Electrical permit history — 220 E Fort Lowell Rd

220 E Fort Lowell Rd, Tucson — built 1948, with 12 permits on record. Review electrical, HVAC and remodel history with links to official records.

Multifamily property

220 E Fort Lowell Rd

Built 1948 — 1940s multifamily stock · last permitted panel/service work 1997 (finaled)

Parcel
107110650
Built
1948 (county record)
Jurisdiction
Tucson
Zoning
C-2
Assessor use
Apartments 5 - 24 Units 1 Story
Parcel size
0.65 acres
Building area
7,232 sq ft (assessor record)
Sewer
Connection on file (2015) (county sewer connection records)
Flood zone
AE — Special Flood Hazard Area (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)
Service on record
City records show the 1997 permit was finalized; the permit description states “ELECTRIC UPGRADE:100 AMP (POOL HOUSE)” — an increase in capacity as described, not a confirmed installed rating.

See the property

County aerial photograph centered on 220 E Fort Lowell Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionGetting onLast permitted 1997 (29 years ago). Contractor of record: E S C ELECTRIC INC ,. The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. T97EL00569 — ELECTRIC UPGRADE:100 AMP (POOL HOUSE)
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2017 combo permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 1997. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Recorded sales (5)

Recorded transfers from the Pima County Assessor — 5 of 5
DatePriceType
2025-01-24$925,000Warranty Deed
2019-07-30$470,000Warranty Deed
2009-09-28$450,000Warranty Deed
2005-08-01$625,000Warranty Deed
2002-06-14$375,000Warranty Deed

Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.

Most recent permit on record for this parcel: 2019-09-12 (T19CM06664) — GAS RECONNECT.

Permit history (12)

Permit history for this parcel — 8 of 12 records
DateRecordWhatStatusValue
2019-09-12finaledT19CM06664City permit recordCOMBOGAS RECONNECTFinal
2019-06-04finaledT19RW03136City permit recordROWTEP WILL BE REPLACING OH SERVICEFinal
2019-04-26finaledT19CM03010City permit recordCOMBORE-ATTACH EXISTING ELECTRICAL SERVICE FOR UNITS 1- 6Final
2019-04-26finaledT19CM03011City permit recordCOMBORE-ATTACH EXISTING ELECTRICAL SERVICE FOR UNITS 7- 11Final
2017-03-28finaledT17CM02390City permit recordCOMBO(T16DV08257) FIRE DAMAGE REPAIRFinal
2017-03-28finaledT17OT00329City permit recordFLOODPLNRepair Fire DamageFinal
2014-12-01finaledT14EX01224City permit recordEXCAVPLACE ANCHOR AT SOUTHWEST CORNER OF ESTRELLA AVE AND FORT LOWELL RD. PROJECT # E11459 (002B)Final
2009-11-02finaledT09PL01800City permit recordPLUMBGAS LINE REPAIRS & REPIPEFinal
Show 4 older records
Permit history for this parcel — remaining 4 records
DateRecordWhatStatusValue
1998-05-22P98AN01234City permit recordADDRNEWIssued
1997-12-05finaledT97CM03972City permit recordCOMBOADDITON:GARAGEC of o
1997-05-09finaledT97CM01206City permit recordAddition / alterationADDITION:CARPORTS & PATIO WALLFinal
1997-05-09finaledT97EL00569City permit recordPool / spaELECTRIC UPGRADE:100 AMP (POOL HOUSE)Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (5)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 5 of 5 records
DateRecordWhatStatus
2016-12-07T16DV08257Code enforcement caseFireComplian
2016-09-30T16DV06778Code enforcement caseRefuseCancel
2013-10-07T13DV07470Code enforcement caseGraffitiNoverify
2013-07-23T13DV05274Code enforcement caseCode enforcement caseComplian
2007-04-05T07DV03106Code enforcement caseRefuseCancel

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 107110650 — 12 permits on file from 1997 to 2019 (5 combo, 1 row, 1 floodpln, 1 excav) and 5 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.