Electrical permit history — 150 N Avra Rd

150 N Avra Rd, Tucson — with 54 permits on record. Review electrical, HVAC and remodel history with links to official records.

Electrical Property Screening Report · Commercial property

150 N Avra Rd

A screening report for electrical planning, assembled from public-record indicators. It is not an official record and every figure in it should be verified against the issuing agency before it is relied on.

Verify parcel data at official source ↗

Build year not published — permits on file from 2000 · 54 permits on record; no permitted panel/service or HVAC work among them

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 pre-application conference permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. No permitted service or distribution work shows in the record we read. Gear of this era is generally still supported, but spare capacity drifts with every tenant improvement — worth a load check against the panel schedule before adding major equipment. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 pre-application conference permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. This parcel is in unincorporated Pima County, whose building permits are issued by Pima County Development Services and are not part of this record — what is shown here comes from the regional records, and is likely incomplete for this address. A records request to the county is the authoritative check. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check

    Gear in this age range is usually still supported but is due for infrared scanning and torque verification if that has not been done recently. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Routine

    A trade permit was pulled in 2019. Trade permits cover electrical, plumbing, and mechanical work individually, so some permitted trade work has been done here since.

Solar and energy potential

Roof footprint
≈ 6,023 sq ft (county building-footprint layer, 2 structures)
Usable for solar, planning estimate
≈ 4,200 sq ft (~70% after setbacks, rooftop equipment and access paths)
Array that could fit
on the order of 45 kW — roughly 110 panels (low-tilt ballasted rows, 400 W class modules)
Estimated annual production
≈ 74,000 kWh (PVWatts, Tucson sun, low-tilt south)
Energy-charge offset at TEP commercial rates
$6,000–$9,500 a year (8–13¢/kWh energy + power-supply charges, by season and rate class)

Planning-level arithmetic on the roof area above — not a shading study, a structural review or a design. The offset assumes the building uses the power as it is generated; TEP pays far less (its export rate is about 5¢/kWh) for surplus sent to the grid, so the load profile decides the real value. The 30% federal credit (§48E) still applies to commercial systems placed in service by the end of 2027 — projects that began construction by July 4, 2026 have longer; confirm timing with a tax adviser.

TEP grid capacityThis parcel is not inside any of the 11 areas TEP has mapped as saturated with distributed generation (the nearest, “I-10 and Twin Peaks Rd”, is about 11 miles away — TEP’s map set, July 2020). New generation still goes through TEP’s interconnection screens, and a heavy new load still merits a utility capacity check — the maps only mark where that review is most likely to bite.

Get a commercial solar & switchgear analysis

See the property

Satellite imagery © Google. Imagery can predate recent work and shows nothing about what is inside — context, not evidence.

Flood and drainage

The federal flood map and the local one are not the same map, and they do not always agree. FEMA’s is the insurance map; Pima County Regional Flood Control District regulates against its own, and that is the one a permit here is judged against.

The record behind this read

Parcel
21116006A
Year constructed
2000 (earliest permit on file)
Permitting authority
Unincorporated Pima County
Zoning
RH
Property type
Municipal Park/Recreational Property

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What this means for work here

Informational public-record summary — not engineering, inspection, valuation or purchasing advice, and not the official record.

The most recent permitted work on this parcel was in 2026. That says the parcel was worked on under permit, not what the work covered — a roof, a pool or a changeout tells you nothing about the electrical service. Work done without a permit leaves no trace here at all.

What that reading rests on. The issuing offices hold 54 building permits for this parcel dated between 2000 and 2026. By category the work is new construction (23), trade permit (20), tw capital construction (2) and addition / alteration (2). 21 of them carry a final inspection; the other 33 were issued, expired or are still open, which is not the same as work completed.

Go straight to the records

Each link opens the issuing office’s own file for that record — dates, scope, status and inspections are theirs to publish, and they are all on the other side of these links.

Read the records yourself. We republish selected facts and record numbers so you can find the file; the issuing agency’s record controls. The files are held by City of Tucson permit record (PRO) ↗ — search the parcel number 21116006A. Permit and parcel information courtesy of the City of Tucson and Pima County; their files are the official record and control over anything summarized here.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Utility and upgrade pathElectric service in this area is largely Trico Electric Cooperative; parts are Tucson Electric Power. That matters for an upgrade: the meter release, the required clearances and the point of attachment come from whichever utility serves the meter, and Trico’s process is its own. Check a recent bill or the label on the meter — and see TEP new-service requirements for the TEP side.

