Electrical permit history — 698 E Wetmore Rd

698 E Wetmore Rd, Tucson — built 1984, with 95 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

698 E Wetmore Rd

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Built 1984 — 1980s commercial stock · 95 permits on record; no permitted panel/service or HVAC work among them

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 state licensed facility operational fire permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service or distribution work shows in the record we read. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2026 state licensed facility operational fire permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyFinaled permit foundLast permitted 2015 (11 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T15BU00847 — SPRINKLERS
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitized. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    A pool or spa was permitted in 2005. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.

  • Routine

    Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.

  • Routine

    A trade permit was pulled in 2018. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 36,555 sq ft (county building-footprint layer, 2 structures)
Usable for solar, planning estimate
≈ 25,600 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 280 kW — roughly 700 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 460,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$37,000–$60,000 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “El Con Mall - Reid Park Area”, is about 4.8 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
10510062G
Year constructed
1984 (assessor record)
Permitting authority
Tucson
Zoning
C-1
Property type
Office Building 2 Story
Building area
32,207 sq ft

The building area above comes from the Pima County Assessor’s record, as we read it on 28 Jan 2026. Each other row names its own source.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 95 building permits for this parcel dated between 1998 and 2026. By category the work is addition / alteration (29), permanent sign (25), fire automatic extinguishing system (18) and state licensed facility operational fire (17). 80 of them carry a final inspection; the other 15 were issued, expired or are still open, which is not the same as work completed. There are 3 code-enforcement cases recorded against the parcel, all of them closed. We do not reproduce complaint text — it routinely names people with no connection to the property.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 10510062G. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All commercial property · Commercial property in 85705 · Commercial & industrial reports · Homes in 85705 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on E WETMORE RD hold 661 City permits on record, 140 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (98 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TS-PRM-0826-00292Permanent Sign PermitIssued
2026TF-FOP-0526-00741State Licensed Facility Operational Fire PermitComplete
2026TF-FOP-0626-00838General Operational Fire PermitComplete
2025TF-FOP-0625-00812General Operational Fire PermitComplete
2025TF-FOP-0625-00811State Licensed Facility Operational Fire PermitComplete
2024TF-FOP-1024-01135State Licensed Facility Operational Fire PermitComplete
2024TF-FOP-0624-00705General Operational Fire PermitComplete
2024TF-FOP-0624-00717State Licensed Facility Operational Fire PermitComplete
2024TS-PRM-0124-00029Permanent Sign PermitIssued
2024TF-FOP-1123-01762State Licensed Facility Operational Fire PermitComplete
2023TF-FOP-1023-01596General Operational Fire PermitComplete
2023TC-COM-0223-00638Commercial Addition/Alteration PermitExpired
2022T22FO00917State Licensed Facility Operational Fire PermitComplete
2022T22FO00788General Operational Fire PermitComplete
2021T21FO00690State Licensed Facility Operational Fire PermitComplete
2021T21FO00332State Licensed Facility Operational Fire PermitComplete
2020T20FO00355State Licensed Facility Operational Fire PermitComplete
2020T20FO00131State Licensed Facility Operational Fire PermitComplete
2020T19OT01162Permanent Sign PermitComplete
2019T19FO00600State Licensed Facility Operational Fire PermitComplete
2019T19FO00066State Licensed Facility Operational Fire PermitComplete
2019T19FO00067State Licensed Facility Operational Fire PermitComplete
2018T18CM03581Commercial Trade PermitComplete
2018T18FO00101State Licensed Facility Operational Fire PermitComplete
2018T18FO00102State Licensed Facility Operational Fire PermitComplete
