Electrical permit history — 4798 N 1st Av
4798 N 1st Av, Tucson — built 2004, with 18 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
4798 N 1st Av
Build year not published — permits on file from 2004 · 18 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 4798 N 1st Av (aztucsonelectricalsolutions.com/property/10819009b/4798-n-1st-av-tucson-az-85718) · Public records last checked 2026-08-17
- Parcel
- 10819009B
- Built
- 2004 (earliest permit on file)
- Jurisdiction
- Tucson
- Zoning
- SH
- Assessor use
- Municipal Police/Fire Department Facility
- Parcel size
- 1.42 acres
- Sewer
- Connection on file (2005) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 right-of-way (row) permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 right-of-way (row) permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyLikely dueLast permitted 2005 (21 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T05BU00528 — FIRE SPKR:KITCHEN FIRE EXHAUST HOOD SYSTEM
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Solar was permitted here in 2023. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
Most recent permit on record for this parcel: 2025-11-10 (TR-ROW-1125-01391) — Installation of underground conduit pathway for low voltage communications. Fiber connection to City Of Tucson water reservoir for security upgrade starting at 4798 N 1st Ave. (Fire Station 20) and ending at 5850 N 1st Ave. (Devine Water Reservoir)..
Permit history (18)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-11-10finaled | TR-ROW-1125-01391City permit record | Right-of-Way (ROW)Installation of underground conduit pathway for low voltage communications. Fiber connection to City Of Tucson water reservoir for security upgrade starting at 4798 N 1st Ave. (Fire Station 20) and ending at 5850 N 1st Ave. (Devine Water Reservoir). | Complete | |
| 2025-06-24 | TR-ROW-0625-00851City permit record | Right-of-Way (ROW)Installation of NEW UGC for communications. New fiber optic install for IT connection from FS 20 to Devine Reservoir. | Needs resubmittal | |
| 2023-11-08finaled | TR-ROW-1123-01336City permit record | Solar PVThe contractor will be installing Solar Flashers for the Fire Department for Abel Rosales for the City of Tucson. Sidewalk will be available for pedestrians. | Complete | |
| 2022-05-16expired 2022-10-14 | T22RW01847City permit record | Right-of-Way (ROW)600' OF BORE, INSTALL NEW POWER SUPPLY ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE; Work Order: 83626 | In review | |
| 2020-11-11 | T20CM07963City permit record | Commercial BuildingREPL CELL TOWER ANTENNAS | Approved | |
| 2019-10-09finaled | T19RW05961City permit record | ROWOriginal Permit-T19RW02786- Start Point: From the COX ped on the NW corner of 4502 N 1st Ave, begin 312' pull through existing conduit heading North, continue 118' pull through heading West. 353' pull through heading North , continue pull through, West 35' to out of ROW NOTES: AS THE CONTRACTOR, YOU MUST FOLLOW THE RUNNING LINE SUBMITTED TO THE CITY, IF DEVIATED, A REVISION MUST BE SUBMITTED AND APPROVED BEFORE CONTINUING WORK. 1 St is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. | Final | |
| 2019-03-25finaled | DP19-0073City permit record | Solar PVSITE - Tucson Fire Dept, Station 20, commercial solar. | Complete | |
| 2019-03-21finaled | T19CM02018City permit record | COMBOPV CANOPY SYSTEM | Final |
Show 10 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2006-03-31finaled | T06OT00909City permit record | SIGN10948 | Final | |
| 2005-03-07finaled | T05BU00528City permit record | BUILDFIRE SPKR:KITCHEN FIRE EXHAUST HOOD SYSTEM | Final | |
| 2005-01-12finaled | T05BU00086City permit record | SPKLRFIRE SPKR:ADD 122 | Final | |
| 2004-10-01expired 2005-09-26 | T04BU02407City permit record | TEMP-FBBTEMP FBB:CONSTRUCTION TRAILER & ELECTRIC | Expired | |
| 2004-08-10expired 2005-05-07 | T04EX00805City permit record | EXCAVEXCAV:266 LF DRIVEWAYS/RETURNS/UTILITY TRENCH | Closed | |
| 2004-08-03finaled | T04OT01540City permit record | SIGNSIGN:7545 | Final | |
| 2004-05-28finaled | T04CM02431City permit record | COMBOFIRE STATION #20, C OF O ISSUED 06/01/2006, REPRINTED 07/28/09 | C of o | |
| 2004-04-26finaled | T04BU00996City permit record | GRADINGGRADING:0 CUT & 11600 CY FILL | Final | |
| 2004-04-26expired 2005-01-19 | T04CM01865City permit record | COMBOSITE:FIRE STATION | Expired | |
| 2004-04-26 | T04OT00835City permit record | SITESITE: | Void |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (6)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2018-09-18 | T18DV05837Code enforcement case | Fire | Referred |
| 2010-10-01 | T10FR02028Code enforcement case | Fire | Field |
| 2009-09-21finaled | T09FR03073Code enforcement case | Fire | Complete |
| 2008-11-17finaled | T08FR04330Code enforcement case | Code enforcement case | Complete |
| 2008-11-17 | T08FR04331Code enforcement case | Code enforcement case | Field |
| 2005-01-28finaled | T05FR00126Code enforcement case | Code enforcement case | Complete |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
How this report was built
This is a reading of public records for parcel 10819009B — 18 permits on file from 2004 to 2025 (3 right-of-way (row), 3 combo, 2 solar pv, 2 sign) and 6 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-17; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
