Electrical permit history — 4910 N 1st Av
4910 N 1st Av, Tucson — built 1994, with 20 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
4910 N 1st Av
Built 1994 — 1990s commercial stock · 20 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 4910 N 1st Av (aztucsonelectricalsolutions.com/property/10816008g/4910-n-1st-av-tucson-az-85718) · Public records last checked 2026-08-16
- Parcel
- 10816008G
- Built
- 1994 (county record)
- Jurisdiction
- Tucson
- Zoning
- C-1
- Assessor use
- Free Standing Drugstore
- Parcel size
- 2.56 acres
- Building area
- 15,525 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2021 firecons permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2021 firecons permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2021 (5 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T21FC00336 — REPLACE ANALOG POTS LINES WITH A CELL DIALER FOR FIRE ALARM COMMUNICATIONS
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2026-03-09 (TR-ROW-0326-00269) — Replacing 16 LF of displaced curb and 35 SY of affected asphalt on the NE Corner of 1st and River intersection. Duration: 3 days. Owner: Eric Ross, COT DTM..
Permit history (20)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-03-09 | TR-ROW-0326-00269City permit record | Right-of-Way (ROW)Replacing 16 LF of displaced curb and 35 SY of affected asphalt on the NE Corner of 1st and River intersection. Duration: 3 days. Owner: Eric Ross, COT DTM. | Void | |
| 2026-02-26finaled | TR-ROW-0226-00239City permit record | Right-of-Way (ROW)Replacing 16 LF of displaced curb and 35 SY of affected asphalt on the NE Corner of 1st and River intersection. Duration: 3 days. Owner: Eric Ross, COT DTM. | Complete | |
| 2026-01-08expired 2026-06-02 | TR-UTL-0126-00060City permit record | Pool / spa03/03/2026- Renew for 90 days as of 03/04/2026 new expiration date 06/02/2026. (ieb) Tie in at existing vault. overpull 360' south across River Rd to new vault. Bore south on 1st Ave 570'. Add 2 vaults and 2 peds. Bore east 300’ next to fire station. Add 1 vault. Bore south 630' on 1st ave. Add 1 vault. Riser up on pole. Bore west on Bromley 260' then bore south 250' into complex. Add 2 vaults Overlash 1910' over 4 spans. Riser down on last pole to the south. Bore west 90' and add 1 vault and ped. Overpull east from 1st ave 1350'. add 7 vaults. Total bore: 2100’. Total Overpull: 1710’. Total Aerial: 1910’. | Inspections | |
| 2024-12-30finaled | TR-UTL-1224-02442City permit record | Right-of-Way (ROW) - UtilityPRJ284842-1-Cox to intercept existing vault & bore total of 1048ft & tie into 2 existing vault location, will pull 1200ft of (1) 244ct fiber. | Complete | |
| 2022-04-26finaled | T22RW01644City permit record | ROWstarting in front of 4910 N 1st Ave at Cox existing PED, trench north 42' feet installing 2 x 2"conduits and coax, place open boar pit in asphalt drive way, continue east 8’ bore to out of row ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. FOR WORK ONLY ON TUCSON ROW 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | Final | |
| 2022-03-30finaled | T22RW01199City permit record | ROWN.867781- ALONG N. 1ST AVE ACCESS MH 14519 TO SPLICE NEW CABLE AND PLACE IN EXISTING DUCT. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. SHALL COORDINATE WITH EXISTING TRAFFIC CONTROL 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 3. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 4. MAINTAIN PEDESTRIAN ACCESS 5. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | Final | |
| 2021-07-29finaled | T21RW03546City permit record | ROWN.890076-1-ALONG N. 1ST AVE ACCESS MH 14519 TO SPLICE NEW CABLE AND PLACE IN EXISTING DUCT. ADDRESS ON APPLICATION: 4747 N 1ST AV PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. MAINTAIN PEDESTRIAN ACCESS | Final | |
| 2021-05-07finaled | T21FC00336City permit record | FIRECONSREPLACE ANALOG POTS LINES WITH A CELL DIALER FOR FIRE ALARM COMMUNICATIONS | Final |
Show 12 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2021-01-25expired 2022-09-04 | T21OT00065City permit record | Sign - PermanentTo all sign - add new faces + repalce neon with LED. All done with out removing the letters from the | Expired | |
| 2020-10-22finaled | T20RW05801City permit record | ROWOn West Side of 4910 N 1st Ave, place 3x3' pot hole and new Cox Node Ped. | Final | |
| 2020-01-28expired 2022-06-26 | T20FC00070City permit record | Fire ConstructionAutomatic Fire Extingshing Sys - Replace 4" Fire Line BAckflow Assembly and Valves; Commercial Fire Sprinkler Systems - Modification of heads: 2 | Expired | |
| 2019-02-04finaled | T19RW00592City permit record | ROWJob requires access to MH #14519. Access required to splice fiber. | Final | |
| 2016-02-19finaled | T16BU00265City permit record | BUILDALARM | Final | |
| 2011-06-15expired 2011-12-12 | T11ME00164City permit record | MECHMECHANICAL:REPLACE 6 A/C UNITS ON ROOF | Expired | |
| 2009-07-01 | T09CM01721City permit record | COMBONEW ELEC CIRCUIT FOR REDBOX DVD VENDING MACHINE | Withdrwn | |
| 2008-11-04expired 2009-01-03 | T08EX00901City permit record | EXCAVEXCA:438' TRENCH/BORE ASPHALT 195' DIRT TO PLACE 2"PVC CONDUIT FOR COX COM | Closed | |
| 2006-06-21finaled | T06OT01654City permit record | SIGN11370 | Final | |
| 2004-05-17finaled | T04BU01173City permit record | SPKLRFIRE SPKR:RELOCATE14 & ADD 8 | Final | |
| 2004-05-06finaled | T04CM02031City permit record | COMBOTI:RETAIL | Final | |
| 2004-04-29finaled | T04OT00873City permit record | SIGNSIGN:ELECTRIC:7104 | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (6)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2023-10-03 | CE-VIO1023-05869Code enforcement case | Code enforcement case | Closed - unfounded |
| 2014-10-28 | T14DV09073Code enforcement case | Sign | Complian |
| 2009-04-30 | T09FR01507Code enforcement case | Code enforcement case | Field |
| 2008-10-17 | T08DV09901Code enforcement case | Code enforcement case | Complian |
| 2006-12-19 | T06DV03121Code enforcement case | Electrical | Complian |
| 2006-06-16 | T06VL00794Code enforcement case | Code enforcement case | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 10816008G — 20 permits on file from 2004 to 2026 (5 row, 2 right-of-way (row), 2 combo, 2 sign) and 6 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.