Electrical permit history — 4280 N Oracle Rd
4280 N Oracle Rd, Tucson — built 2007, with 63 permits on record. Review electrical, HVAC and remodel history with links to official records.
Electrical Property Screening Report · Commercial property
4280 N Oracle Rd
A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.
Verify parcel data at official source ↗
Built 2007 — 2000s commercial stock · HVAC 2026 (permitted, completion not confirmed)
Permanent link: Electrical permit history for 4280 N Oracle Rd (aztucsonelectricalsolutions.com/property/105110660/4280-n-oracle-rd-tucson-az-85705) · Public records last checked 2026-09-22
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 state licensed facility operational fire permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service work shows in the record we read — unremarkable for a building of this age, whose service was sized to modern code at construction. The live question is spare capacity for new loads (EV charging, kitchen or process equipment), not the age of the gear. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalPermitted — completion not confirmedA 2026 permit specifies this work (the permit description states “**Scope of Work – Mini-Split Heat Pump Replacement** This project consists of the removal and replacement of an existing mini-split heat pump system with a new like-for-like mini-split heat pump system of equivalent capacity and function. Work includes: * Removal and proper disposal of the existing indoor air handler and outdoor condensing unit. * Installation of a new like-for-like mini-split heat pump system in the existing locations. * Reuse of the existing line set if it is determined to be compatible and in acceptable condition, or replacement if required by the manufacturer's specifications. * Installation of new refrigerant, condensate, and electrical connections as required. * Pressure testing, evacuation of the refrigerant piping, charging the system per manufacturer specifications, and verifying proper operation. * All work will be performed in accordance with the current manufacturer's installation instructions, the City of Tucson requirements, and all applicable International Mechanical Code (IMC), International Residential Code (IRC), International Energy Conservation Code (IECC), and National Electrical Code (NEC) requirements. No changes are being made to the building layout or the intended use of the space. This is a like-for-like replacement of the existing mini-split heat pump system.”), but the available record does not show a final inspection. The work was permitted, but final completion is not confirmed. Official status: Issued. TC-COM-0726-01144 — **Scope of Work – Mini-Split Heat Pump Replacement** This project consists of the removal and replacement of an existing mini-split heat pump system with a new like-for-like mini-split heat pump system of equivalent capacity and function. Work includes: * Removal and proper disposal of the existing indoor air handler and outdoor condensing unit. * Installation of a new like-for-like mini-split heat pump system in the existing locations. * Reuse of the existing line set if it is determined to be compatible and in acceptable condition, or replacement if required by the manufacturer's specifications. * Installation of new refrigerant, condensate, and electrical connections as required. * Pressure testing, evacuation of the refrigerant piping, charging the system per manufacturer specifications, and verifying proper operation. * All work will be performed in accordance with the current manufacturer's installation instructions, the City of Tucson requirements, and all applicable International Mechanical Code (IMC), International Residential Code (IRC), International Energy Conservation Code (IECC), and National Electrical Code (NEC) requirements. No changes are being made to the building layout or the intended use of the space. This is a like-for-like replacement of the existing mini-split heat pump system.
- Fire alarm & life safetyFinaled permit foundLast permitted 2023 (3 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. TF-FCP-0423-00576 — New Fire Suppression System Install for Kitchen Hood
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
A capacity and condition review is the usual starting point before any tenant improvement or added load. The permit record does not confirm this; an on-site inspection is required.
- Routine
A trade permit was pulled in 2016. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.
Solar and energy potential
- Roof footprint
- ≈ 11,002 sq ft (county building-footprint layer)
- Usable for solar, planning estimate
- ≈ 7,700 sq ft (~70% after setbacks, rooftop equipment and access paths)
- Array that could fit
- on the order of 85 kW — roughly 210 panels (low-tilt ballasted rows, 400 W class modules)
- Estimated annual production
- ≈ 140,000 kWh (PVWatts, Tucson sun, low-tilt south)
- Energy-charge offset at TEP commercial rates
- $11,000–$18,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)
Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.
TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “Ina Rd and Thornydale Rd”, is about 4.6 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.
Get a commercial solar & switchgear analysis
See the property
Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.
Flood and drainage
The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.