2017T17FC00917Fire Automatic Extinguishing System PermitComplete
2017T17CM07392Commercial Addition/Alteration PermitCanceled
2017T17FO00009State Licensed Facility Operational Fire PermitComplete
2017T17CM00237Commercial Addition/Alteration PermitWithdrawn
2016T16FO00127State Licensed Facility Operational Fire PermitComplete
2015T15BU00847Fire Automatic Extinguishing System PermitComplete
2015T15CM04888Commercial Addition/Alteration PermitComplete
2015T15DV01078SIGN VIOLATIONCOMPLIAN
2014T14OT01125Permanent Sign PermitCanceled
2014T14OT01165Permanent Sign PermitComplete
2014T14BU00950Fire Automatic Extinguishing System PermitComplete
2014T14OT00866Permanent Sign PermitComplete
2014T14BU00786Fire Automatic Extinguishing System PermitComplete
2014T14CM04166Commercial Addition/Alteration PermitComplete
2014T14CM03665Commercial Addition/Alteration PermitComplete
2014T14OT00120Permanent Sign PermitCanceled
2014T14BU00152Fire Automatic Extinguishing System PermitComplete
2014T14BU00078Fire Automatic Extinguishing System PermitComplete
2014T14CM00464Commercial Addition/Alteration PermitComplete
2013T13CM07219Commercial Addition/Alteration PermitComplete
2013T13BU01249Fire Automatic Extinguishing System PermitComplete
2013T13CM06616Commercial Addition/Alteration PermitComplete
2013T13BU00860Fire Automatic Extinguishing System PermitComplete
2013T13CM04205Commercial Addition/Alteration PermitComplete
2013T13CM00173Commercial Addition/Alteration PermitComplete
2011T11OT01909Permanent Sign PermitCanceled
2011T11CM02993Commercial Addition/Alteration PermitComplete
2010T10DV04618SIGN VIOLATIONCOMPLIAN
2010T10BU00554Fire Automatic Extinguishing System PermitComplete
2008T08BU01750Commercial Addition/Alteration PermitComplete
2008T08CM02714Commercial Addition/Alteration PermitComplete
2008T08DV06649CAR THROUGH COMMERCIAL BUILDINCOMPLIAN
2008T08CM00184Commercial Addition/Alteration PermitCanceled
2007T07OT00965Permanent Sign PermitComplete
2006T06OT01187Permanent Sign PermitComplete
2006T06OT01154Permanent Sign PermitCanceled
2006T06OT00802Permanent Sign PermitCanceled
2006T06OT00801Permanent Sign PermitComplete
2006T06OT00203Permanent Sign PermitComplete
2006T06OT00293Permanent Sign PermitComplete
2005T05OT03113Permanent Sign PermitComplete
2005T05OT03114Permanent Sign PermitComplete
2005T05OT03112Permanent Sign PermitComplete
2005T05BU02292Commercial Addition/Alteration PermitComplete
2005T05OT02374Permanent Sign PermitComplete
2005T05OT02223Permanent Sign PermitComplete
2005T05BU02126Fire Automatic Extinguishing System PermitComplete
2005T05BU01996Fire Automatic Extinguishing System PermitComplete
2005T05BU01987Fire Automatic Extinguishing System PermitComplete
2005T05OT01868Permanent Sign PermitComplete
2005T05CM02746Commercial Addition/Alteration PermitComplete
2005T05OT01383Permanent Sign PermitComplete
2005T05CM01650Commercial Addition/Alteration PermitComplete
2005T04CM05551Commercial Addition/Alteration PermitComplete
2004T04OT00326Commercial Addition/Alteration PermitWithdrawn
2004T04OT00077Permanent Sign PermitComplete
2004T03CM05732Commercial Addition/Alteration PermitComplete
2003T03BU03078Fire Automatic Extinguishing System PermitComplete
2003T03OT02134Permanent Sign PermitComplete
2003T03CM03052Commercial Addition/Alteration PermitCanceled
2003T03OT01071Permanent Sign PermitComplete
2003T03CM02858Commercial Addition/Alteration PermitComplete
2000T00BU02922Fire Automatic Extinguishing System PermitComplete
2000T00BU02923Fire Automatic Extinguishing System PermitComplete
2000T00CM04745Commercial Addition/Alteration PermitCanceled
2000T00CM04508Commercial Addition/Alteration PermitCanceled
1999T99BU01284Fire Automatic Extinguishing System PermitComplete
1999T99CM02028Commercial Addition/Alteration PermitComplete
1998T98BU02081Fire Automatic Extinguishing System PermitComplete
1998T98CM03317Commercial Addition/Alteration PermitComplete
1998T98CM02924Commercial Addition/Alteration PermitComplete
1998T98BU00431Fire Automatic Extinguishing System PermitComplete
1998T98CM00100Commercial Addition/Alteration PermitComplete

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 10510062G — 95 City permits on file from 1998 to 2026 and 3 code enforcement cases — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized. The construction year, living area on this page come from our saved copy of the Assessor’s own published data file (dated 2026-01-28). The sewer connection file and the flood map were not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-09-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.