Electrical permit history — 6255 E Grant Rd
6255 E Grant Rd, Tucson — built 1986, with 58 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
6255 E Grant Rd
Built 1986 — 1980s commercial stock · HVAC 2021 (finaled) · 1 open code case
Permanent link: Electrical permit history for 6255 E Grant Rd (aztucsonelectricalsolutions.com/property/11016221b/6255-e-grant-rd-tucson-az-85712) · Public records last checked 2026-08-16
- Parcel
- 11016221B
- Built
- 1986 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- C-2
- Assessor use
- Warehhouse Type Store
- Parcel size
- 15.31 acres
- Building area
- 160,678 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalCurrentLast permitted 2021 (5 years ago). City inspection record: MECHANICAL - FINAL approved 2021-07-09. Contractor of record: Pro-Tec Refrigeration LLC. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T21CM00180 — Remove existing swamp coolers and install new HVAC in tire center
- Fire alarm & life safetyCurrentA newer 2026 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “Installation of a new fire alarm system with cellular communication, including new notification and initiating devices.”. Last permitted 2019 (7 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T19FC00939 — MODIFY WET PIPE SPRINKLER SYSTEM
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Worth looking at
There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2026-08-06 (TR-UTL-0826-01305) — PRJ320174-1: Cox to pull 130' of fiber thru existing CATV conduit, onto private property for system tie..
Permit history (58)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-08-06 | TR-UTL-0826-01305City permit record | Right-of-Way (ROW) - UtilityPRJ320174-1: Cox to pull 130' of fiber thru existing CATV conduit, onto private property for system tie. | Fees paid | |
| 2026-06-03finaled | TF-FOP-0626-00792City permit record | Fire OperationalRenewal of Fire Operational Permit # TF-FOP-0625-00889 | Complete | |
| 2026-05-27expires 2026-12-23 | TF-FCP-0526-00354City permit record | Fire ConstructionInstallation of a new fire alarm system with cellular communication, including new notification and initiating devices. | Issued | |
| 2026-05-08finaled | TF-FOP-0526-00655City permit record | Fire OperationalCOSTCO #0407 - CFW retail sales | Complete | |
| 2026-04-20expires 2026-12-01 | TC-UTL-0426-00041City permit record | Addition / alterationCostco Wholesale is requesting approval of a Development Package to relocate its fuel facility from the current City Parcel to the adjacent County Parcel. This relocation will allow the former fuel site to be converted into additional parking to better serve Costco members. The project scope on the City Parcel includes 104 new parking stalls, along with landscaping, lighting, and pavement striping designed to enhance functionality, aesthetics, and safety for members. By providing longer fueling queues, additional fueling positions, and improved circulation and access, the project will streamline operations around the Costco Warehouse and improve the overall member experience. The adjacent parcel proposed for the relocated fuel facility is under Pima County jurisdiction and will be developed in accordance with applicable County standards. However, because the City of Phoenix has jurisdiction over the surrounding streets and driveway access serving the parcel, a Traffic Impact Analysis (TIA) has been prepared and included with this submittal. The County parcel is also shown on the accompanying site plan to allow the City to review and comment on access and any potential off-site improvements. | Issued | |
| 2026-03-20 | TD-DEV-0326-00074City permit record | Addition / alterationCostco Wholesale is requesting approval of a Development Package to relocate its fuel facility from the current City Parcel to the adjacent County Parcel. This relocation will allow the former fuel site to be converted into additional parking to better serve Costco members. The project scope on the City Parcel includes 104 new parking stalls, along with landscaping, lighting, and pavement striping designed to enhance functionality, aesthetics, and safety for members. By providing longer fueling queues, additional fueling positions, and improved circulation and access, the project will streamline operations around the Costco Warehouse and improve the overall member experience. The adjacent parcel proposed for the relocated fuel facility is under Pima County jurisdiction and will be developed in accordance with applicable County standards. However, because the City of Phoenix has jurisdiction over the surrounding streets and driveway access serving the parcel, a Traffic Impact Analysis (TIA) has been prepared and included with this submittal. The County parcel is also shown on the accompanying site plan to allow the City to review and comment on access and any potential off-site improvements. | Fees paid | |
| 2025-11-24finaled | TF-FOP-1125-01531City permit record | Fire OperationalCOSTCO #407 - CFW retail sales | Complete | |
| 2025-06-23finaled | TF-FOP-0625-00889City permit record | Fire OperationalRenewal of Fire Operational Permit #TF-FOP-0624-00699 | Complete |
50 older records are not shown here. — each links to its official file.
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (1)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2024-06-26 | CE-VIO0624-02454Code enforcement case | Code enforcement case | Active |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, once. No list, no follow-up unless you ask for it.
How this report was built
This is a reading of public records for parcel 11016221B — 58 permits on file from 1998 to 2026 (10 fire operational, 7 development package, 7 firecons, 6 addition / alteration) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).