Electrical permit history — 3665 W Courtney Crossing Ln

3665 W Courtney Crossing Ln

  • Electrical service: no service or panel permit on record — normal for a house built in 1999, which started at about 200 A.
  • Watch for: built 1999, before AFCI breakers were required in most rooms.
  • Other work on record: AC replaced 2025, solar added 2017, pool or spa permitted 2013, and 1 more — see the records below.

From City of Tucson permits and the Pima County Assessor, checked 13 Nov 2026. Not an inspection.

I am a
Get a free panel check

Is it time to upgrade?

Probably not: no service work is on record, which is normal for a house built in 1999.

  • Electrical service & panelLooks currentNo service or panel permit on record — normal for a house built in 1999, which started at about 200 A. Worth knowing: a 2017 solar pv permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything.
  • Heating & coolingLooks currentLast permitted 2025 (1 year ago) — the permit passed final inspection. The assessor still records cooling as Evaporative; the 2025 permit is the newer evidence (assessor characteristics can lag permitted work). Cooling equipment works harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. TC-RES-0325-01253 — 3 TON CONDENSER CHANGEOUT IN THE BACKYARD INCLUDING INDOOR COIL AND 80K BTUS FURNACE CHANGEOUT
  • Water heaterWorth checkingNo permit on record names this system. Water heaters are frequently swapped without a permit, so this line is especially weak evidence either way.
  • RoofWorth checkingNo permit on record names this system. The assessor records the roof as Asphalt.

What that usually means electrically

  • Era-based check

    AFCI protection did not enter the code until the 1999 NEC (bedroom circuits, effective 2002) and was not expanded to most living areas until 2008 — so houses from the earlier part of this range typically have none at all.

  • Worth confirming

    The assessor records a pool on this parcel. Equipment bonding, the equipotential bonding grid and GFCI protection on the pump and light circuits are the usual findings on pool equipment — the pool-bonding rules in NEC Article 680 were expanded in the 2008 cycle, so a pool built before that is worth an on-site check.

  • Era-based check

    200 A is typical and is usually adequate — worth confirming the panel has physical space before planning new loads.

What to check at the panel

These are the things only someone standing at the panel can settle — about a minute’s work.

  1. The number stamped on the main breaker handle — 100, 125, 150, 175 or 200. That is the service rating, and no record on this page confirms it.
  2. The busbar rating printed on the panel label. It is a different number from the main breaker, and it is the one that decides how much solar a panel can take under the 120% rule.
  3. The manufacturer and catalog number on the label inside the door.
  4. How many full-size spaces are left, how many positions the label permits a tandem breaker in, and the tandem limit the label states. A full panel is a different job from a full service.
  5. The conductor material at the main lugs, and whether the terminations look clean and tight.
  6. Whether there is a separate meter-main outside as well as the panel indoors — that changes where a disconnect and any new feeder would land.
  7. Whether the water heater, dryer and range are gas or electric. No public record carries fuel type, and it is the single biggest variable in a load calculation — it can move the calculated load on the same house by more than 40 A.

With those in hand you can run the numbers yourself. The load calculator does the NEC 220.82 optional-method calculation — the same method a permit application uses — and shows its work. It offers to start from the 1,165 sq ft on the assessor record; every other value is yours to enter. Open the load calculator

What these jobs cost here

The cooling equipment here was permitted in 2025 — replacement is not due yet.

Electrical panel or service upgrade Estimate

$3,800

Most jobs like this land between $3,400 and $4,700.

The bottom of this range is a clean, simple job: single storey, framed wall, the panel staying where it is, a short service run, and nothing unexpected once the cover comes off. That job is real and we do book it — but it is the best case, not the average, and the figure above it is what most houses actually come to.

Priced from built 1999 (200 A, pre-2008 AFCI-code era); City of Tucson permit fee and the 2023 NEC it has adopted.

Priced with Tucson Electric Power’s charges — TEP serves the City of Tucson. The assessor records framed walls, so no masonry drilling or stucco patch is priced.

What would move this price
  • Only if the panel has to move — a clothes closet, a bathroom, over a stairway, or behind a door +$3,900

If every one of those turned out to apply, this becomes about $8,600. That is the worst realistic case.

Before you spend anything
  • A service upgrade fixes capacity and the safety of the service equipment. It does not fix branch wiring. If the reason you are here is flickering lights, warm outlets or cloth-jacketed wiring, an upgrade is a down payment on a much bigger problem, and it is worth knowing that before you spend in the wrong order.
  • You may not need the upgrade at all. NEC 220.87 lets an existing dwelling be sized from twelve months of actual metered demand rather than a calculated load, and real houses draw far less than the calculation predicts. Ask your utility for a year of interval data and have it run that way first. Two cautions so this does not backfire: the demand tile in a TEP online account shows on-peak demand only, which is not the annual maximum the code asks for — you want the formal usage-data release — and 220.87 proves CAPACITY and nothing else. It does not create empty breaker spaces, and it does not make an obsolete panel, or one whose breakers have a documented failure history, safe. Those are separate questions with separate answers — and where the era makes a brand worth checking, the report above says so on its own.