In the public record: All institutional and public property · Commercial property in 85653 · Commercial & industrial reports · Homes in 85653 · Permit data by neighborhood

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

What the flood note is not. The FEMA map linked above is the National Flood Hazard Layer — the federal insurance map. Local floodplain mapping is not reproduced here; use the authority’s own map, linked above. Nothing here is a floodplain determination, an elevation certificate, or a substitute for one. A parcel can straddle a boundary, and a Letter of Map Amendment can remove a structure the map still covers. For a determination, ask the floodplain administrator for the jurisdiction named above; for a design that has to satisfy one, that is work we do.

How this property compares nearby

Properties on N AVRA RD hold 62 City permits on record, 21 of them since 2022.

Computed from the same public records as this report — counts and years, not an appraisal.

Complete permit record (54 entries)

Every permit and case we hold for this parcel, newest first. Each number links to the official file.

YearNumberTypeStatus
2026TW-CONS-0426-0050TW Capital Construction PermitInspections
2026TC-COM-0426-00564Commercial Addition/Alteration PermitIssued
2026TW-CONS-0426-0051TW Capital Construction PermitInspections
2025TC-COM-1125-02098Commercial Addition/Alteration PermitIssued
2025TD-DEV-1225-00300Development PackageSubmitted
2025TC-COM-1225-02182Commercial New Building PermitSubmitted
2025CIP-1125-00028(CIP) Development Site + Commercial StructureIn Review
2025CIP-0825-00020(CIP) Development Site + Commercial StructureNeeds Resubmittal
2024CIP-0924-00033(CIP) Commercial StructureIn Review
2024TC-COM-0823-02029Commercial Trade PermitIssued
2024CIP-0324-00004(CIP) Commercial StructureIn Review
2023recordRight-of-Way (ROW) Permit - UtilityVoid
2023TP-PRE-0523-00227Pre-Application ConferenceComplete
2019T19CM05706Commercial Trade PermitComplete
2018T18CM06997Commercial Trade PermitComplete
2018T18CM07001Commercial Trade PermitComplete
2018T18CM07002Commercial Trade PermitComplete
2018T18CM06946Commercial Trade PermitComplete
2018T18CM06947Commercial Trade PermitComplete
2018T18CM07041Commercial Trade PermitComplete
2018T18CM06828Commercial Trade PermitCanceled
2018T18CM07042Commercial Trade PermitComplete
2018T18CM07043Commercial Trade PermitComplete
2018T18CM06998Commercial Trade PermitComplete
2018T18CM06945Commercial Trade PermitComplete
2018T18CM06948Commercial Trade PermitComplete
2018T18CM06990Commercial Trade PermitComplete
2018T18CM07000Commercial Trade PermitComplete
2010T10CM01422Commercial Trade PermitComplete
2009T09CM02372Commercial New Building PermitComplete
2008T08CM00121Commercial New Building PermitCanceled
2008T08CM00122Commercial New Building PermitCanceled
2008T08CM00123Commercial New Building PermitCanceled
2007T07CM00607Commercial New Building PermitCanceled
2005T05CM04734Commercial New Building PermitCanceled
2002T02CM04391Commercial New Building PermitComplete
2002T02CM02529Commercial New Building PermitCanceled
2002T02CM02530Commercial New Building PermitCanceled
2002T02CM02526Commercial New Building PermitCanceled
2002T02CM02528Commercial New Building PermitCanceled
2002T02CM02527Commercial New Building PermitCanceled
2002T02CM02525Commercial New Building PermitComplete
2002T02CM02119Commercial New Building PermitCanceled
2002T02CM02122Commercial New Building PermitCanceled
2002T02CM02120Commercial New Building PermitCanceled
2002T02CM00066Commercial New Building PermitCanceled
2000T00CM03376Commercial New Building PermitComplete
2000T00CM03377Commercial New Building PermitComplete
2000T00CM01979Commercial Trade PermitCanceled
2000T00CM01978Commercial Trade PermitCanceled
2000T00CM01980Commercial Trade PermitCanceled
2000T00CM02315Commercial New Building PermitCanceled
2000T00CM02316Commercial New Building PermitCanceled
2000T99CM04223Commercial New Building PermitCanceled

prints this report — permits, comparisons and sources — as a clean document

How this report was built

This is a reading of public records for parcel 21116006A — 54 City permits on file from 2000 to 2026 — assembled from the Pima County parcel file and the City of Tucson’s published permit layers together with the City’s own migrated permit archive, whose records reach back to the mid-1990s. Some records were still not read for this snapshot: City permit records before the mid-1990s were never fully digitized, and this parcel is in unincorporated Pima County, whose own permits (the county’s Accela portal) were also not read. The assessor’s building record, the sewer connection file and the flood map were also not read for this snapshot. Absence of a permit here is NOT evidence work was never permitted — it may predate the digitized record or sit in a system this snapshot did not read. Public records snapshot taken 2026-08-22.

The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.