Electrical permit history — 2626 E River Rd
2626 E River Rd
- Electrical service: no service or distribution permit on record for this 2019 building.
- Watch for: built 2019; the live question is spare capacity for new loads, not the age of the gear.
- Other work on record: state licensed facility operational fire permit 2025, fire alarm system permit 2025, permanent sign permit 2023, and 17 more — see the records below.
From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
Is it time to upgrade?
Probably not: no service or distribution work is on record, which is normal for a building built in 2019.
- Electrical service & distributionLooks currentNo service or distribution permit on record for this 2019 building. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Worth knowing: a 2025 state licensed facility operational fire permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalLooks currentBuilt 2019; no permit on record since, which is normal for equipment this age. Worth knowing: a 2025 state licensed facility operational fire permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyLooks currentLast permitted 2025 (1 year ago) — the permit passed final inspection. Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0725-00594 — UPGRADE THE EXISTING DIALER TO A CELLULAR DIALER, CONNECTED TO A FIRE ALARM PANEL.
- RoofLooks currentBuilt 2019; no permit on record since, which is normal for equipment this age. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
What that usually means electrically
- Routine
Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.
- Routine
A trade permit was pulled in 2021. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.
Solar and energy potential
- Roof footprint
- ≈ 15,663 sq ft (assessor’s building area ÷ recorded stories — approximate)
- Usable for solar, planning estimate
- ≈ 11,000 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 120 kW — roughly 300 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 200,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- Estimate $16,000–$26,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 3.9 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 10824008G ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 10824008G
- Year constructed
- 2019 (assessor record)
- Permitting authority
- Tucson
- Zoning
- O-3
- Property type
- Medical Dental Service
- Building area
- 15,663 sq ft
- Electrical service
- No service or distribution permit on record for this 2019 building. (the era estimate is from the year built, 2019 — not a measurement)
Building area comes from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.
What this means for work here
The most recent permit with evidence of issuance is dated 2025. City records show the permit was finalized. The permit covers only the work described in that record.
What that reading rests on. The issuing offices hold 22 building permits for this parcel dated between 2015 and 2025. Six fire alarm system permits, four fire automatic extinguishing system permits, two zoning compliance permits and two trade permits. 20 of them carry a final inspection; the other 2 were issued, expired or are still open, which is not the same as work completed. There are 3 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
City permit record (21): 2025 TF-FOP-1225-01662 · 2025 TF-FCP-0725-00594 · 2022 T22SA00291 · 2021 T21CM01586 · 2021 T21FC00077 · 2021 T21FC00029 · 2021 T20CM08700 · 2020 T20FC00127 · 2020 T20FC00023 · 2019 T19FC00799 · 2019 T19FC00649 · 2019 T19FC00590 · 2019 T19CM04951 · 2019 T19TUP0010 · 2019 T19CM03078 · 2019 T19CM03106 · 2019 DP19-0099 · 2018 T16OT00090 · 2017 T17FC00995 · 2015 T15BU01198 · 2015 T15SA00333
Code enforcement cases (3): 2025 CE-VIO1125-05106 · 2025 CE-VIO1125-05104 · 2019 T19DV05659
Sign (1): 2023 T20OT00353
Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 10824008G.
See an error? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All commercial property · Commercial property in 85718 · Commercial & industrial reports · Homes in 85718 · Permit data by neighborhood
Planning work at this property?
Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.
Want a plain-English brief of this record first?
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Permanent link: Electrical permit history for 2626 E River Rd (aztucsonelectricalsolutions.com/property/10824008g/2626-e-river-rd-tucson-az-85718)
Electrical summary — 2626 E River Rd, Tucson, AZ 85718
Parcel 10824008GYear built 2019Building area 15,663 sq ftPermit history City of TucsonRecord checked 13 Nov 2026
- Electrical service: no service or distribution permit on record for this 2019 building.
- Watch for: built 2019; the live question is spare capacity for new loads, not the age of the gear.
