Electrical permit history — 5477 E Fort Lowell Rd
5477 E Fort Lowell Rd, Tucson — built 1948, with 12 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
5477 E Fort Lowell Rd
Built 1948 — 1940s commercial stock · last permitted panel/service work 1999 (finaled); a newer 1999 permit is expired without a final
Permanent link: Electrical permit history for 5477 E Fort Lowell Rd (aztucsonelectricalsolutions.com/property/11009006l/5477-e-fort-lowell-rd-tucson-az-85712) · Public records last checked 2026-08-17
- Parcel
- 11009006L
- Built
- 1948 (county record)
- Jurisdiction
- Tucson
- Zoning
- HR-1
- Assessor use
- Municipal Residential Property
- Parcel size
- 2.34 acres
- Building area
- 5,167 sq ft (assessor record)
- Sewer
- Connection on file (1975, 2025) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Fort Lowell Multiple Resource Area — Historic Preservation Zone (City of Tucson)
- Service on record
- City records show the 1999 permit was finalized; the permit description states “UPGRADE: 60 AMP TO 100 AMP” — an increase in capacity as described, not a confirmed installed rating.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionGetting onA newer 1999 permit for the same system is recorded as “Expired” — The permit expired without a confirmed final status. The permit description states “UPGRADE: 3 100AMP METER BASES”. Last permitted 1999 (27 years ago). Contractor of record: BROCKETT ELECTRIC ,. The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T99EL02619 — UPGRADE: 60 AMP TO 100 AMP
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 commercial building permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2025-06-17 (TR-UTL-0625-00972) — WO T153202 - AFTER-THE-FACT REMOVED (1) POLE AT 5479 E FORT LOWELL ROAD & OVERHEAD SECONDARY WIRE CROSSING CRAYCROFT ROAD AS A PRIORITY 06/16.
Permit history (12)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-06-17finaled | TR-UTL-0625-00972City permit record | Right-of-Way (ROW) - UtilityWO T153202 - AFTER-THE-FACT REMOVED (1) POLE AT 5479 E FORT LOWELL ROAD & OVERHEAD SECONDARY WIRE CROSSING CRAYCROFT ROAD AS A PRIORITY 06/16 | Complete | |
| 2025-06-12finaled | TR-UTL-0625-00947City permit record | Right-of-Way (ROW) - UtilityWE WILL BE EXCAVATING 2 3X3 TRENCHES TO ABANDON EXISTING GAS SERVICES IN ROW IN ASPHALT. SEE SITE PLAN FOR LOCATIONS | Complete | |
| 2025-02-18finaled | TC-COM-0225-00343City permit record | Commercial BuildingThis is for Fire Review only | Inspections complete | |
| 2025-02-10finaled | TR-ROW-0225-00188City permit record | Right-of-Way (ROW)Fort Lowell Day; historic sites walking tour on Fort Lowell Road between Craycroft & Beverly and events at Fort Lowell Park Traffic control set up and take down: 10:30 am to 4:30 pm | Complete | |
| 2024-08-15finaled | TR-UTL-0824-01527City permit record | Right-of-Way (ROW) - Utilitywo 2857075 5479 e fort lowell rd 13 14 35 ne repair leaking valve on northeast of lot 6LF/sc **EMERGENCY WORK- ALREADY COMPLETED** | Complete | |
| 2022-04-19finaled | T22CM02900City permit record | Commercial BuildingPreservation of exterior | Complete | |
| 2005-11-21 | T05EL02330City permit record | ELECTELECTRIC RECONNECT | Withdrwn | |
| 2005-11-21finaled | T05PL01876City permit record | PLUMBELECRTIC RECONNECT | Final |
Show 4 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2002-04-12expired 2002-11-20 | T02BU01097City permit record | GRADINGGRADING:425CY CUT & 500CY FILL | Withdrwn | |
| 2001-06-07expired 2001-12-04 | T01BU01648City permit record | GRADINGGRUBBING:20 CY CUT | Expired | |
| 1999-10-05expired 2000-05-01 | T99EL02617City permit record | ELECTUPGRADE: 3 100AMP METER BASES | Expired | |
| 1999-10-05finaled | T99EL02619City permit record | ELECTUPGRADE: 60 AMP TO 100 AMP | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 11009006L — 12 permits on file from 1999 to 2025 (3 right-of-way (row) - utility, 3 elect, 2 commercial building, 2 grading) — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).