A finalled HVAC permit from 2025 is on record, so the equipment is inside its expected life and we are not pricing a replacement.

What the record cannot tell us
  • Whether the service is already 200 A. Nothing in the public record says so, and the number is stamped on the main breaker handle.
  • Whether the panel can stay where it is. A panel in a closet, over stairs or behind a door has to move, and that alone adds $1,500 to $5,000.
  • Whether the service comes in overhead or underground. This is priced as overhead; an underground service with an adequate lateral is a few hundred dollars cheaper, and one with an undersized lateral is thousands more.

Price it for your house — change the assumptions (the panel’s location, the duct, the tonnage, whether the service is overhead or underground) and watch the number move.

Solar on this property

Solar was permitted here in 2017 and passed final inspection. What that means if you add anything: the panel’s busbar already carries the solar backfeed, so an EV charger, a heat pump or a bigger air conditioner has to fit what is left under the 120% rule in NEC 705.12, not just the service size. Check the busbar rating on the panel label before you add a load.

A battery, more panels or an EV charger tied to the solar is new permitted work, and anything that changes the solar connection usually needs a new interconnection application with TEP. TEP credits exported surplus at its RCP rate — about 5¢/kWh for new applications, locked for 10 years — so sizing to the home’s own use matters more than filling the roof.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; the City of Tucson regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
101233620
Year constructed
1999 (county record)
Permitting authority
Tucson
Zoning
R-3
Living area
1,165 sq ft
Cooling
Evaporative (assessor record; a 2025 permit names refrigerated equipment, and this report goes by the permit)
Heating
Forced Air
Electrical service
No service or panel permit on record — normal for a house built in 1999, which started at about 200 A. (the era estimate is from the year built, 1999 — not a measurement)

Living area, cooling and heating come from the Pima County Assessor’s file published 28 Jan 2026. Check any row against Pima County’s own parcel record ↗.

What this means for work here

The most recent permit with evidence of issuance is dated 2025. City records show the permit was finalized. The permit covers only the work described in that record.

What that reading rests on. The issuing offices hold 5 building permits for this parcel dated between 1999 and 2025. One trade permit, one solar permit, one pool or spa permit and one addition or alteration permit. 4 of them carry a final inspection; the other one was issued, expired or is still open, which is not the same as work completed.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Permit records courtesy of the City of Tucson — each link opens the City’s own file. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 101233620.

See an error? Report a correction · About this data.

Utility and upgrade pathElectric service here is Tucson Electric Power (TEP). A service or panel upgrade needs a TEP meter release and has to meet TEP’s service requirements — meter height and location, clearances, and the point of attachment. See TEP new-service requirements and the TEP standards notes.

In the public record: All homes in 85741 · Homes by ZIP code · Commercial property in 85741 · Permit data by neighborhood

Planning work at this home?

Arizona Electrical Solutions — electrical, HVAC, underground, design-build and general contracting in Tucson (four Arizona ROC licenses). The address, parcel and this report travel with your request.

Get a free panel check

Want a plain-English brief of this record first?

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this property compares nearby

Built in 1999 — earlier than about 14% of the 10,299 homes in ZIP 85741. 1,165 sq ft of living area — below this ZIP’s median of 1,511 sq ft. Properties on W COURTNEY CROSSING LN hold 108 City permits on record, 17 of them since 2022.

Counts and years from the same public records.

How this report was built

This is a reading of public records for parcel 101233620 — 5 City permits on file from 1999 to 2025 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive. City of Tucson permit records go back to the mid-1990s, with fewer before 2006, when the City’s older paper files were only partly digitized. The construction year, living area, cooling, heating, roof, walls and pool on this page come from our saved copy of the Assessor’s own published data file (dated 28 Jan 2026). The sewer connection file and the flood map were not read for this snapshot. A permit that is absent here may predate the digitized record or sit in a system this snapshot did not read. This record was built 13 Nov 2026 from the City’s permit export of that day.

What this report is and is not. This is a screening report written by Arizona Electrical Solutions from public records — the year the building went up, how it is classified and what has been permitted. It is not an inspection, an appraisal, a floodplain determination, or engineering, legal or purchasing advice, and nothing in it confirms what is installed at this address: a permit shows what was permitted, a missing permit does not mean nothing was done, and era notes describe what was common when the building went up, not what is in this one. Price figures are estimates, not quotes. The issuing agency’s own record is the official one and controls over anything summarized here — every permit links to it. Only someone looking at the panel can confirm the service size, the panel brand or the wiring.

Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.