Electrical permit history — 3231 N Craycroft Rd

3231 N Craycroft Rd, Tucson — built 1966, with 63 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

3231 N Craycroft Rd

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1966 — 1960s commercial stock · HVAC 2011 (finaled)

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 special events fire permit - organizer permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Nothing permitted on the service or distribution shows in the record we read, which for a building of this era leaves the original switchgear generation in play. Obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown — worth establishing what is actually installed before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalLikely dueLast permitted 2011 (15 years ago). Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. T11CM01278 — UPGRADE: HVAC
  • Fire alarm & life safetyLikely dueLast permitted 2002 (24 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T02BU00572 — FIRE SPKR:ALARM SYSTEM
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2024. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Worth confirming

    Solar was permitted here in 2011. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.

  • Routine

    A trade permit was pulled in 2015. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 106,909 sq ft (county building-footprint layer, 17 structures)
Usable for solar, planning estimate
≈ 74,800 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 820 kW — roughly 2,050 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 1,350,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$108,000–$176,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 3.1 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
10926009E
Year constructed
1966 (assessor record)
Permitting authority
Tucson
Zoning
HSR
Property type
Privately Owned Academic School
Building area
32,485 sq ft
Historic preservation
(City of Tucson)

The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2025. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2025. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 63 building permits for this parcel dated between 1997 and 2025. By category the work is special events fire permit - organizer (11), special events fire permit - vendor (10), trade permit (8) and addition / alteration (6). 50 of them carry a final inspection; the other 13 were issued, expired or are still open, which is not the same as work completed.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 10926009E. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All commercial property · Commercial property in 85712 · Commercial & industrial reports · Homes in 85712 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on N CRAYCROFT RD hold 787 City permits on record, 233 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (63 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2025TF-FOP-0925-01167Special Events Fire Permit - OrganizerComplete
2025TF-FOP-1025-01358Special Events Fire Permit - VendorComplete
2024TF-FOP-1024-01194Special Events Fire Permit - VendorComplete
2024TD-DEV-1123-00453Development PackageIssued
2024TF-FOP-0824-00970Special Events Fire Permit - OrganizerComplete
2024TS-MSP0824-00005Master Sign ProgramApproved
2024TE-FPU-0624-00169Floodplain Use PermitIssued
2024TS-PRM-0624-00266Permanent Sign PermitExpired
2024recordRight-of-Way (ROW) Permit - UtilityComplete
2024SD-0224-00012Historic Preservation Zone/Historic LandmarkComplete
2024recordRight-of-Way (ROW) Permit - Utility EmergencyComplete
2023TF-FOP-0923-01526Special Events Fire Permit - OrganizerComplete
2023TF-FOP-1023-01660Special Events Fire Permit - VendorComplete
2022T22FO00861Special Events Fire Permit - VendorComplete
2022T22FO00697Special Events Fire Permit - OrganizerComplete
2022T22PRE0033Pre-Application ConferenceCanceled
2021DP21-0294 Development PackageCanceled
2021T21FO00705Special Events Fire Permit - VendorCanceled
2021T21FO00452Special Events Fire Permit - OrganizerComplete
2020T20FO00393Special Events Fire Permit - VendorComplete
2020T20SA00222Zoning ComplianceApproved
2019T19FO00913Special Events Fire Permit - OrganizerComplete
2019T19FO00710Special Events Fire Permit - OrganizerComplete
2019T19CM04575Commercial Addition/Alteration PermitComplete
2019T19OT00592Floodplain Use PermitCanceled
2018T18FO00977Special Events Fire Permit - VendorComplete
2018T18FO00947Special Events Fire Permit - OrganizerComplete
2018T18FO00907Special Events Fire Permit - VendorComplete
2018T18FO00829Special Events Fire Permit - OrganizerComplete
2018T18CM04551Commercial Addition/Alteration PermitComplete
2018T18OT00634Floodplain Use PermitCanceled
2018T18BU00132Commercial DemolitionComplete
2017T17FO00925Special Events Fire Permit - OrganizerComplete
2017T17FO00879Special Events Fire Permit - VendorComplete
2017T17FO00798Special Events Fire Permit - OrganizerComplete
2016T16FO00053Special Events Fire Permit - VendorComplete
2015T15CM05041Commercial Trade PermitComplete
2011T11CM01278Commercial Trade PermitComplete
2011T11OT01440Annual Portable Sign ComplianceComplete
2011T11CM01911Commercial Addition/Alteration PermitComplete
2011T11OT01223Floodplain Use PermitComplete
2009C10-00-84Zoning ComplianceApproved
2008T07CM04328Commercial New Building PermitCanceled
2007T07OT02314Permanent Sign PermitComplete
2004T04OT01394Development PackageComplete
2002T02BU00572Commercial Trade PermitComplete
2002T02BU00835Commercial Trade PermitComplete
2002T02BU00081Fire Automatic Extinguishing System PermitComplete
2001T01BU03007Fire Automatic Extinguishing System PermitComplete
2001T01CM03304Commercial New Building PermitComplete
2001T01CM03311Commercial New Building PermitComplete
2001T01BU02532GradingComplete
2001T01CM03309Commercial New Building PermitComplete
2001T01BU02340Commercial Trade PermitComplete
2001T01CM03310Commercial New Building PermitWithdrawn
2001T00CM04938Commercial Addition/Alteration PermitComplete
2000T00EL02857Commercial Trade PermitComplete
2000T00CM03631Commercial Addition/Alteration PermitComplete
1999T99ME01258Commercial Trade PermitComplete
1999T99CM00052Commercial Addition/Alteration PermitComplete
1997T97ME00559Commercial Trade PermitComplete
1997T97BU01259Fire Automatic Extinguishing System PermitComplete
1997T97BU00041Fire Automatic Extinguishing System PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 10926009E — 63 City permits on file from 1997 to 2025 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.