Electrical permit history — 3782 E 43rd Pl

3782 E 43rd Pl, Tucson — built 1986, with 25 permits on record. Review electrical, HVAC and remodel history with links to official records.

Commercial property

3782 E 43rd Pl

Built 1986 — 1980s commercial stock · 25 permits on record; no permitted panel/service or HVAC work among them

Parcel
13204200A
Built
1986 (assessor record)
Jurisdiction
Unincorporated Pima County
Zoning
CI-2
Assessor use
Warehouse W/Office/Retailplanned Park
Parcel size
3.25 acres
Building area
40,113 sq ft (assessor record)
Sewer
Connection on file (2001) (county sewer connection records)
Flood zone
X — minimal flood hazard (FEMA)

See the property

County aerial photograph centered on 3782 E 43rd Pl, parcel outlined

Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.

Is it time to upgrade?

  • Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 addition / alteration permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
  • Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2023 addition / alteration permit is on file (and 1 more like it) — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
  • Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
  • RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.

A found permit means a lot. A missing one means less. This parcel is in unincorporated Pima County, so we read the county’s own permit system — including its historical permits, which reach back into the 1990s where they exist. Every record links to the county’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.

What that usually means electrically

  • Era-based check — high priority

    Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.

  • Era-based check

    NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.

  • Worth confirming

    Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.

Most recent permit on record for this parcel: 2026-06-09 (P26RW00680) — 43RD - S DODGE BL.

Permit history (25)

Permit history for this parcel — 8 of 25 records
DateRecordWhatStatusValue
2026-06-09P26RW00680Pima County permitRight of Way43RD - S DODGE BLApproved
2025-02-08P25BP01059Pima County permitElectrical / mechanicalElectrical EquipmentPermit Expired
2025-01-28P23BP00510-03Pima County permitAddition / alterationCommercial Building Addition - RevisionApproved
2024-12-02P23BP00510-02Pima County permitAddition / alterationCommercial Building Addition - RevisionApproved
2024-11-05P24RW01591Pima County permitRight of Way43RD - 44th place/ dodge blvdRequest for Corrections
2024-10-31P23BP00510-01Pima County permitAddition / alterationCommercial Building Addition - RevisionApproved
2024-07-26TR-ROW-0724-00858City permit recordRight-of-Way (ROW)Relocation of 24in water line for the COT water department under the union pacific railroad.Void
2024-05-13finaledP24RW00655Pima County permitRight of Way43RD - Dodge BLVD AND Refinery wayFinal
Show 17 older records
Permit history for this parcel — remaining 17 records
DateRecordWhatStatusValue
2023-01-20finaledP23BP00510Pima County permitAddition / alterationCommercial Building AdditionC of O
2022-04-14finaledP22BP04253Pima County permitDamage/DemoFinal
2021-11-03P21BP11210Pima County permitDamage/DemoWithdrawn
2015-10-07finaledP15RW01555Pima County permitRight of WayROW / RGAS / SW GAS CORPORATION - TINA HALSTEADFinal
2012-11-27finaledP12CP06944Pima County permitBuildingCOMBO/COTH - — DP28032Final
2011-10-07P11CP06516Pima County permitOther StructuresCOMBO/SIGN - — DP 5/12Expired
2010-09-13finaledP10CP05649Pima County permitBuildingCOMBO/CTI - — DP # 05012C of O
2010-04-20P10RW00509Pima County permitRight of WayROW/RGAS - — 3782 E 43 RD PLIssued
2010-03-24finaledP10CP01778Pima County permitBuildingCOMBO/CTI - — DP # 05012 43 RD. PL. BUSINESS CENTERC of O
2010-02-26P10CP01147Pima County permitOther StructuresCOMBO/SIGN -Expired
2010-02-03finaledP10CP00648Pima County permitElectrical / mechanicalCOMBO/MECH -Final
2009-12-07finaledP09CP07035Pima County permitC of O HistoricalCOMBO/COFO - — 3774 E. 43 RD PLACEDP#05012C of O
2001-06-08finaledP01CP05658Pima County permitHistoricalCOMBO/CTI - — CAYLOR INDUSTRIAL LOT 9 DP 5/12C of O
1997-11-12finaledP97CP13413Pima County permitC of O HistoricalC-OF-O/COTH - — FORTY THIRD PLACE BUSINESS CENTERC of O
1996-06-12finaled113024Pima County permitHistoricalPMSHIST/ -Final
1996-01-03finaled106681Pima County permitHistoricalPMSHIST/ -Final
1995-12-12finaled106024Pima County permitHistoricalPMSHIST/ -Final

How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.

Record numbers link to the issuing office’s official file — Pima County’s portal for county permits, the City of Tucson’s for city records. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.

This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel. See an error in this public-record report? Report a correction · About this data.

Planning work at this property?

Arizona Electrical Solutions provides electrical, HVAC, underground, design-build, tenant-improvement and general-contracting services in Tucson (four Arizona ROC licenses). Choose what describes you and send us this property’s address and public-record report for review — the address, parcel, report link and permit record travel with the request automatically.

What describes you?
Call (520) 308-6235

The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.

How this report was built

This is a reading of public records for parcel 13204200A — 25 permits on file from 1995 to 2026 (5 right of way, 4 addition / alteration, 4 historical, 3 building) — assembled from the Pima County parcel file, the City of Tucson GIS layers, and Pima County’s Accela permit portal (searched by parcel and by address, because the county’s parcel links break on older records). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.

The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).

Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.