Electrical permit history — 3050 N Oracle Rd
3050 N Oracle Rd, Tucson — built 1998, with 24 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
3050 N Oracle Rd
Built 1998 — 1990s commercial stock · last permitted panel/service work 2024 (finaled)
Permanent link: Electrical permit history for 3050 N Oracle Rd (aztucsonelectricalsolutions.com/property/10711146f/3050-n-oracle-rd-tucson-az-85705) · Public records last checked 2026-08-16
- Parcel
- 10711146F
- Built
- 1998 (county record)
- Jurisdiction
- Tucson
- Zoning
- C-2
- Assessor use
- Car/Truck Wash Full Service
- Parcel size
- 0.59 acres
- Building area
- 2,966 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
- Service on record
- City records show the 2024 permit was finalized; the permit description states “Electrical Service Upgrade from 400 Amps 120Y/208V to 800 Amp 480Y/277V. New electrical infrastructure provided to accommodate service upgrade for Mister Car Wash at 3050 N. Oracle Rd. REV1: Electrical Distribution System has been updated. (1) Distribution Board has been added to project scope. Distribution Board shall provide power to (1) MCC (included in previous submittal), and (1) 480V-208Y/120V transformer (included in previous submittal). Distribution Board shall be fed from utility infrastructure (included in previous submittal).” — an increase in capacity as described, not a confirmed installed rating.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionCurrentLast permitted 2024 (2 years ago). City inspection record: COT - LCEL - Electrical Final approved 2025-04-15. The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TC-COM-0924-01878 — Electrical Service Upgrade from 400 Amps 120Y/208V to 800 Amp 480Y/277V. New electrical infrastructure provided to accommodate service upgrade for Mister Car Wash at 3050 N. Oracle Rd. REV1: Electrical Distribution System has been updated. (1) Distribution Board has been added to project scope. Distribution Board shall provide power to (1) MCC (included in previous submittal), and (1) 480V-208Y/120V transformer (included in previous submittal). Distribution Board shall be fed from utility infrastructure (included in previous submittal).
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2020-10-06 | $2,657,563 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2025-02-05 (TR-SWF-0225-00027) — Replacing (3) existing 5G antennas with (3) new 5G antennas.
Permit history (24)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-02-05expired 2026-05-12 | TR-SWF-0225-00027City permit record | Right-of-Way Small WirelessReplacing (3) existing 5G antennas with (3) new 5G antennas | Inspections | |
| 2025-02-04 | TR-SWF-0225-00021City permit record | Right-of-Way Small WirelessMaintenance of existing cell site- replacing 3 antennas with new Ericsson antennas for 5G Cell site-Zeppelin 1 | Void | |
| 2024-10-10finaled | TE-FPU-1024-00325City permit record | Floodplain UseMister Car Wash Minor Development Package - general site and landscaping improvements | Complete | |
| 2024-09-27finaled | TC-COM-0924-01878City permit record | Commercial BuildingElectrical Service Upgrade from 400 Amps 120Y/208V to 800 Amp 480Y/277V. New electrical infrastructure provided to accommodate service upgrade for Mister Car Wash at 3050 N. Oracle Rd. REV1: Electrical Distribution System has been updated. (1) Distribution Board has been added to project scope. Distribution Board shall provide power to (1) MCC (included in previous submittal), and (1) 480V-208Y/120V transformer (included in previous submittal). Distribution Board shall be fed from utility infrastructure (included in previous submittal). | Complete | |
| 2024-08-26finaled | TS-PRM-0824-00378City permit record | Fence / wallWall, pylon, and Monument Sign install | Inspections complete | |
| 2024-05-31finaled | TD-DEV-0524-00168City permit record | Development PackageRevision 1 - Mister Car Wash Minor Development Package - general site and landscaping improvements | Complete | |
| 2023-01-27expired 2023-07-26 | TS-PRM-0123-00159City permit record | Fence / wallInstall 4 lighted wall signs and 2 illuminated directional signs. | Issued | |
| 2022-11-04expired 2023-05-08 | TC-COM-1122-00052City permit record | Commercial BuildingElectrical Secondary Failed - Electrician needs to pull in replacement and have TEP re-energize the line | Issued |
Show 16 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2021-05-26finaled | T21OT00411City permit record | Fence / wall4-illum wall signs | Complete | |
| 2020-03-26finaled | T20RW01876City permit record | Right-of-Way Small WirelessREPLACE CITY OF TUCSON STREET LIGHT POLE WITH A NEW POLE TO MATCH EXISTING CITY LOOK AND DESIGN THAT; Work Order: TUC ZEPPELIN 1 SC | Complete | |
| 2017-06-27expired 2017-12-24 | T17OT00668City permit record | Fence / wall1-ILLUM WALL SIGN | Expired | |
| 2017-02-13expired 2017-09-12 | T17OT00168City permit record | Fence / wall4 - ILLUM WALL SIGNS | Expired | |
| 2016-12-12finaled | DP16-0228City permit record | Development PackageSITE | Complete | |
| 2016-12-08expired 2017-12-03 | T16CM09173City permit record | COMBOEXTERIOR IMPROVEMENTS | Expired | |
| 2016-08-23expired 2017-02-20 | T16OT01033City permit record | SIGNCHANGE OF COPY ON DF | Expired | |
| 2012-05-09finaled | T12OT00726City permit record | FLOODPLNELEVATION CERTIFICATE | Final | |
| 2004-11-02 | T04BU02702City permit record | BUILDFREE STANDING KIOSH | Withdrwn | |
| 2004-02-04finaled | T04OT00225City permit record | SIGNSIGN:6676 | Final | |
| 2003-02-25finaled | T03EL00314City permit record | ELECTUPGRADE:ELECTRIC 400AMP TO 800AMP | Final | |
| 2002-12-12finaled | T02OT01952City permit record | SIGNSIGN:4861 | Final | |
| 2002-08-15finaled | T02EL01687City permit record | ELECTELECTRIC:RECONNECT (APA) | Final | |
| 2000-07-26 | T00AN00558City permit record | ADDRNEW | Issued | |
| 2000-07-26 | T00AN00559City permit record | ADDRNEW | Issued | |
| 1998-09-29expired 1999-05-17 | T98BU02397City permit record | Addition / alterationADDITION:POSTS FOR SIGN | Expired |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (6)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2018-03-19 | T18DV01451Code enforcement case | Code enforcement case | Complian |
| 2015-07-06 | T15DV04909Code enforcement case | Refuse | Noverify |
| 2015-02-03 | T15DV00653Code enforcement case | Code enforcement case | Complian |
| 2002-10-04 | T02VL02021Code enforcement case | Sign | Complian |
| 2002-09-13 | T02VL01828Code enforcement case | Fire | Closed |
| 2000-03-28 | T00VL00381Code enforcement case | Sign | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 10711146F — 24 permits on file from 1998 to 2025 (5 fence / wall, 3 right-of-way small wireless, 3 sign, 2 commercial building) and 6 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
