Electrical permit history — 1785 E River Rd

1785 E River Rd, Tucson — built 1999, with 220 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

1785 E River Rd

Built 1999 — 1990s commercial stock · last permitted panel/service work 2000 (finaled)

Parcel
10818716A
Built
1999 (county record)
Jurisdiction
Tucson
Zoning
C-1
Assessor use
Retail Strip Center
Parcel size
3.58 acres
Building area
42,109 sq ft (assessor record)
Sewer
Connection on file (2006, 2009, 2017) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Service on record
City records show the 2000 permit was finalized; the permit description states “NEW SERVICE”.

See the property

County aerial photograph centered on 1785 E River Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionCurrentLast permitted 2000 (26 years ago). City inspection record: last recorded inspection 2000-08-02; no approved final is shown. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T00EL01636 — NEW SERVICE
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire construction permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyCurrentLast permitted 2024 (2 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0524-00374 — Modification of existing fire sprinkler system to accommodate new tenant remodel.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2010. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Worth confirming

    There is an electrical reconnect permit from 2003. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.

Most recent permit on record for this parcel: 2026-06-01 (TR-UTL-0626-00909) — Tie point will be existing underground vault with Comcast plant. Bore 140' of 2" conduit at a depth of 3'. Run 140' of 48ct fiber and place new vault. Bore 380' of 2" conduit at a depth of 3'. Run 380' of 48ct fiber and place new vault. Bore 250' of 2" conduit at a depth of 3'. Run 250' of 48ct fiber. 08/14/26-Renew permit for 30 days as of 08/13/26 new expiration date is 09/12/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts..

Permit history (220)

Permit history for this parcel — 8 of 220 records
DateRecordWhatStatusValue
2026-06-01expired 2026-08-13TR-UTL-0626-00909City permit recordRight-of-Way (ROW) - UtilityTie point will be existing underground vault with Comcast plant. Bore 140' of 2" conduit at a depth of 3'. Run 140' of 48ct fiber and place new vault. Bore 380' of 2" conduit at a depth of 3'. Run 380' of 48ct fiber and place new vault. Bore 250' of 2" conduit at a depth of 3'. Run 250' of 48ct fiber. 08/14/26-Renew permit for 30 days as of 08/13/26 new expiration date is 09/12/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.Fees due
2025-12-04expires 2026-08-18TS-PRM-1225-00499City permit recordFence / wall(2) New illuminated wall signsIssued
2025-09-26finaledTF-FCP-0925-00862City permit recordFire ConstructionUnit RemodelComplete
2025-07-16finaledTC-COM-0725-01378City permit recordCommercial BuildingInterior RemodelComplete
2025-04-28TC-COM-0425-00848City permit recordCommercial BuildingReplacement of (8) 5-Ton and (1) 6-Ton HVAC Rooftop Units. Like for Like Change-Out.Withdrawn
2024-11-19finaledSP-NRP-1124-00144City permit recordSimple*Complete - Added to Utility Clearance Report* - - Meter #147550290 is inactive/locked out. for 1745 E. River Rd, Ste 135. We need this inspected and cleared in order to establish electric service from TEP - -Complete
2024-10-25expired 2025-04-23TS-PRM-1024-00471City permit recordFence / wall(2) New illuminated wall signsIssued
2024-09-18finaledTR-UTL-0924-01787City permit recordRight-of-Way (ROW) - UtilityC.3035452 - ACCESS MH 23572 FOR SPLICINGComplete

212 older records are not shown here. — each links to its official file.

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (11)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 8 of 11 records
DateRecordWhatStatus
2021-10-19T21DV07306Code enforcement caseCode enforcement caseComplian
2019-09-16T19DV07255Code enforcement caseFireComplian
2016-02-24T16DV00995Code enforcement caseCode enforcement caseNoverify
2008-12-15finaledT08FR04729Code enforcement caseCode enforcement caseComplete
2008-06-17finaledT08FR01553Code enforcement caseCode enforcement caseComplete
2006-05-19T06VL00655Code enforcement caseWork without permitVoid
2006-04-13finaledT06FR00789Code enforcement caseCode enforcement caseComplete
2005-12-13finaledT05FR01907Code enforcement caseCode enforcement caseComplete
Show 3 older records
Code enforcement history for this parcel — remaining 3 records
DateRecordWhatStatus
2005-12-08T05VL01209Code enforcement caseSignInvalid
2005-01-03finaledT05FR00001Code enforcement caseCode enforcement caseComplete
2000-05-19T00VL00693Code enforcement caseSignComplian

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 10818716A — 220 permits on file from 1999 to 2026 (41 combo, 40 spklr, 27 sign, 26 addrnew) and 11 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.