Electrical permit history — 5990 W Ajo Hy
5990 W Ajo Hy, Tucson — built 2004, with 40 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
5990 W Ajo Hy
Build year not published — permits on file from 2004 · HVAC 2007 (finaled)
Permanent link: Electrical permit history for 5990 W Ajo Hy (aztucsonelectricalsolutions.com/property/21248069e/5990-w-ajo-hy-tucson-az-85735) · Public records last checked 2026-08-16
- Parcel
- 21248069E
- Built
- 2004 (earliest permit on file)
- Jurisdiction
- Unincorporated Pima County
- Zoning
- SR
- Assessor use
- Municipal Vacant Land
- Parcel size
- 195.78 acres
- Sewer
- Connection on file (1990, 2015, 2024) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 solar pv permit is on file (and 2 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalLikely dueLast permitted 2007 (19 years ago). City inspection record: BUILDING - FINAL approved 2007-07-03. Contractor of record: ENVIRONMENTAL STRATEGIES INC ,. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Equipment from before about 2010 generally runs R-22, which has not been produced since 2020 — repairs mean reclaimed refrigerant at a price that often exceeds replacing the unit. T07CM01152 — HVAC REPLACEMENT
- Fire alarm & life safetyCurrentLast permitted 2016 (10 years ago). Panels and devices age out on their own schedule, and the code moves underneath them — a system that was compliant when installed is not automatically compliant now. T16FC00036 — INSTALL PANELS TO MONITOR EXISTING FIRE ALARM PANEL
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. This parcel is in unincorporated Pima County, so we read the county’s own permit system — including its historical permits, which reach back into the 1990s where they exist. Every record links to the county’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Vacant or limited-use parcels often need the service re-established or re-sized before a tenant can occupy the space.
- Worth confirming
A pool or spa was permitted in 2025. Pool equipment brings its own bonding grid, GFCI requirements, and usually a subpanel — and the bonding rules have tightened since, so older installations are worth verifying.
- Worth confirming
Solar was permitted here in 2022. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
Most recent permit on record for this parcel: 2026-06-17 (P26BP04074) — Commercial Building Alteration — CHASSE Building - Water Rack Pipe Relocation.
Permit history (40)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-06-17 | P26BP04074Pima County permit | Addition / alterationCommercial Building Alteration — CHASSE Building - Water Rack Pipe Relocation | Issued | |
| 2026-05-14 | TW-CONS-0526-0074City permit record | TW CIP Planning & EngineeringWell AV-018A SCADA upgrades | Inspections | |
| 2026-05-14 | TW-CONS-0526-0075City permit record | TW CIP Planning & EngineeringWell E-008A SCADA Upgrades, Herman Construction PO-008467 | Submitted | |
| 2025-02-05finaled | TC-COM-0225-00238City permit record | Pool / spaT.I. Hayden Udall Conference Room, transitioning former control room into a conference space | Complete | |
| 2024-07-22expires 2026-12-16 | TC-COM-0724-01400City permit record | Commercial BuildingSCADA upgrades to existing Tucson Water Well E-008--Facility Address in MapTucson is 7354 E IRVINGTON RD (please reach out to Matthew Carlton or Juan Garcia at intake, to ensure in house review) | Issued | |
| 2024-07-10 | TF-FCP-0724-00549City permit record | Fire ConstructionVOID-Not Required per John Vincent & Tim Gard - paper permit for o2 sensor install | Void | |
| 2024-02-16finaled | TC-COM-0224-00311City permit record | Pool / spaCity of Tucson Water Department The new City of Tucson Hayden Udall Warehouse will provide: • New organized and convenient storage spaces. • New offices, workspaces, and support spaces for Tucson Water staff. Note: All Landscape and Native Plant Preservation Plan by COT | Complete | |
| 2024-02-14finaled | TD-DEV-0224-00047City permit record | Pool / spaRestricted access - Revision 1 - City of Tucson Water Department The new City of Tucson Hayden Udall Warehouse will provide: • New organized and convenient storage spaces. • New offices, workspaces, and support spaces for Tucson Water staff. Note: All Landscape and Native Plant Preservation Plan by COT | Complete |
Show 32 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2023-12-18expires 2027-07-16 | TD-DEV-1223-00483City permit record | Development PackageRestricted Access - SCADA upgrades at existing Tucson Water wellsite E-008A, extend fencing, new electrical rack & shade structure, piping modifications. Special Exception Waiver has been approved for this site | Inspections | |
