Electrical permit history — 5755 E River Rd
5755 E River Rd, Tucson — built 1985, with 43 permits on record. Review electrical, HVAC and remodel history with links to official records.
Multifamily property
5755 E River Rd
Built 1985 — 1980s multifamily stock · 43 permits on record; no permitted panel/service or HVAC work among them
Permanent link: Electrical permit history for 5755 E River Rd (aztucsonelectricalsolutions.com/property/10922134c/5755-e-river-rd-tucson-az-85750) · Public records last checked 2026-08-16
- Parcel
- 10922134C
- Built
- 1985 (assessor record)
- Jurisdiction
- Unincorporated Pima County
- Zoning
- CB-1
- Assessor use
- Apartments 100+ Units 3 Or More Story
- Parcel size
- 14.39 acres
- Building area
- 235,062 sq ft (assessor record)
- Sewer
- Connection on file (1984) (county sewer connection records)
- Flood zone
- X — minimal flood hazard (FEMA)
See the property
Pima County orthophoto (Pictometry 2024 / PAG 2023 / NAIP 2023 mosaic) — parcel outlined in yellow. Aerials can predate recent work and show nothing about what is inside; context, not evidence.
Is it time to upgrade?
- Electrical service & distributionNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2018 addition / alteration permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. That does not mean the gear is original — only that nothing has been permitted here recently. Where it matters is capacity: obsolete distribution lines carry breaker and fusible-switch lead times that turn an outage into a shutdown, and that is worth knowing before a new tenant or a new rooftop unit. Separately from replacement: NFPA 70E expects the arc-flash study to be reviewed at least every five years, or after any change to the service.
- Heating, cooling & mechanicalNot in this windowNothing in the permit records we read for this parcel that names this system. Worth knowing: a 2018 addition / alteration permit is on file — work like this is often folded into a larger permit without being named, so open that record and check its scope before concluding anything. Packaged rooftop units work harder in Tucson than almost anywhere, so 12 to 15 years is a realistic service life rather than the 15 to 20 the industry quotes. Worth confirming from the equipment nameplate rather than the record. Replacing a rooftop unit is also an electrical question: the new unit's minimum circuit ampacity and its disconnect often differ from the old one.
- Fire alarm & life safetyNot in this windowNothing in the permit records we read for this parcel that names this system. Any alarm or sprinkler work here predates this feed. For an occupied commercial building that is worth confirming from the panel and the inspection tags rather than assuming.
- RoofNot in this windowNothing in the permit records we read for this parcel that names this system. Roof age matters electrically too: it sets what can be penetrated for new rooftop units, conduit, or solar.
A found permit means a lot. A missing one means less. This parcel is in unincorporated Pima County, so we read the county’s own permit system — including its historical permits, which reach back into the 1990s where they exist. Every record links to the county’s official file. A blank line does not say nothing was done: work gets done without permits all the time. The only way to know what is actually installed is to look at it.
What that usually means electrically
- Era-based check — high priority
Distribution gear this age is frequently past the point where the manufacturer still supports it. Breakers and fusible switches for obsolete lines can carry long lead times, which turns an outage into a shutdown. The permit record does not confirm this; an on-site inspection is required.
- Worth confirming
Multifamily property. House panels, unit meters, and common-area loads are usually metered and maintained separately — worth confirming which side of the meter a problem falls on before scheduling work.
- Era-based check
NFPA 70E expects arc-flash studies to be reviewed at least every five years, or after any change to the service. Buildings this age often have labeling that no longer matches the installed gear. The permit record does not confirm this; an on-site inspection is required.
Recorded sales (1)
| Date | Price | Type |
|---|---|---|
| 2022-07-05 | $91,801,453 | Warranty Deed |
Recorded sales are the sales the Pima County Assessor has on file from affidavits of property value — not every transfer, not listings, and not a valuation. Parties are never shown here. A sale with no permitted electrical work since is worth knowing before the next sale or a remodel.
Most recent permit on record for this parcel: 2026-08-07 (P26BP05297) — Electrical Equipment — Hiland apartments.