- FEMA: we did not read the federal flood map for this snapshot, so no zone is shown here. That is a gap in this page, not a statement about the property. Check FEMA’s flood map for this address ↗
- Local floodplain (the City of Tucson): local floodplain mapping is not reproduced here. A property can sit outside FEMA’s zone and still be inside a locally regulated floodplain, floodway, sheet-flooding area or erosion hazard setback, so check the authority’s own map before planning work. Pima County RFCD flood hazard map for parcel 105110660 ↗ · the City of Tucson ↗
The record behind this read
- Parcel
- 105110660
- Year constructed
- 2007 (assessor record)
- Permitting authority
- Tucson
- Zoning
- OCR-2
- Property type
- Community Shop Ctr Open Air
- Building area
- 9,600 sq ft
The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What this means for work here
Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.
The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.
What that reading rests on. The issuing offices hold 63 building permits for this parcel dated between 2007 and 2026. By category the work is addition / alteration (14), permanent sign (14), fire automatic extinguishing system (12) and state licensed facility operational fire (9). 53 of them carry a final inspection; the other 10 were issued, expired or are still open, which is not the same as work completed. There are 4 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.
Go straight to the records
Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.
Commercial building (1): 2026 TC-COM-0726-01144
Code enforcement cases (4): 2025 CE-VIO1025-04761 · 2015 T15DV00135 · 2010 T10DV00894 · 2009 T09DV06859
City permit record (61): 2025 TF-FOP-0725-00968 · 2024 TF-FOP-0724-00827 · 2024 TS-TMP-0724-00020 · 2023 TF-FOP-0823-01355 · 2023 TF-FCP-0423-00576 · 2022 T22OT00416 · 2022 T22CM05790 · 2022 T22FO00576 · 2021 T21SA00308 · 2021 T21FO00207 · 2021 T20FO00686 · 2021 T21FC00059 · 2021 T21OT00069 · 2021 T21CM00174 · 2019 T19FO01004 · 2018 T18FO00791 · 2017 T17FO00590 · 2017 T17CM01126 · 2017 T17FO00035 · 2017 T17FC00014 · 2017 T17FC00003 · 2016 T16OT00937 · 2016 T16BU00735 · 2016 T15CM07120 · 2013 T13OT01516 · 2013 T13OT01517 · 2012 T12OT00058 · 2011 T11CM01642 · 2011 T11OT01147 · 2011 T11OT00757 · and 31 older — search the parcel at the office below
Certificate of occupancy (1): 2022 T22CM04953
Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 105110660. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.
In the public record: All commercial property · Commercial property in 85705 · Commercial & industrial reports · Homes in 85705 · Permit data by neighborhood
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, sent once. No list.One email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list.
What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.
How this property compares nearby
Properties on N ORACLE RD hold 4,598 City permits on record, 1,059 of them since 2022.
Computed from the same public records as this report — counts and years, not an appraisal.
Complete permit record (67 entries)
Every permit and case we hold for this parcel, newest first. Each number links to the official file.
| Year | Number | Type | Status |
|---|---|---|---|
| 2026 | TC-COM-0726-01144 | Commercial Trade Permit | Issued |
| 2025 | CE-VIO1025-04761 | Refuse | Closed - Resolved |
| 2025 | TF-FOP-0725-00968 | State Licensed Facility Operational Fire Permit | Complete |
| 2024 | TF-FOP-0724-00827 | State Licensed Facility Operational Fire Permit | Complete |
| 2024 | TS-TMP-0724-00020 | Temporary Sign Compliance | Issued |
| 2023 | TF-FOP-0823-01355 | State Licensed Facility Operational Fire Permit | Complete |
| 2023 | TF-FCP-0423-00576 | Fire Automatic Extinguishing System Permit | Complete |
| 2022 | T22CM04953 | Commercial Addition/Alteration Permit | Complete |
| 2022 | T22OT00416 | Permanent Sign Permit | Expired |
| 2022 | T22CM05790 | Commercial Trade Permit | Expired |
| 2022 | T22FO00576 | State Licensed Facility Operational Fire Permit | Complete |
