Electrical permit history — 1880 E River Rd

1880 E River Rd, Tucson — built 1985, with 176 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

1880 E River Rd

Built 1985 — 1980s commercial stock · HVAC 2024 (finaled)

Parcel
10821328B
Built
1985 (county record)
Jurisdiction
Tucson
Zoning
C-1
Assessor use
Office Building 2 Story
Parcel size
7.90 acres
Building area
145,357 sq ft (assessor record)
Sewer
Connection on file (2017, 2018, 2025) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 1880 E River Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalCurrentLast permitted 2024 (2 years ago). City inspection record: COT - LCBU - Building Final approved 2024-06-17. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. TC-COM-0424-00661 — Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
  • Fire alarm & life safetyCurrentLast permitted this year (2026). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0626-00366 — Modify existing fire sprinkler system
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Routine

    Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.

Recorded sales (2)

Recorded transfers from the Pima County Assessor — 2 of 2
DatePriceType
2019-10-18$20,850,000Warranty Deed
2003-01-10$315,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2026-06-02 (TF-FCP-0626-00366) — Modify existing fire sprinkler system.

Permit history (176)

Permit history for this parcel — 8 of 176 records
DateRecordWhatStatusValue
2026-06-02finaledTF-FCP-0626-00366City permit recordFire ConstructionModify existing fire sprinkler systemComplete
2026-05-20finaledTF-FOP-0526-00705City permit recordFire OperationalFire Operational Permit - Prosano healthComplete
2026-04-22finaledTS-PRM-0426-00142City permit recordFence / wallInstall one non-lighted wall signInspections complete
2026-04-17finaledTC-COM-0426-00569City permit recordDemolition1. TENANT IMPROVEMENT FOR VALLEY SLEEP. NEW OFFICE LAYOUT. MINOR DEMOLITION OF INTERIOR WALLS FOR NEW OFFICE LAYOUT. MECHANICAL AND ELECTRICAL DISTRIBUTION TO BE REWORKED PER NEW LAYOUT. NO CHANGE OF USE. ALL SITE CONDITIONS TO REMAIN AS IS.Complete
2026-04-17finaledTC-COM-0426-00570City permit recordDemolition1. TENANT IMPROVEMENT FOR VALLEY SLEEP. NEW OFFICE LAYOUT. MINOR DEMOLITION OF INTERIOR WALLS FOR NEW OFFICE LAYOUT. MECHANICAL AND ELECTRICAL DISTRIBUTION TO BE REWORKED PER NEW LAYOUT. NO CHANGE OF USE. ALL SITE CONDITIONS TO REMAIN AS IS.Complete
2026-04-12finaledTF-FOP-0426-00488City permit recordFire OperationalSoleohealthComplete
2025-12-29finaledTF-FOP-1225-01680City permit recordFire OperationalValley Sleep CenterComplete
2025-10-20finaledTF-FCP-1025-00913City permit recordFire ConstructionModify existing fire sprinkler systemComplete

168 older records are not shown here. — each links to its official file.

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (29)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 29 records
DateRecordWhatStatus
2025-02-06CE-VIO0225-00573Code enforcement caseWork without permitClosed - resolved
2021-08-06T21DV05051Code enforcement caseCode enforcement caseComplian
2021-05-12T21DV02835Code enforcement caseCode enforcement caseComplian
2011-02-09finaledT11FR00413Code enforcement caseCode enforcement caseComplete
2011-01-31finaledT11FR00285Code enforcement caseCode enforcement caseComplete
2011-01-03finaledT11FR00011Code enforcement caseCode enforcement caseComplete
2010-10-15finaledT10FR02121Code enforcement caseCode enforcement caseComplete
2010-03-09finaledT10FR00528Code enforcement caseCode enforcement caseComplete
Show 21 older records
Code enforcement history for this parcel — remaining 21 records
DateRecordWhatStatus
2010-01-26finaledT10FR00188Code enforcement caseCode enforcement caseComplete
2010-01-26T10FR00187Code enforcement caseCode enforcement caseField
2010-01-20finaledT10FR00102Code enforcement caseCode enforcement caseComplete
2009-10-20finaledT09FR03313Code enforcement caseCode enforcement caseComplete
2009-09-22T09DV05507Code enforcement caseCode enforcement caseNoverify
2009-09-10finaledT09FR02927Code enforcement caseCode enforcement caseComplete
2009-07-29T09FR02507Code enforcement caseCode enforcement caseField
2009-07-07finaledT09FR02224Code enforcement caseCode enforcement caseComplete
2009-05-18T09FR01735Code enforcement caseCode enforcement caseField
2008-11-06T08FR04239Code enforcement caseCode enforcement caseField
2008-09-26T08FR03181Code enforcement caseCode enforcement caseField
2008-09-15finaledT08FR02783Code enforcement caseCode enforcement caseComplete
2008-06-24finaledT08FR01686Code enforcement caseCode enforcement caseComplete
2008-06-02finaledT08FR01387Code enforcement caseCode enforcement caseComplete
2008-04-15finaledT08FR00984Code enforcement caseCode enforcement caseComplete
2006-07-06finaledT06FR02171Code enforcement caseCode enforcement caseComplete
2006-05-15finaledT06FR01354Code enforcement caseCode enforcement caseComplete
2006-04-21finaledT06FR00871Code enforcement caseCode enforcement caseComplete
2006-03-08finaledT06FR00321Code enforcement caseCode enforcement caseComplete
2006-03-08finaledT06FR00319Code enforcement caseCode enforcement caseComplete
2005-08-03finaledT05FR01206Code enforcement caseCode enforcement caseComplete

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 10821328B — 176 permits on file from 2004 to 2026 (36 combo, 19 commercial building, 19 sign, 18 spklr) and 29 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.