Electrical permit history — 2500 N Rosemont Bl

2500 N Rosemont Bl, Tucson — built 1989, with 31 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

2500 N Rosemont Bl

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1989 — 1980s commercial stock · HVAC 1998 (finaled)

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 state licensed facility operational fire permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service or distribution work shows in the record we read. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalLikely dueLast permitted 1998 (28 years ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T98ME00584 — BOILER:RETUBE
  • Fire alarm & life safetyFinaled permit foundA newer 2025 permit for the same system is recorded as “Issued” — The work was permitted, but final completion is not confirmed. The permit description states “INSTALLATION OF DIALER ONLY - EXISTING FIRE ALARM SYSTEM”. Last permitted 2023 (3 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0423-00548 — Upgrading cellular dialer
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Routine

    Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.

  • Routine

    A trade permit was pulled in 2017. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 1,610 sq ft (county building-footprint layer; 1 neighbouring structure crossing the lot line excluded)
Usable for solar, planning estimate
≈ 1,100 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 10 kW — roughly 30 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 16,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$1,500–$2,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 2.1 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
11011176E
Year constructed
1989 (assessor record)
Permitting authority
Tucson
Zoning
O-3
Property type
Apartments W/ Medical Or Nursing Care
Building area
400,299 sq ft

The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 31 building permits for this parcel dated between 1997 and 2026. By category the work is trade permit (7), state licensed facility operational fire (5), addition / alteration (4) and fire automatic extinguishing system (4). 23 of them carry a final inspection; the other 8 were issued, expired or are still open, which is not the same as work completed. There are 5 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 11011176E. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All commercial property · Commercial property in 85712 · Commercial & industrial reports · Homes in 85712 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on N ROSEMONT BL hold 326 City permits on record, 85 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (36 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TS-PRM-0226-00044Permanent Sign PermitIssued
2025TF-FCP-1125-00986Fire Alarm System PermitIssued
2025TF-FOP-1025-01324State Licensed Facility Operational Fire PermitComplete
2025TF-FOP-0924-01098State Licensed Facility Operational Fire PermitComplete
2025TZ-CMP-0325-00050Zoning ComplianceComplete
2024TF-FCP-0724-00593Storage Tank PermitComplete
2024TF-FOP-0724-00859General Operational Fire PermitWithdrawn
2023TF-FOP-0623-01176State Licensed Facility Operational Fire PermitComplete
2023TF-FOP-1023-01643General Operational Fire PermitComplete
2023TF-FCP-1023-01219Other IFC Construction PermitComplete
2023TF-FCP-0423-00548Fire Alarm System PermitComplete
2022T22FO00553State Licensed Facility Operational Fire PermitComplete
2021T21DV04458EMERGENCYCOMPLIAN
2021T21FO00256General Operational Fire PermitComplete
2021T21FO00257State Licensed Facility Operational Fire PermitComplete
2020T20DV05177RES: MINIMUM HOUSINGFIELD
2020T20DV04288PROP MAINT MULTIPLE TYPESCOMPLIAN
2017T17CM07721Commercial Trade PermitComplete
2015T15DV09694EMERGENCYCOMPLIAN
2015T15CM04162Commercial Addition/Alteration PermitCanceled
2013T13BU01337Fire Automatic Extinguishing System PermitCanceled
2013T13BU00796Commercial Trade PermitComplete
2013T13BU00249Commercial Trade PermitCanceled
2012T12DV04866EMERGENCYCOMPLIAN
2012T12BU00136Fire Automatic Extinguishing System PermitComplete
2008T08SA00457Zoning ComplianceComplete
2008T08BU01570Commercial Trade PermitComplete
2006T06BU01296Fire Automatic Extinguishing System PermitComplete
2006T05CM06012Commercial Addition/Alteration PermitComplete
2005T05BU01625Fire Automatic Extinguishing System PermitComplete
2005T05BA00070Stormwater BasinApproved
2005T04CM05381Commercial Addition/Alteration PermitCanceled
2000T00ME01161Commercial Trade PermitComplete
1999T99ME00073Commercial Trade PermitComplete
1998T98ME00584Commercial Trade PermitComplete
1997T97BU00628Commercial Addition/Alteration PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 11011176E — 31 City permits on file from 1997 to 2026 and 5 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-08-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.