Electrical permit history — 95 W River Rd
95 W River Rd, Tucson — built 1995, with 4 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
95 W River Rd
Built 1995 — 1990s commercial stock · last permitted panel/service work 2024 (finaled) · 1 open code case
Permanent link: Electrical permit history for 95 W River Rd (aztucsonelectricalsolutions.com/property/105097390/95-w-river-rd-tucson-az-85704) · Public records last checked 2026-08-16
- Parcel
- 105097390
- Built
- 1995 (assessor record)
- Jurisdiction
- Tucson
- Zoning
- C-2
- Assessor use
- Community Shop Ctr Open Air
- Parcel size
- 3.96 acres
- Building area
- 27,100 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
- Service on record
- City records show the 2024 permit was finalized; the permit description states “Tesla, Inc. is proposing to install 12 Tesla EV Supercharging stations and associated utility equipment in the existing parking lot REV1_On Sheets C-101 and C-111, cabinets and switchgear/utility meter have swapped locations to improve access and streamline service. - Details have also been added to Sheets E-001 and E-101 to demonstrate connections between charging posts and equipment.”.
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionCurrentLast permitted 2024 (2 years ago). City inspection record: COT - HCBU - Building Final approved 2025-10-02. Worth reading the permit itself: it names the service but does not read as an increase in capacity, so this may have been a like-for-like replacement rather than an upgrade. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service. TC-COM-0224-00287 — Tesla, Inc. is proposing to install 12 Tesla EV Supercharging stations and associated utility equipment in the existing parking lot REV1_On Sheets C-101 and C-111, cabinets and switchgear/utility meter have swapped locations to improve access and streamline service. - Details have also been added to Sheets E-001 and E-101 to demonstrate connections between charging posts and equipment.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 fire operational permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth looking at
There is an open code enforcement case on this parcel. An open case can hold up a permit, and if it touches unpermitted work the electrical scope usually has to be brought up to code as part of resolving it.
- Era-based check
Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2025-02-03 (TF-FOP-0225-00167) — Fire General Operational Permit for a buffet restaurant..
Permit history (4)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2025-02-03finaled | TF-FOP-0225-00167City permit record | Fire OperationalFire General Operational Permit for a buffet restaurant. | Complete | |
| 2024-09-24expires 2028-02-13 | TD-DEV-0924-00265City permit record | Development PackageInstalling Tesla's Supercharging Station within existing parking lot. Project will include accessible parking area, electrical equipment, transformer, and (12) charging posts. | Issued | |
| 2024-08-14finaled | TC-COM-0824-01585City permit record | Commercial BuildingInterior Remodel | Complete | |
| 2024-02-12finaled | TC-COM-0224-00287City permit record | Commercial BuildingTesla, Inc. is proposing to install 12 Tesla EV Supercharging stations and associated utility equipment in the existing parking lot REV1_On Sheets C-101 and C-111, cabinets and switchgear/utility meter have swapped locations to improve access and streamline service. - Details have also been added to Sheets E-001 and E-101 to demonstrate connections between charging posts and equipment. | Inspections complete |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (6)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2025-04-24 | CE-VIO0425-01706Code enforcement case | Refuse | Active |
| 2025-04-17 | CE-VIO0425-01593Code enforcement case | Refuse | Closed - unfounded |
| 2024-09-05 | CE-VIO0924-03585Code enforcement case | Code enforcement case | Closed - resolved |
| 2017-11-30 | T17DV06405Housing code violation | GRAFFITIrecorded before 2023 | COMPLIAN |
| 2015-06-22 | T15DV04572Housing code violation | SIGN VIOLATIONrecorded before 2023 | COMPLIAN |
| 2008-12-04 | T08DV11150Housing code violation | SIGN VIOLATIONNotice of violation issued · recorded before 2023 | COMPLIAN |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 105097390 — 4 permits on file from 2024 to 2025 (2 commercial building, 1 fire operational, 1 development package) and 6 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
