Electrical permit history — 3332 N Romero Rd
3332 N Romero Rd, Tucson — built 1952, with 141 permits on record. Review electrical, HVAC and remodel history with links to official records.
Electrical Property Screening Report · Manufactured home
3332 N Romero Rd
A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.
Verify parcel data at official source ↗
Built 1952 — manufactured home · last permitted panel/service work 2018 (finaled); a newer 2019 permit is expired without a final · HVAC 2001 (finaled)
Permanent link: Electrical permit history for 3332 N Romero Rd (aztucsonelectricalsolutions.com/property/106120700/3332-n-romero-rd-tucson-az-85705) · Public records last checked 2026-08-20
Is it time to upgrade?
- Electrical service & panelFinaled permit foundA newer 2019 permit for the same system is recorded as “Expired” — The permit expired without a confirmed final status. The permit description states “ELECTRIC UPGRADE UP TO 200 AMPS”. Last permitted 2018 (8 years ago). City inspection record: ELECTRIC - FINAL approved 2018-06-25. Contractor of record: R P M ELECTRIC. The permit describes an increase in capacity, which is the single best sign the electrical has actually been brought forward. T18CM02887 — MH UPGRADE TO 200 AMPS
- Heating & coolingLikely dueLast permitted 2001 (25 years ago). City inspection record: ELECTRIC - FINAL approved 2001-05-01. Contractor of record: B A ELECTRIC ,. Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T01EL01025 — REPLACE:WIRING TO A/C UNIT (APA)
- Water heaterPermitted — completion not confirmedA 2002 permit specifies this work (the permit description states “WATER HEATER:NEW”), but the available record does not show a final inspection. The permit expired without a confirmed final status. Official status: Expired. T02PL01004 — WATER HEATER:NEW
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system.
- Plumbing work on recordNot in this windowNothing in the permit records we read for this parcel that names this system. Unremarkable — plenty of buildings never need a permitted plumbing repair.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
A finaled 2018 panel/service permit is on record for this parcel, which makes it unlikely the original 60–100 A equipment is still in place. That is a permit record, not an inspection — verify the installed rating and the panel brand on site before sizing anything new. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Bonding and grounding are the common finding on older units — the frame must be bonded, and the neutral and ground have to stay separated downstream of the service disconnect at the pedestal.
- Worth confirming
There is an electrical reconnect permit from 2025. The service was disconnected at some point and brought back — usually after a vacancy, a utility disconnect, or work that required the power off. Worth knowing what prompted it.
- Routine
Adding an EV charger, a mini-split, or a casita usually means looking at the pedestal service and feeder capacity rather than the panel inside the home.
What to check at the panel
Everything above is read off public records. These are the things only someone standing at the panel can settle, and they take about a minute. Check them against the rating the permit above describes rather than against the era — the permit is the better evidence, and neither one is an inspection.
- The rating on the main breaker at the service pedestal, not the panel inside the home — the pedestal is the service.
- The condition of the feeder running from the pedestal to the home, and its rating. Undersizing and corrosion show up here first.
- Whether the frame is bonded, and whether neutral and ground are separated downstream of the pedestal disconnect. This is the most common finding on older units.
- Whether the water heater, dryer and range are gas or electric — no public record carries fuel type, and it is the single biggest variable in what the service can still take.
With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work.
See the property
Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: FEMA flood zone X — minimal flood hazard, not a Special Flood Hazard Area. FIRM panel 04019C1669L, effective 2011-06-16. Open this property on FEMA’s official flood map ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 106120700 ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 106120700
- Year constructed
- 1952 (county record)
- Permitting authority
- Tucson
- Zoning
- MH-1
- Sewer
- Connection on file (1953, 1983) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Service on record
- City records show the 2018 permit was finalized; the permit description states “MH UPGRADE TO 200 AMPS” — an increase in capacity as described, not a confirmed installed rating.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What this means for work here
Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What that reading rests on. The issuing offices hold 141 building permits for this parcel dated between 1997 and 2026. By category the work is elect (31), mh (25) and electrical reconnect (16). 78 of them carry a final inspection; the other 63 were issued, expired or are still open, which is not the same as work completed. There are 22 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
Code enforcement cases (22): 2026 CE-VIO0826-03227 · 2026 CE-VIO0226-00813 · 2018 T18DV00555 · 2017 T17DV04178 · 2017 T17DV03352 · 2014 T14DV00081 · 2009 T09DV04469 · 2008 T08DV09845 · 2008 T08DV03045 · 2008 T08DV00009 · 2007 T07DV06552 · 2005 T05VL00995 · 2004 T04VL00244 · 2004 T04VL00159 · 2003 T03VL00577 · 2001 T01VL02130 · 2001 T01VL01051 · 2000 T00VL00282 · 2000 T00VL00189 · 1999 T99VL01851 · 1998 T98VL01027 · 1998 T98VL01016
City permit record (141): 2026 TC-COM-0726-01045 · 2025 SP-NRP-0225-00089 · 2025 SP-NRP-0125-00051 · 2024 TC-RES-0424-02340 · 2023 TC-RES-0423-04576 · 2021 T21CM09801 · 2021 T21CM07600 · 2020 T20CM07088 · 2020 T20CM05226 · 2019 T19CM05517 · 2019 T19CM03659 · 2019 T19CM03198 · 2019 T19CM02966 · 2019 T19CM02965 · 2019 T19CM02377 · 2019 T19CM02071 · 2019 T19CM01775 · 2019 T19CM01057 · 2019 T19CM00904 · 2018 T18CM10025 · 2018 T18MH00186 · 2018 T18MH00187 · 2018 T18MH00188 · 2018 T18CM09097 · 2018 T18MH00163 · 2018 T18CM07829 · 2018 T18MH00148 · 2018 T18CM07409 · 2018 T18MH00136 · 2018 T18MH00113 · and 111 older — search the parcel at the office below
Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 106120700. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All mobile-home parks · Commercial property in 85705 · Commercial & industrial reports · Homes in 85705 · Permit data by neighborhood
Planning work at this home?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
What the flood note is not. The flood zone shown is FEMA’s National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.
How this report was built
This is a reading of public records for parcel 106120700 — 141 permits on file from 1997 to 2026 (40 combo, 31 elect, 25 mh, 16 electrical reconnect) and 22 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-20; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
