Electrical permit history — 2695 N Craycroft Rd

2695 N Craycroft Rd, Tucson — built 1985, with 27 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

2695 N Craycroft Rd

Built 1985 — 1980s commercial stock · HVAC 2022 (finaled)

Parcel
11012091A
Built
1985 (assessor record)
Jurisdiction
Tucson
Zoning
PAD-16
Assessor use
Hospital
Parcel size
7.65 acres
Building area
83,663 sq ft (assessor record)
Sewer
No connection on file (sewer or septic status not confirmed by the record — verify on site)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 2695 N Craycroft Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalCurrentLast permitted 2022 (4 years ago). City inspection record: MECHANICAL - FINAL approved 2022-09-12. Contractor of record: Sun Mechanical. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T22CM02535 — BOILER REPLACEMENT
  • Fire alarm & life safetyCurrentLast permitted 2017 (9 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T17FC00981 — MODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

Recorded sales (1)

Recorded transfers from the Pima County Assessor — 1 of 1
DatePriceType
2024-12-19$19,065,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2026-07-24 (TF-FOP-0726-01000) — Treatment Facility (86 beds).

Permit history (27)

Permit history for this parcel — 8 of 27 records
DateRecordWhatStatusValue
2026-07-24TF-FOP-0726-01000City permit recordFire OperationalTreatment Facility (86 beds)Fees paid
2026-07-23TF-FOP-0726-00995City permit recordFire OperationalGeneral Fire Operational Permit - LP - GasFees paid
2026-04-06expires 2026-08-18TR-UTL-0426-00625City permit recordPool / spaOverlash east 160' 48ct fiber over 1 span and 2 poles. Attach 750' 48 ct fiber over 4 spans and 5 poles. Riser down and install new vault. Bore 130' to building. 05/19/26- Renew permit for 90 days as of 05/20/26. New expiration date is 08/18/2026Inspections
2026-01-16finaledTR-ROW-0126-00045City permit recordRight-of-Way (ROW)NEW 4 INCH SEWER LINE FOR TMC CAMPUS AT 5462 EAST GLENN ST, TOTAL INSTALLATION 145FT.*** 3/12/26- 90 DAYS RENEWAL AS OF 3/13/26. NEW EXPIRATION OF 6/13/26Complete
2025-10-06finaledTR-ROW-1025-01251City permit recordRight-of-Way (ROW)ADA RAMP, SIDEWALK AND DRIVE-WAY IMPROVEMENTS FOR TMC CAMPUS AT 5462 EAST GLENN ST, EXCAVATION 225FT 24HRS*** Continuation Permit Number: TR-ROW-0625-00810***Complete
2025-07-25finaledTF-FOP-0725-01003City permit recordFire OperationalLP gasComplete
2025-07-08TF-FOP-0725-00940City permit recordFire OperationalVOID - Submit a Fire General Operational - LP GasVoid
2025-06-16finaledTR-ROW-0625-00809City permit recordRight-of-Way (ROW)NEW 4 INCH SEWER LINE FOR TMC CAMPUS AT 5462 EAST GLENN ST, TOTAL INSTALLATION 145FT.*** 7/10/25- RENEWAL REQUEST FOR 90 DAYS AS OF 7/20Complete
Show 19 older records
Permit history for this parcel — remaining 19 records
DateRecordWhatStatusValue
2025-06-16finaledTR-ROW-0625-00810City permit recordRight-of-Way (ROW)ADA RAMP, SIDEWALK AND DRIVE-WAY IMPROVEMENTS FOR TMC CAMPUS AT 5462 EAST GLENN ST, EXCAVATION 225FT 24HRS*** (07/31/2025)-Renew 60days as of 08/10/2025 new expiration date 10/09/2025Complete
2025-05-12finaledTF-FOP-0525-00687City permit recordFire OperationalPalo Verde Behavioral HealthComplete
2024-01-24finaledTF-FOP-0124-00119City permit recordFire OperationalFlammable and Combustible Liquids Permit - Annual InspectionComplete
2024-01-22finaledTF-FOP-0124-00097City permit recordFire OperationalBehavioral Health HospitalComplete
2022-10-12finaledT22FO00882City permit recordFire OperationalState Lic Facls Annual Insp - 84 BEDS; Behavioral Health - # of Beds: 84Complete
2022-10-04finaledT22FO00848City permit recordFire OperationalFlammable & Combustible Liquid - FLAMMABLE AND COMBUSTIBLE LIQUIDS; Other Operational PermitComplete
2022-04-06finaledT22CM02535City permit recordCOMBOBOILER REPLACEMENTFinal
2022-01-06finaledT22FO00017City permit recordFIREOPERPALO VERDE BEHAVIORAL HEALTH - FLAMMABLE AND COMBUSTIBLE LIQUIDS.Final
2022-01-05T22CM00093City permit recordAddition / alterationThe project consists of an addition and several renovation to the Palo Verde Behavioral Health facilExpired
2021-10-12finaledT21FO00686City permit recordFIREOPER84 BEDSFinal
2021-08-12DP21-0208City permit recordAddition / alterationWithdrawn - Site/Grading/Swppp - Palo Verde Behavioral Health. 28-bed addition and renovation. New drive and parWithdrawn
2021-01-13finaledT21CM00363City permit recordCOMBOShade structure consisting of four columns and one shade sail providing approximately 444 square feet of shade.Final
2020-12-24finaledDP20-0264City permit recordDevelopment PackageSITE - Palo Verde Behavioral health, shade structure, 444 sq. foot.Complete
2020-05-12finaledT20FO00266City permit recordFIREOPERBEHAVIORAL HEALTH HOSPITAL - 84 BEDSFinal
2019-05-03finaledT19FO00326City permit recordFIREOPERPalo Verde Behavioral Health - Occ Load - 84 BedsFinal
2018-05-10finaledT18FO00400City permit recordFIREOPERBEHAVIORAL HEALTH HOSPITAL - 84 BEDSFinal
2017-12-04finaledT17FC00981City permit recordFIRECONSMODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM.Final
2016-09-26finaledT16FC00078City permit recordFIRECONSMODIFY EXISTING SPRINKLERFinal
2014-06-26expired 2017-01-25DP14-0113City permit recordDevelopment PackageSITE/GRADING/SWPPP - PALO VERDE BEHAVIORAL HEALTHExpired

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (1)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 1 of 1 records
DateRecordWhatStatus
2012-07-09T12DV05740Housing code violationEMERGENCYrecorded before 2023COMPLIAN

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 11012091A — 27 permits on file from 2014 to 2026 (9 fire operational, 5 fireoper, 4 right-of-way (row), 2 combo) and 1 code enforcement case — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.