Electrical permit history — 855 W Wetmore Rd
855 W Wetmore Rd, Tucson — built 2005, with 22 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
855 W Wetmore Rd
Built 2005 — 2000s commercial stock · 22 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 855 W Wetmore Rd (aztucsonelectricalsolutions.com/property/10409015e/855-w-wetmore-rd-tucson-az-85705) · Public records last checked 2026-08-16
- Parcel
- 10409015E
- Built
- 2005 (county record)
- Jurisdiction
- Tucson
- Zoning
- C-2
- Assessor use
- Auto/Light Truck Dealership Auto Mall
- Parcel size
- 6.01 acres
- Building area
- 41,247 sq ft (assessor record)
- Sewer
- Connection on file (2011) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
- Historic preservation
- Not on file (City of Tucson HP layers)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 addition / alteration permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2025 addition / alteration permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyCurrentLast permitted 2020 (6 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T20FC00060 — Replacing existing Fire Alarms in B & A suites
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. We read the City of Tucson’s own permit file, not a recent extract of it — back to about 2006, and into the 1990s on properties with that much history. Microfiche before then was never fully digitised. Every record links to the city’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Most recent permit on record for this parcel: 2026-04-16 (TC-COM-0426-00562) — Install EV Chargers.
Permit history (22)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-04-16 | TC-COM-0426-00562City permit record | Commercial BuildingInstall EV Chargers | Needs resubmittal | |
| 2025-05-23finaled | TR-UTL-0525-00835City permit record | Right-of-Way (ROW) - UtilityP.315413 -3 : ACCESS MH 3818 (ON HADLEY ST /FAIRVIEW AVE) FOR SPLICING PAGE 1 OF SITE PLAN) | Complete | |
| 2025-05-12expired 2025-11-29 | TC-COM-0525-00971City permit record | Commercial BuildingReplace 16ft section of sewer drain pipe that is 4ft away from city main tie in. | Issued | |
| 2025-03-14finaled | TR-ROW-0325-00344City permit record | Right-of-Way (ROW)AZTEC will perform 17 utility potholes for Tucson Water between Wetmore Rd and Simons Rd. A distance of 4100 feet. | Complete | |
| 2025-03-10 | TR-ROW-0325-00328City permit record | Right-of-Way (ROW)AZTEC will perform 17 utility potholes on Fairview Rd to support a new water main design for the City of Tucson. | Void | |
| 2025-02-24finaled | TR-ROW-0225-00251City permit record | Addition / alterationWe will be performing seven (7) geotechnical borings within the roadway of Fairview Avenue from Fairview Avenue and Wetmore Road crossroads to Fairview Avenue and Prince Road crossroads, and seven (7) additional borings on Fairview Avenue from Fairview Avenue/Miracle Mile to Fairview Ave/Grant Rd for a Tucson Water waterline replacement project, for a total of 14 borings. The borings will be advanced with 7 or 8 inch hollow stem auger to a depth of approximately 10 feet below the ground surface. The borings will be backfilled with auger cuttings mixed with concrete (with concrete comprising between 20 to 50% of the soil-cement backfill). The exposed asphalt concrete at each boring location will be cleaned, wire-brushed, and patched with QPR brand asphalt cold path. (We understand the restoration of boring locations in the existing roadway as described above will be acceptable by the City of Tucson.) See site plan for details on locations of planned boreholes and traffic control plans for anticipated one-lane closures along Fairview Avenue. Legal Contract Number 212603-04 Contact: Nathan Daou | Complete | |
| 2023-01-26finaled | TR-UTL-0123-00702City permit record | Right-of-Way (ROW) - UtilityBoring 865ft of 2in conduit to side of business. | Complete | |
| 2022-09-09finaled | T22RW03274City permit record | Right-of-Way (ROW)Boring 865ft of 2in conduit to side of business.** PROOF OF NOTIFICATION IS REQUIRED AT THE TIM; Work Order: 1174488 | Complete |
