Electrical permit history — 3707 N Oracle Rd
3707 N Oracle Rd, Tucson — built 1984, with 18 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
3707 N Oracle Rd
Built 1984 — 1980s commercial stock · 18 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 3707 N Oracle Rd (aztucsonelectricalsolutions.com/property/10605019b/3707-n-oracle-rd-tucson-az-85705) · Public records last checked 2026-08-16
- Parcel
- 10605019B
- Built
- 1984 (county record)
- Jurisdiction
- Tucson
- Zoning
- C-2
- Assessor use
- Restaurant Fast Food
- Parcel size
- 0.81 acres
- Building area
- 2,297 sq ft (assessor record)
- Sewer
- Connection on file (2022) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 fire operational permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2022 (4 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T22FC00274 — Automatic Fire Extingshing Sys - Installation of Ansul Fire Suppression Systems for kitchen hoods.; Commercial Cooking Suppression - New System: 3; Additional Plan Reviews: 1
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Food service carries heavy, cycling kitchen loads and exhaust interlocks. Capacity and existing panel space are the first things to verify on any remodel.
- Worth confirming
A pool or spa was permitted in 2021. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
Most recent permit on record for this parcel: 2026-04-08 (TR-UTL-0426-00644) — PRJ313723-1: Cox to trench 27' & bore 90' to install new CATV conduit for system tie..
Permit history (18)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-04-08finaled | TR-UTL-0426-00644City permit record | Right-of-Way (ROW) - UtilityPRJ313723-1: Cox to trench 27' & bore 90' to install new CATV conduit for system tie. | Complete | |
| 2023-10-17expired 2023-11-16 | TC-CFO-1023-00197City permit record | Certificate of OccupancyThis project T21CM06229 is expired. Please sign into your TDC account and Request Renewal/Extension. Once extension request is submitted and is in completed re- request TCO. Two conditions must be satisfied prior to TCO. We haven't received Water Sterilization Report and County Health Inspection Document. Also this project T21CM06229 is expired. Sign into your TDC account and Request Renewal/Extension and submit Water Sterilization Report and County Health Inspection Document for review. Once extension request is submitted and is in completed status and both conditions have bee satisfied re- request TCO. New Carl's Jr restaurant to replace the existing Carl's Jr that had a fire and is being demolished. | Denied | |
| 2023-06-06expired 2023-12-03 | TS-PRM-0623-00346City permit record | Sign - PermanentSouth Elevation Canopy (over drive - thru) | Issued | |
| 2023-02-21finaled | TF-FOP-0223-00549City permit record | Fire OperationalOriginal restaurant had a fire. We demolished the building and are building a brand new restaurant on the same site to replace the old one. | Complete | |
| 2023-01-06expired 2023-12-23 | TF-FCP-0123-00268City permit record | Fire ConstructionWITHDRAWN PER PATRICIA SHELTON NO ALARM - Install fire alarm system in Carl's Jr. | Withdrawn | |
| 2022-11-28expired 2023-09-20 | TC-COM-1122-00180City permit record | Commercial BuildingWe are applying to add awnings to new build construction for Carls JR's Building Permit T21CM06229. | Issued | |
| 2022-06-23finaled | T22OT00446City permit record | Sign - Permanent5-ILLUM SIGN FOE NEW FAST FOOD | Complete | |
| 2022-04-12finaled | T22FC00274City permit record | Addition / alterationAutomatic Fire Extingshing Sys - Installation of Ansul Fire Suppression Systems for kitchen hoods.; Commercial Cooking Suppression - New System: 3; Additional Plan Reviews: 1 | Complete |
Show 10 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2021-10-26finaled | DP21-0289City permit record | New constructionSite - Carls Jr Restaurant Rebuild. New building to replace former fire-damaged and demolished build.. | Complete | |
| 2021-07-30finaled | T21CM06229City permit record | Commercial BuildingNew Carl's Jr restaurant to replace the existing Carl's Jr that had a fire and is being demolished. | Complete | |
| 2021-07-01finaled | T21RW03199City permit record | Pool / spaW/O@ 4283400 - CREWS WILL BE WORKING ON EDGE OF ROAD TO TEMPORARY ABANDON GAS LINE @ 20 LF. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PLACE “BUSINESS ACCESS” SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 4. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 5. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 6. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 7. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 9. MAINTAIN PEDESTRIAN ACCESS | Final | |
| 2021-06-15expired 2021-12-12 | T21BU00310City permit record | Fence / wallDEMO AND REMOVE 6200 SQ FT BLDG IN ITS ENTIRETY WHICH INCLUDES SLAB, FOOTINGS, INTERIOR AND EXTERIOR WALLS, REMAINING ROOF THAT WAS DAMAGED, ALL KITCHEN EQUIPMENT, 2700 SQ FT DRIVE THRU AND CURB | Issued | |
| 2019-10-25finaled | T19RW06513City permit record | ROWDIG UP SEWER MAIN TO GET ROCK OUT OF LINE WORK IS ACTUALLY ON THURBER RD; 10' IN ROAD/ 30'+/- TOTAL LINEAR FEET FOR JOB CONTRACTOR SHALL PLATE TRENCH & REMOVE TRAFFIC CONTROL @ NIGHT | Final | |
| 2017-06-26expired 2017-09-09 | T17RW02774City permit record | ROWConterra is proposing to place 4,567' of Aerial Fiber Optic Cable and Strand on existing TEP/ Century Link Poles NOTE: Finalizing of an extension to TRE 2013-023, the Conterra-City agreement for placement of fiber-optic lines in City rights-of-way. | Expired | |
| 2017-03-03finaled | T17FO00180City permit record | FIREOPERCARLS JRS - PLACES OF ASSEMBLY TS - MA24 | Final | |
| 2011-06-14finaled | T11OT01176City permit record | SIGN19690 | Final | |
| 2008-04-29expired 2010-07-03 | T08OT01031City permit record | SIGN14894/WORK NOT TO BE DONE | Withdrwn | |
| 2004-05-13expired 2004-07-12 | T04EX00431City permit record | EXCAVEXCAV:10 LF SIDEWALK REPLACEMENT | Closed |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (8)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2021-05-26 | T21DV03145Code enforcement case | Fire | Complian |
| 2020-10-11 | T20DV06810Code enforcement case | Fire | Complian |
| 2011-04-12 | T11DV02400Code enforcement case | Sign | Noverify |
| 2010-10-25finaled | T10FR02213Code enforcement case | Fire | Complete |
| 2010-10-21finaled | T10FR02198Code enforcement case | Code enforcement case | Complete |
| 2009-12-01 | T09FR03670Code enforcement case | Electrical | Field |
| 2007-04-13finaled | T07FR00715Code enforcement case | Fire | Complete |
| 2004-09-29finaled | T04FR00414Code enforcement case | Code enforcement case | Complete |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 10605019B — 18 permits on file from 2004 to 2026 (2 sign - permanent, 2 commercial building, 2 row, 2 sign) and 8 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