| 2022-11-07 | TD-DEV-1122-00027City permit record | Development Package**VOIDED*** DUE TO LEGACY CASE DP22-0039 WILL REMAIN ACTIVE FOR ; Development Permit Revision | Void | |
| 2022-05-31finaled | T22CM04082City permit record | Solar PVPV GROUND MOUNTED SOLAR SYSTEM | Complete | |
| 2022-02-25finaled | DP22-0039City permit record | Solar PVSITE: City of Tucson - Hayden Udall. Solar 650 kW AC Photovoltaic, ground-mount and floating arrays | Complete | |
| 2021-06-14expired 2025-01-28 | T21CM04953City permit record | Commercial BuildingTUCSON WATER NEW FUEL FACILITY | Issued | |
| 2020-08-18expired 2021-11-06 | T20CM05322City permit record | Commercial BuildingNEW 6" PRV RELOCATION/ABANDONMENT OF EXIST | Expired | |
| 2020-02-19expired 2020-09-19 | T20CM01123City permit record | Commercial BuildingE - TI: WATER QUALITY LAB | Expired | |
| 2020-02-05expired 2021-03-23 | T20CM00861City permit record | Commercial BuildingE - MODIFICATION OF A/C SYSTEM; INTERIOR TI; CITY PROJECT | Expired | |
| 2017-02-01expired 2023-04-11 | T17FC00101City permit record | FIRECONSCell Monitor | Closed | |
| 2017-01-31expired 2023-04-11 | T17FC00094City permit record | FIRECONSTWD CHEMICAL - INSTALL A CELL TRANSMITTER TO MONITOR EXISTING FACP INSTALL A FIRE RADIO AS BACK UP TRANSMITTER | Closed | |
| 2017-01-31expired 2023-04-11 | T17FC00095City permit record | FIRECONSTWD RAW WATER - INSTALL A CELL TRANSMITTER TO MONITOR EXISTING FACP INSTALL A FIRE RADIO AS BACK UP TRANSMITTER | Closed | |
| 2017-01-31expired 2023-04-11 | T17FC00096City permit record | FIRECONSTWD OZONE- INSTALL A CELL TRANSMITTER TO MONITOR EXISTING FACP INSTALL A FIRE RADIO AS BACK UP TRANSMITTER | Closed | |
| 2017-01-31expired 2023-04-11 | T17FC00097City permit record | FIRECONSTWD DISINFECT- INSTALL A CELL TRANSMITTER TO MONITOR EXISTING FACP INSTALL A FIRE RADIO AS BACK UP TRANSMITTER | Closed | |
| 2016-11-08finaled | T16CM08462City permit record | COMBOTI;TUCSON WATER DEP. | L of c | |
| 2016-09-09finaled | T16FC00036City permit record | FIRECONSINSTALL PANELS TO MONITOR EXISTING FIRE ALARM PANEL | Final | |
| 2016-08-30finaled | T16BU01234City permit record | SPKLRSPRINKLER CITY PROPERTY | Final | |
| 2016-05-13finaled | T16BU00768City permit record | SPKLRFIRE SPRKL | Final | |
| 2016-03-25finaled | T16BU00438City permit record | BUILDFIRE ALARM | Final | |
| 2015-08-06finaled | DP15-0128City permit record | Development PackageSITE GRADING UDALL PLANT | Complete | |
| 2015-08-06finaled | T15CM05405City permit record | COMBOWATER TREATMENT PLANT | C of o | |
| 2015-02-05finaled | T15CM00752City permit record | COMBOTI: OFFICE/TUCSON WATER | L of c | |
| 2014-05-08expired 2015-03-17 | T14CM02718City permit record | COMBOTI: BRIDGE CRANE | Expired | |
| 2009-04-24finaled | T09EL00955City permit record | ELECTREMOVAL OF TEP TRANSFORMER, REFEED SERVICE | Final | |
| 2009-04-17finaled | T09BU00568City permit record | GRADSWPPGRADING & SWPPP | Final | |
| 2009-04-10 | T09BU00525City permit record | Solar PVGRADING FOR GROUND MOUNT SOLAR PROJECT | Void | |
| 2009-03-24finaled | T09CM00638City permit record | Solar PVADD: GROUND MOUNT SOLAR PROJECT REVISION THREE: INCREASE LENGTH OF SHADE CANOPY | Final | |
| 2008-10-20finaled | P08CP07718Pima County permit | HistoricalCOMBO/COTH - | Final | |
| 2007-03-21finaled | T07CM01152City permit record | COMBOHVAC REPLACEMENT | Final | |
| 2005-06-14finaled | T05CM02743City permit record | COMBOENERGY, HVAC AND CONTROLS UPGRADE - PHASE II | Final | |
| 2004-11-29finaled | T04BU02883City permit record | SPKLRFIRE SPKR:ADD 3 | Final | |
| 2004-10-04finaled | T04CM04402City permit record | COMBOREPLACE:COOLING TOWERS/WATER PUMPS & ADD:HEAT PUMP on roof of administration building. | Final | |
| 2004-01-28finaled | T04CM00370City permit record | COMBOINSTALL:UPS/BATTERY & UPGRADE:COMMUNICATIONS ROOM | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the issuing office’s official file — Pima County’s portal for county permits, the City of Tucson’s for city records. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.
Planning work at this property?
Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
Send: the permanent link and the summary above, once. Watch: one email when a new permit, inspection result or code case appears on this parcel — nothing else, and you can stop any time. No list either way.
How this report was built
This is a reading of public records for parcel 21248069E — 40 permits on file from 2004 to 2026 (8 combo, 6 firecons, 5 commercial building, 4 solar pv) — assembled from the Pima County parcel file, the City of Tucson GIS layers, and Pima County’s Accela permit portal (searched by parcel and by address, because the county’s parcel links break on older records). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