Show 14 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2022-08-12finaled | T22RW02894City permit record | Right-of-Way (ROW)WO# 7500-01 Plan 1 is for the asphalt patch 15’ L X 15’ W X 6” D will be 9am-3pm. Plan 2 and 3 will; Work Order: 7500-01 | Complete | |
| 2022-06-08finaled | T22RW02062City permit record | ROWwo# 22R1338 - 855 W WETMORE RD REPAIR MAIN EMERGENCY CREW ON SITE. EMERGENCY AFTER THE FACT ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL Emergency - After the fact permit - a MCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Tucson Water to address since DTM did not have an opportunity to review, approve or inspect work. | Final | |
| 2022-04-20 | DS22-11City permit record | Zoning Verification LetterVolvo Cars of Tucson, PDMR and TSMR - PDMR and TSMR - Volvo Cars of Tucson. Porch, sidewalk, parking. PDMR 7.4.6.d.1, table 2. PDMR 7.4.6.d.1, table 1. TSMR 7.01.4.1.A. | Approved | |
| 2022-01-28expires 2026-09-05 | DP22-0012City permit record | Development PackageSite/Grading - Volvo Cars Tucson. Patio enclosure, add sidewalk, shift existing parking. | Issued | |
| 2021-07-19finaled | T21RW03393City permit record | ROWN.838254-4- AT CORNER OF W. HADLEY ST AND N. FAIRVIEW AVE ACCESS 3818 TO SPLICE NEW CABLES AND PLACE IN EXISTING DUCT. ADDRESS ON APPLICATION: 4235 N ORACLE RD. WORK IS LOCATED ON THE CORNER OF W. HADLEY ST AND N. FAIRVIEW AVE. ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY. APPROVAL FOR WORK IN CITY RIGHT OF WAY ONLY PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | Final | |
| 2020-09-23finaled | T20RW05188City permit record | ROWEXCAVATION AND INSTALLATION OF A 6" BYPASS. | Final | |
| 2020-09-14finaled | T20RW05034City permit record | ROWN.775933-2- ACCESS MH 3818 FOR SPLICING WORK W. HADLEY ST AND N. FAIRVIEW AVE. ON EXISTING CABLES. ADDRESS ON APP IS 4055 N ORACLE RD INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS | Final | |
| 2020-01-23finaled | T20FC00060City permit record | FIRECONSReplacing existing Fire Alarms in B & A suites | Final | |
| 2020-01-02expired 2020-07-01 | T20CM00014City permit record | Commercial BuildingREPLACE POLE LIGHT HEADS | Expired | |
| 2019-11-12finaled | T19FC00962City permit record | FIRECONSMODIFY EXISTING WET PIPE FIRE SPRINKLER SYSTEM | Final | |
| 2019-10-31finaled | T19OT01046City permit record | Fence / wall3-ILLUM WALL SIGNs | Final | |
| 2019-08-23 | T19TUP0011City permit record | TUPTemporary Office Trailers, Tent, and Restroom Trailer | Closed | |
| 2018-08-02finaled | T18CM06022City permit record | COMBOTI: DEALERSHIP | L of c | |
| 2013-12-06 | T13CM07373City permit record | COMBOINSTALL ELECTRICAL VEHICLE CHARGING STATIONS;COMM | Withdrwn |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Code enforcement (3)
Code cases and housing-code violations recorded against this parcel, by category. Closed cases stay on the record, and most of these are closed — check the status column. We show the category and the official record number rather than the complaint text, which often names people who have nothing to do with the property.
| Date | Record | What | Status |
|---|---|---|---|
| 2025-01-08 | CE-VIO0125-00094Code enforcement case | Vegetation | Closed - resolved |
| 2018-04-19 | T18DV02188Code enforcement case | Vegetation | Referred |
| 2017-11-01 | T17DV05708Code enforcement case | Vegetation | Complian |
Record numbers link to the City of Tucson’s official file. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 10409015E — 22 permits on file from 2013 to 2026 (4 right-of-way (row), 4 row, 3 commercial building, 2 right-of-way (row) - utility) and 3 code enforcement cases — assembled from the Pima County parcel file, the City of Tucson’s Property Research Online file (permits back to about 2006, further on some parcels), and the City’s GIS permit and code-enforcement layers (2022 onward). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).