Electrical permit history — 3735 N Romero Rd

3735 N Romero Rd, Tucson — built 1977, with 23 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

3735 N Romero Rd

Built 1977 — 1970s commercial stock · 23 permits on record; no permitted panel/service or HVAC work among them

Parcel
10610013B
Built
1977 (county record)
Jurisdiction
Tucson
Zoning
I-1
Assessor use
Warehousing
Parcel size
19.41 acres
Building area
106,852 sq ft (assessor record)
Sewer
Connection on file (1965, 1972, 1993) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)
Historic preservation
Not on file (City of Tucson HP layers)

See the property

County aerial photograph centered on 3735 N Romero Rd, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2015 combo permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2015 combo permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyLikely dueA newer 2011 permit for the same system is recorded as “Expired” — The permit expired without a confirmed final status. The permit description states “ADD 2 FIRE SPRINKLER HEADS.”. Last permitted 2006 (20 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T06BU01798 — FIRE SPRINKLER:ADD 14
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

Most recent permit on record for this parcel: 2025-10-15 (TR-UTL-1025-01801) — Renew for 90 days as of 02/15/26 new expiration 05/16/26 Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber.

Permit history (23)

Permit history for this parcel — 8 of 23 records
DateRecordWhatStatusValue
2025-10-15finaledTR-UTL-1025-01801City permit recordPool / spaRenew for 90 days as of 02/15/26 new expiration 05/16/26 Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiberComplete
2025-10-09TR-UTL-1025-01766City permit recordPool / spaTie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber. Place 300' of new strand over 2 spans. Lash 300' of 288ct fiber. Place 1505' of new strand over 8 spans. Lash 1505' of 288ct fiber. Place 535' of new strand over 3 spans. Lash 535' of 288ct fiber. Place 100' of new strand over 1 spans. Lash 100' of 288ct fiber. Place 540' of new strand over 3 spans. Lash 540' of 288ct fiber. Place 105' of new strand over 1 spans. Lash 105' of 288ct fiber. Place 410' of new strand over 3 spans. Lash 410' of 288ct fiber. Place 125' of new strand over 1 spans. Lash 125' of 288ct fiber. Place 760' of new strand over 4 spans. Lash 760' of 288ct fiber. Place 340' of new strand over 2 spans. Lash 340' of 288ct fiber.Void
2021-11-04finaledT21RW04923City permit recordROWWater Valve Box Warranty Repair on Romero between Prince and Price PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 5. MAINTAIN PEDESTRIAN ACCESS 6. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813Final
2021-01-15finaledT21RW00215City permit recordPool / spaINSTALLATION OF 1,560 FT OF NEW STRAND AND FIBER FOR FIRST DIGITAL TELECOM. VALID ONLY WITHIN CITY OF TUCSON JURISDICTION. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS.Final
2020-12-04finaledT20RW06398City permit recordROWWORK ACROSS N ROMERO RD AND ON THE SOUTHBOUND SHOULDER, NORTH OF W PRINCE RD. TRENCH/BORE 336 FT AND PLACE 2" PVC CONDUIT FOR FIRST DIGITAL TELECOMFinal
2020-07-29finaledT20FO00381City permit recordFIREOPERHAZARDOUS MATERIALFinal
2020-07-10finaledT20FO00356City permit recordFIREOPERLP STORAGE AND USEFinal
2020-07-10finaledT20FO00357City permit recordFIREOPERHOT WORK OPERATIONSFinal
Show 15 older records
Permit history for this parcel — remaining 15 records
DateRecordWhatStatusValue
2020-07-10finaledT20FO00358City permit recordFIREOPERINDUSTRIAL OVENSFinal
2020-07-10finaledT20FO00359City permit recordFIREOPERSPRAYING AND DIPPING OPERATIONSFinal
2016-10-03finaledT16RW01829City permit recordROWDrill a soil boring to 100 feet below ground surface on the west shoulder of Romero Road in front of 3735 N. Romero Road. The well location presented in accompanying Figure 2 is labeled Option #1 SJ-MW-4. If groundwater is encountered a 4-inch diameter well will be completed to 100 feet (see accompanying Figure 3). A traffic-rated, flush-mounted well vault will be installed at the surface to protect the well. Work is projected to take 3 to 4 days total. Areas will be cleared for underground utilities.Final
2015-10-19finaledT15CM07235City permit recordCOMBOT15DV06074 FIRE DAMAGE REPAIRFinal
2015-10-19T15CM07237City permit recordCOMBOFUP- T15CM07235Withdrwn
2015-10-19finaledT15OT01409City permit recordFLOODPLNFUP- T15CM07235Final
2015-02-12finaledT15EX00110City permit recordEXCAVBEGINING ON THE EASTSIDE OF N ROMERO RD SOUTH OF W SMOOT DR RUN AERIALLY APPR 487' THEN RISER DOWN TEP POLE AND TRENCH 37' THRU DIRT SOUTH AND TURN WEST AND BORE/TRENCH 64' OF ROMERO RD *****CHECK FOR STORM DRAINS AND MAINTAIN A MINIMUM 2 FOOT SEPERATION*******PLEASE CHECK WITH PIMA COUNTY WASTEWATER FOR CONFLICTS PRIOR TO BORING******Final
2015-02-12finaledT15TC00547City permit recordBARRICADBEGINING ON THE EASTSIDE OF N ROMERO RD SOUTH OF W SMOOT DR RUN AERIALLY APPR 487' THEN RISER DOWN TEP POLE AND TRENCH 37' THRU DIRT SOUTH AND TURN WEST AND BORE/TRENCH 64' OF ROMERO RDFinal
2012-04-03expired 2012-10-09T12BU00437City permit recordSPKLRAdd 2 fire sprinklersClosed
2011-05-04expired 2012-11-07T11BU00595City permit recordSPKLRADD 2 FIRE SPRINKLER HEADS.Expired
2006-07-19finaledT06BU01798City permit recordSPKLRFIRE SPRINKLER:ADD 14Final
2006-04-07expired 2006-10-18T06CM02018City permit recordCOMBOSITE FOR MODULAR BLDGExpired
2006-03-10expired 2006-12-31T06OT00707City permit recordREGPLANTRIGISTERED PLANTClosed
2005-10-20finaledT05CM05357City permit recordCOMBOADDT: STORAGE ROOMC of o
2005-02-22T05CM00788City permit recordAddition / alterationADDITION:STORAGEWithdrwn

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Code enforcement (2)

Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.

Code enforcement history for this parcel — 2 of 2 records
DateRecordWhatStatus
2015-08-19T15DV06074Code enforcement caseFireComplian
2008-09-26T08FR03158Code enforcement caseCode enforcement caseField

Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 10610013B — 23 permits on file from 2005 to 2025 (5 fireoper, 4 combo, 3 pool / spa, 3 row) and 2 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.