Electrical permit history — 410 N Malacate St
410 N Malacate St, Tucson — built 1948, with 30 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
410 N Malacate St
Built 1948 — 1940s commercial stock · 30 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 410 N Malacate St (aztucsonelectricalsolutions.com/property/40155466a/410-n-malacate-st-tucson-az-85321) · Public records last checked 2026-08-16
- Parcel
- 40155466A
- Built
- 1948 (assessor record)
- Jurisdiction
- Unincorporated Pima County
- Zoning
- TR
- Assessor use
- Medical Clinic
- Parcel size
- 1.58 acres
- Building area
- 18,682 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X (shaded) — 0.2% annual-chance flood hazard (FEMA)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 building permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2024 building permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. This parcel is in unincorporated Pima County, so we read the county’s own permit system — including its historical permits, which reach back into the 1990s where they exist. Every record links to the county’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Routine
Office and medical tenant improvements are usually limited by available panel spaces and branch circuit capacity, not by the service itself.
Most recent permit on record for this parcel: 2024-05-22 (P24BP05058) — Tenant Improvement.
Permit history (30)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2024-05-22finaled | P24BP05058Pima County permit | BuildingTenant Improvement | C of O | |
| 2021-11-04 | P21BP11260Pima County permit | Addition / alterationCommercial Building Alteration | Permit Expired | |
| 2020-11-18 | P20BP08149Pima County permit | Other StructuresSign | Permit Expired | |
| 2019-03-05finaled | P19BP01380Pima County permit | Other StructuresSign | Final | |
| 2018-09-25finaled | P18RW01631Pima County permit | Right of WaySouthwest Gas - Kristine Schwartz | Final | |
| 2018-06-20finaled | P18RW01072Pima County permit | Right of WaySouthwest Gas - Kristine Schwartz | Final | |
| 2018-06-14 | P17BP07807-04Pima County permit | Addition / alterationCommercial Building Addition - Revision | Approved | |
| 2018-05-23 | P18BP02343-01Pima County permit | Addition / alterationCommercial Building Alteration - Revision | Approved |
Show 22 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2018-05-15 | P17BP07807-03Pima County permit | Addition / alterationCommercial Building Addition - Revision | Approved | |
| 2018-04-03finaled | P18BP02343Pima County permit | Addition / alterationCommercial Building Alteration | C of O | |
| 2018-02-12 | P17BP07807-02Pima County permit | Addition / alterationCommercial Building Addition - Revision | Approved | |
| 2018-02-01 | P18BP00767Pima County permit | Damage/Demo | Permit Expired | |
| 2018-01-29 | P17BP07807-01Pima County permit | Addition / alterationCommercial Building Addition - Revision | Approved | |
| 2017-12-22finaled | P17BP07807Pima County permit | Addition / alterationCommercial Building Addition | C of O | |
| 2017-12-22 | P17FC00752Pima County permit | Addition / alterationCommercial Building Addition | Withdrawn | |
| 2017-08-16 | P17BP01630-01Pima County permit | Addition / alterationCommercial Building Addition - Revision | Approved | |
| 2017-03-10finaled | P17BP01630Pima County permit | Addition / alterationCommercial Building Addition | C of O | |
| 2017-03-10 | P17FC00176Pima County permit | Floodplain UseCOB- ADD | Issued | |
| 2016-09-27 | P16BP05973Pima County permit | Addition / alterationCommercial Building Alteration | Void | |
| 2010-09-10finaled | P10CP05635Pima County permit | BuildingCOMBO/CTI - | C of O | |
| 2010-09-10finaled | P10CP05634Pima County permit | BuildingCOMBO/CTI - | C of O | |
| 2010-09-10finaled | P10CP05633Pima County permit | BuildingCOMBO/CTI - | Final | |
| 2009-06-25finaled | P09CP03741Pima County permit | HistoricalCOMBO/CADD - | C of O | |
| 2007-10-22finaled | P07CP09756Pima County permit | HistoricalCOMBO/CTI - | C of O | |
| 2006-07-12 | P06RW01667Pima County permit | Right of WayROW/RELE - — 410 N MALCATE ST | Issued | |
| 2002-10-31finaled | P02CP10903Pima County permit | HistoricalCOMBO/SNEW - — NEW CORNELIA LOT 466 | Final | |
| 2002-10-29 | P02CP10829Pima County permit | HistoricalMODULAR/MNEW - — CORNELIA LOT 466 | Withdrawn | |
| 2002-09-30 | P02CP09845Pima County permit | C of O HistoricalC-OF-O/COTH - | Application Expired | |
| 2001-02-14 | P01CP01444Pima County permit | HistoricalSIGN/SIGN - — NEW CORNELIA LOT 466 | Application Expired | |
| 2000-09-13 | P00RW02350Pima County permit | Right of WayROW/RDRI - — 410 MALACATE ST | Issued |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Showing the 30 most recent county records — this parcel has more. The full set is on Pima County’s permit portal (search the parcel number).
Record numbers link to the issuing office’s official file — Pima County’s portal for county permits, the City of Tucson’s for city records. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 40155466A — 30 permits on file from 2000 to 2024 (12 addition / alteration, 5 historical, 4 building, 4 right of way) — assembled from the Pima County parcel file, the City of Tucson GIS layers, and Pima County’s Accela permit portal (searched by parcel and by address, because the county’s parcel links break on older records). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