| 2021 | T21SA00308 | Zoning Compliance | Complete |
| 2021 | T21FO00207 | State Licensed Facility Operational Fire Permit | Complete |
| 2021 | T20FO00686 | State Licensed Facility Operational Fire Permit | Complete |
| 2021 | T21FC00059 | Fire Automatic Extinguishing System Permit | Complete |
| 2021 | T21OT00069 | Permanent Sign Permit | Complete |
| 2021 | T21CM00174 | Commercial Addition/Alteration Permit | Complete |
| 2019 | T19FO01004 | State Licensed Facility Operational Fire Permit | Complete |
| 2018 | T18FO00791 | State Licensed Facility Operational Fire Permit | Complete |
| 2017 | T17FO00590 | State Licensed Facility Operational Fire Permit | Complete |
| 2017 | T17CM01126 | Commercial Addition/Alteration Permit | Complete |
| 2017 | T17FO00035 | General Operational Fire Permit | Complete |
| 2017 | T17FC00014 | Fire Automatic Extinguishing System Permit | Complete |
| 2017 | T17FC00003 | Fire Automatic Extinguishing System Permit | Complete |
| 2016 | T16OT00937 | Permanent Sign Permit | Complete |
| 2016 | T16BU00735 | Commercial Trade Permit | Complete |
| 2016 | T15CM07120 | Commercial Addition/Alteration Permit | Complete |
| 2015 | T15DV00135 | SIGN VIOLATION | COMPLIAN |
| 2013 | T13OT01516 | Permanent Sign Permit | Complete |
| 2013 | T13OT01517 | Annual Portable Sign Compliance | Canceled |
| 2012 | T12OT00058 | Permanent Sign Permit | Complete |
| 2011 | T11CM01642 | Commercial Addition/Alteration Permit | Complete |
| 2011 | T11OT01147 | Permanent Sign Permit | Canceled |
| 2011 | T11OT00757 | Commercial Addition/Alteration Permit | Withdrawn |
| 2011 | T11BU00186 | Fire Automatic Extinguishing System Permit | Complete |
| 2011 | T11BU00161 | Fire Automatic Extinguishing System Permit | Complete |
| 2010 | T10CM03024 | Commercial Addition/Alteration Permit | Complete |
| 2010 | T10CM03025 | Commercial Addition/Alteration Permit | Complete |
| 2010 | T10DV00894 | SIGN VIOLATION | COMPLIAN |
| 2010 | T10OT00389 | Annual Portable Sign Compliance | Complete |
| 2009 | T09DV06859 | SIGN VIOLATION | NOVERIFY |
| 2009 | T09OT02535 | Permanent Sign Permit | Complete |
| 2009 | T09OT02536 | Annual Portable Sign Compliance | Complete |
| 2009 | T09OT02403 | Annual Portable Sign Compliance | Complete |
| 2009 | T09OT01280 | Permanent Sign Permit | Complete |
| 2009 | T09OT01123 | Permanent Sign Permit | Complete |
| 2009 | T09OT01147 | Permanent Sign Permit | Complete |
| 2009 | T09OT01137 | Permanent Sign Permit | Complete |
| 2009 | T09OT01122 | Annual Portable Sign Compliance | Complete |
| 2009 | T09BU00618 | Fire Automatic Extinguishing System Permit | Canceled |
| 2009 | T09CM00544 | Commercial Addition/Alteration Permit | Complete |
| 2009 | T09CM00542 | Commercial Addition/Alteration Permit | Complete |
| 2009 | T09BU00403 | Fire Automatic Extinguishing System Permit | Complete |
| 2009 | T09BU00441 | Commercial Trade Permit | Complete |
| 2009 | T08CM03822 | Commercial Addition/Alteration Permit | Complete |
| 2009 | T09OT00385 | Permanent Sign Permit | Complete |
| 2009 | T09OT00266 | Permanent Sign Permit | Complete |
| 2009 | T09OT00303 | Annual Portable Sign Compliance | Complete |
| 2009 | T09OT00304 | Permanent Sign Permit | Withdrawn |
| 2009 | T09BU00060 | Fire Automatic Extinguishing System Permit | Complete |
| 2008 | T08CM03403 | Commercial Addition/Alteration Permit | Complete |
| 2008 | T08BU01726 | Fire Automatic Extinguishing System Permit | Complete |
| 2008 | T08CM02957 | Commercial Addition/Alteration Permit | Canceled |
| 2008 | T08CM02676 | Commercial Addition/Alteration Permit | Complete |
| 2007 | T07BU01282 | Fire Automatic Extinguishing System Permit | Complete |
| 2007 | T07BU00992 | Fire Automatic Extinguishing System Permit | Complete |
| 2007 | T06CM06082 | Commercial New Building Permit | Complete |
prints this report — permits, comparisons and sources — as a clean document
How this report was built
This is a reading of public records for parcel 105110660 — 63 City permits on file from 2007 to 2026 and 4 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.
The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.