Electrical permit history — 3450 N Kelvin Bl
3450 N Kelvin Bl, Tucson — built 2022, with 22 permits on record. Review electrical, HVAC and remodel history with links to official records.
Commercial property
3450 N Kelvin Bl
Built 2022 — 2020s commercial stock · 22 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 3450 N Kelvin Bl (aztucsonelectricalsolutions.com/property/11103043b/3450-n-kelvin-bl-tucson-az-85716) · Public records last checked 2026-08-16
- Parcel
- 11103043B
- Built
- 2022 (assessor record)
- Jurisdiction
- Unincorporated Pima County
- Zoning
- MU
- Assessor use
- Warehouse W/ Office/ Retail
- Parcel size
- 1.51 acres
- Building area
- 12,319 sq ft (assessor record)
- Sewer
- No connection on file (sewer or septic status not confirmed by the record — verify on site)
- Flood zone
- X — minimal flood hazard (FEMA)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 electrical / mechanical permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2022 electrical / mechanical permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. This parcel is in unincorporated Pima County, so we read the county’s own permit system — including its historical permits, which reach back into the 1990s where they exist. Every record links to the county’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Worth confirming
Industrial and warehouse space usually means three-phase motor loads. High-bay LED retrofits and added VFDs both change the load picture.
- Worth confirming
Solar was permitted here in 2022. That means there is an existing interconnection, and the main breaker and busbar rating already carry a PV backfeed — so anything else you add (an EV charger, a heat pump) has to be checked against what is left under the 120% rule, not against the service size alone.
Most recent permit on record for this parcel: 2026-05-05 (P26RW00530) — KELVIN - KLEINDALE RD.
Permit history (22)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-05-05 | P26RW00530Pima County permit | Right of WayKELVIN - KLEINDALE RD | Renewed | |
| 2026-04-24 | P25BP09452-01Pima County permit | RevisionCommercial Building New - Revision | Approved | |
| 2026-04-15 | P26RW00465Pima County permit | Right of WayKELVIN - Fort Lowell Rd | Withdrawn | |
| 2025-12-23 | P25BP09452Pima County permit | BuildingCommercial Building New — Smyth Commercial Private Shop - BLDG 2 - Units 1-4 | Issued | |
| 2025-04-08finaled | P25RW00465Pima County permit | Right of WayKELVIN - Greenlee Rd. | Final | |
| 2022-09-29 | P22RW01544Pima County permit | Right of WayKELVIN - Kelvin & Greenlee | Approved | |
| 2022-03-29finaled | P22RW00518Pima County permit | Right of WayKELVIN - Greenlee & Kelvin | Final | |
| 2022-02-17finaled | P22BP01832Pima County permit | Electrical / mechanicalSolar | Final |
Show 14 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2022-02-17 | P22FC00228Pima County permit | Solar PVSolar | Withdrawn | |
| 2022-01-19finaled | P22RW00133Pima County permit | Right of WayKELVIN - Kelvin Blvd & Greenlee Rd | Final | |
| 2021-12-21 | P21RW02203Pima County permit | Right of WayKelvin - Kelvin & Greenlee | Approved | |
| 2021-12-16finaled | P21RW02179Pima County permit | Right of WayKELVIN - E GREENLEE RD | Final | |
| 2021-07-23finaled | P21RR00133Pima County permit | Public Records RequestPRR2107-05 | Complete | |
| 2021-04-30finaled | P21RW00866Pima County permit | Right of WayKELVIN - Greenlee Rd | Final | |
| 2021-01-28finaled | P21RW00195Pima County permit | Right of WayKELVIN - E KLEINDALE RD | Final | |
| 2020-12-15finaled | P20BP08809Pima County permit | BuildingCommercial Building New | C of O | |
| 2018-09-26finaled | P18RW01634Pima County permit | Right of WaySouthwest Gas - Kristine Schwartz | Final | |
| 2000-03-09finaled | P00CP02527Pima County permit | HistoricalPLUMB/COTH - — RILLITO RIVER SIDE ACRES LOT 11 | Final | |
| 1996-04-17finaled | 105715Pima County permit | HistoricalPMSHIST/ - | Final | |
| 1995-07-17finaled | 100973Pima County permit | HistoricalPMSHIST/ - | Final | |
| 1990-02-15 | 39954Pima County permit | HistoricalPMSHIST/ - | Expired | |
| 1989-08-01finaled | 34376Pima County permit | HistoricalPMSHIST/ - | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Record numbers link to the issuing office’s official file — Pima County’s portal for county permits, the City of Tucson’s for city records. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, once. No list, no follow-up unless you ask for it.
How this report was built
This is a reading of public records for parcel 11103043B — 22 permits on file from 1989 to 2026 (11 right of way, 5 historical, 2 building, 1 revision) — assembled from the Pima County parcel file, the City of Tucson GIS layers, and Pima County’s Accela permit portal (searched by parcel and by address, because the county’s parcel links break on older records). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