- Other work on record: state licensed facility operational fire permit 2025, fire alarm system permit 2025, permanent sign permit 2023, and 17 more — see the records below.
Permits on record, newest first
| Date | Permit | Type | Status |
|---|---|---|---|
| Dec 2025 | TF-FOP-1225-01662 | State licensed facility operational fire permit | Final |
| Aug 2025 | TF-FCP-0725-00594 | Fire alarm system permit | Final |
| Apr 2023 | T20OT00353 | Permanent sign permit | Final |
| Jun 2022 | T22SA00291 | Zoning compliance permit | Final |
| Apr 2021 | T21CM01586 | Trade permit | Final |
| Feb 2021 | T21FC00077 | Fire alarm system permit | Final |
| Jan 2021 | T21FC00029 | Fire automatic extinguishing system permit | Final |
| Jan 2021 | T20CM08700 | Addition or alteration permit | Final |
and 12 more at the live report.
Voided or withdrawn permit records: 2 (not listed).
Ask your inspector or engineer to check
- The main switchboard’s nameplate rating and the age and make of the distribution gear.
- Whether the arc-flash labels match the installed gear (NFPA 70E reviews them every five years).
Live report: https://www.aztucsonelectricalsolutions.com/property/10824008g/2626-e-river-rd-tucson-az-85718
How this property compares nearby
Properties on E RIVER RD hold 2,078 City permits on record, 573 of them since 2022.
Counts and years from the same public records.
Complete permit record (25 entries)
Every permit and case we hold for this parcel, newest first. Each number links to the official file.
| Year | Number | Type | Status |
|---|---|---|---|
| 2025 | TF-FOP-1225-01662 | State Licensed Facility Operational Fire Permit | Complete |
| 2025 | CE-VIO1125-05106 | Code enforcement case | Closed - Resolved |
| 2025 | CE-VIO1125-05104 | Code enforcement case | Closed - Resolved |
| 2025 | TF-FCP-0725-00594 | Fire Alarm System Permit | Complete |
| 2023 | T20OT00353 | Permanent Sign Permit | Complete |
| 2022 | T22SA00291 | Zoning Compliance | Complete |
| 2021 | T21CM01586 | Commercial Trade Permit | Complete |
| 2021 | T21FC00077 | Fire Alarm System Permit | Complete |
| 2021 | T21FC00029 | Fire Automatic Extinguishing System Permit | Complete |
| 2021 | T20CM08700 | Commercial Addition/Alteration Permit | Complete |
| 2020 | T20FC00127 | Fire Alarm System Permit | Complete |
| 2020 | T20FC00023 | Fire Automatic Extinguishing System Permit | Complete |
| 2019 | T19FC00799 | Fire Automatic Extinguishing System Permit | Complete |
| 2019 | T19FC00649 | Fire Alarm System Permit | Complete |
| 2019 | T19FC00590 | Fire Alarm System Permit | Canceled |
| 2019 | T19DV05659 | SIGN VIOLATION | COMPLIAN |
| 2019 | T19CM04951 | Commercial Trade Permit | Complete |
| 2019 | T19TUP0010 | Temporary Use Permit | Canceled |
| 2019 | T19CM03078 | Commercial New Building Permit | Complete |
| 2019 | T19CM03106 | Commercial Addition/Alteration Permit | Complete |
| 2019 | DP19-0099 | Development Package | Complete |
| 2018 | T16OT00090 | Elevation Certificate | Complete |
| 2017 | T17FC00995 | Fire Alarm System Permit | Complete |
| 2015 | T15BU01198 | Fire Automatic Extinguishing System Permit | Complete |
| 2015 | T15SA00333 | Zoning Compliance | Complete |
How this report was built
This is a reading of public records for parcel 10824008G — 22 City permits on file from 2015 to 2025 and 3 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year and living area on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.
What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.
Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
Permit history: City of Tucson addresses, back to the mid-1990s. Elsewhere in Pima County: property facts from the Assessor, no permit history yet.