13), addition / alteration (6), elevation certificate (4) and floodplain use (2). 16 of them carry a final inspection; the other 16 were issued, expired or are still open, which is not the same as work completed. There are 31 code-enforcement cases recorded against the parcel, 1 of which is open. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 11105016B. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All multifamily property · Commercial property in 85712 · Commercial & industrial reports · Homes in 85712 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on N ALVERNON WY hold 1,159 City permits on record, 338 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (63 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026CE-VIO0726-02968Code enforcement caseClosed - Resolved
2026TC-COM-1125-02134Commercial Trade PermitInspections
2026TC-COM-0426-00498Commercial Addition/Alteration PermitIssued
2026TC-COM-0426-00500Commercial Addition/Alteration PermitIssued
2026TC-COM-0426-00499Commercial Addition/Alteration PermitIssued
2026TC-FBB-0226-00014Permanent ModularIssued
2026TC-COM-0226-00215Commercial Fence/Wall PermitIssued
2026TD-DEV-0326-00068Development PackageIssued
2026TE-FPU-0326-00078Floodplain Use PermitIssued
2026CE-VIO0226-00872Code enforcement caseClosed - Resolved
2026recordROW Permit - Residential Temporary UseNeeds Resubmittal
2025TC-COM-0525-00935Commercial Addition/Alteration PermitRevision Fees Due
2025TC-DMO-0525-00092Swimming Pool Demolition PermitComplete
2025TC-COM-0525-00923Commercial Addition/Alteration PermitNeeds Resubmittal
2025TC-COM-0425-00722Commercial Trade PermitComplete
2025TZ-PMT-0425-00034Temporary Use PermitExpired
2025CE-VIO0325-01163Work without permitCitation
2024CE-VIO0624-02422Code enforcement caseClosed - Resolved
2024CE-VIO0524-02083Code enforcement caseClosed - Resolved
2024TC-COM-0424-00683Commercial Trade PermitIssued
2023CE-VIO0923-05417Code enforcement caseClosed - Unfounded
2022T22DV03546RES: MINIMUM HOUSINGCOMPLIAN
2022T22DV02086RES: MINIMUM HOUSINGCOMPLIAN
2021T21DV06783PAINT DISTNOVERIFY
2021T21DV02263RES: MINIMUM HOUSINGNOVERIFY
2021T21DV02062RES: MINIMUM HOUSINGNOVERIFY
2020T20CM06776Commercial Trade PermitExpired
2020T20CM06777Commercial Trade PermitExpired
2019T19DV05188RES: MINIMUM HOUSINGNOVERIFY
2019T19CM00126Commercial Trade PermitCanceled
2017T17DV02365RES: MINIMUM HOUSINGCOMPLIAN
2015T15DV08786COMMERCIAL ZONINGCOMPLIAN
2015T15DV05580SIGN VIOLATIONCOMPLIAN
2015T15CM02993Commercial Trade PermitComplete
2015T12OT00609Elevation CertificateComplete
2015T12OT00605Floodplain Use PermitComplete
2015T12OT00606Elevation CertificateComplete
2015T12OT00607Elevation CertificateComplete
2015T12OT00608Elevation CertificateComplete
2015T15CM00851Commercial Trade PermitComplete
2014T14DV09065RES: MINIMUM HOUSINGNOVERIFY
2014T14DV08569RES: MINIMUM HOUSINGCOMPLIAN
2014T14DV08322RES: MINIMUM HOUSINGCANCEL
2014T14DV08311RES: MINIMUM HOUSINGCOMPLIAN
2014T14DV01538GRAFFITINOVERIFY
2014T14CM01443Commercial Trade PermitComplete
2013T13DV09474RESIDENTIAL ZONINGNOVERIFY
2013T13CM06940Commercial Trade PermitComplete
2013T13DV06375RES: MINIMUM HOUSINGCOMPLIAN
2013T13DV01847RES: MINIMUM HOUSINGNOVERIFY
2013T13DV00717RES: MINIMUM HOUSINGCANCEL
2012T12DV09932RES: MINIMUM HOUSINGNOVERIFY
2012T12CM06423Residential Trade PermitComplete
2012T12DV07757RES: MINIMUM HOUSINGCOMPLIAN
2011T11DV01087RES: MINIMUM HOUSINGNOVERIFY
2011T11DV00413RES: MINIMUM HOUSINGNOVERIFY
2010T10DV04986RES: MINIMUM HOUSINGCOMPLIAN
2010T10CM01009Commercial Trade PermitComplete
2010T10DV00974RESIDENTIAL FIRECOMPLIAN
2008T08OT01140Permanent Sign PermitComplete
2008T08DV01151LIGHTING VIOLATIONCOMPLIAN
2001T01OT00070Commercial Addition/Alteration PermitComplete
1999T99EL02146Commercial Trade PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 11105016B — 32 City permits on file from 1999 to 2026 and 31 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area, cooling, heating, roof, walls on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.