Permit history (43)
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2026-08-07finaled | P26BP05297Pima County permit | Electrical / mechanicalElectrical Equipment — Hiland apartments | Final | |
| 2025-02-07finaled | P25BP01056Pima County permit | Electrical / mechanicalElectrical Equipment | Final | |
| 2025-02-07finaled | P25BP01055Pima County permit | Electrical / mechanicalElectrical Equipment | Final | |
| 2025-01-03finaled | P25BP00027Pima County permit | Electrical / mechanicalElectrical Equipment | Final | |
| 2025-01-02 | P25BP00007Pima County permit | Building | Void | |
| 2024-10-16 | P24BP09069Pima County permit | Electrical / mechanicalElectrical Equipment | Permit Expired | |
| 2022-05-18finaled | P22RR00074Pima County permit | Public Records RequestZVL 5755 E River 3 | Complete | |
| 2021-03-18 | P21BP02315Pima County permit | Electrical / mechanicalElectrical Equipment | Application Expired |
Show 35 older records
| Date | Record | What | Status | Value |
|---|---|---|---|---|
| 2020-10-26 | P20BP07435Pima County permit | Damage/Demo | Permit Expired | |
| 2020-10-01finaled | P20BP06739Pima County permit | Other StructuresSign | Final | |
| 2018-09-11 | P18RR00296Pima County permit | Public Records RequestZVL P&Z Resource Co- E. River Rd | In Review | |
| 2018-07-31finaled | P18BP05535Pima County permit | BuildingCommercial Building Other | Final | |
| 2018-06-19finaled | P18RR00193Pima County permit | Public Records RequestZVL Planning and Zoning Resource Co.- E River Rd | Complete | |
| 2018-06-12 | P18RR00178Pima County permit | Public Records RequestC of O Reprint | In Review | |
| 2018-05-18finaled | P18BP03710Pima County permit | Addition / alterationCommercial Building Alteration | C of O | |
| 2018-01-09finaled | P18BP00186Pima County permit | Electrical / mechanicalMechanical/Plumbing Equipment - professional plumbing | Final | |
| 2016-07-11 | P14CP04707-01Pima County permit | RevisionCOMBO/CTI - - Revision | Approved | |
| 2014-07-30finaled | P14CP04707Pima County permit | BuildingCOMBO/CTI - | Final | |
| 2012-11-27finaled | P12CP06890Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2012-11-27finaled | P12CP06891Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2012-11-27finaled | P12CP06892Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2012-11-27finaled | P12CP06893Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2012-11-27finaled | P12CP06894Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2012-11-27finaled | P12CP06895Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2012-11-27finaled | P12CP06896Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2012-11-27 | P12CP06897Pima County permit | BuildingCOMBO/CALT - | Void | |
| 2012-11-27finaled | P12CP06898Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2012-11-27finaled | P12CP06899Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2012-11-27finaled | P12CP06900Pima County permit | BuildingCOMBO/CALT - | Final | |
| 2006-06-30finaled | P06CP08129Pima County permit | HistoricalCOMBO/COTH - — DP 04091 | Final | |
| 2004-08-19finaled | P04CP09479Pima County permit | HistoricalELECT/SOTH - — BLDG 30 APT 3002 | Final | |
| 2001-10-23 | P01CP10237Pima County permit | HistoricalELECT/COTH - | Withdrawn | |
| 2001-05-31finaled | P01CP05348Pima County permit | HistoricalELECT/COTH - — DP 4/91 HILANDS APARTMENTS | Final | |
| 1998-02-25finaled | P98CP01779Pima County permit | HistoricalELECT/COTH - | Final | |
| 1997-12-29 | P97CP15063Pima County permit | HistoricalSIGN/SIGN - — HILANDS APARTMENTS | Expired | |
| 1997-11-18 | P97CP13697Pima County permit | HistoricalSIGN/SIGN - | Expired | |
| 1997-10-23finaled | P97CP12584Pima County permit | HistoricalCOMBO/CADD - — HILANDS APARTMENTS | C of O | |
| 1997-09-23finaled | P97CP11219Pima County permit | HistoricalELECT/SOTH - — HILANDS APARTMENTS | Final | |
| 1996-01-04finaled | 106728Pima County permit | HistoricalPMSHIST/ - | Final | |
| 1996-01-04finaled | 106731Pima County permit | HistoricalPMSHIST/ - | Final | |
| 1996-01-04finaled | 106730Pima County permit | HistoricalPMSHIST/ - | Final | |
| 1996-01-03finaled | 106713Pima County permit | HistoricalPMSHIST/ - | Final | |
| 1996-01-03finaled | 106711Pima County permit | HistoricalPMSHIST/ - | Final |
How to read the status column: Final / Complete / C of O — city records show the permit was finalized. Issued — the work was permitted, but final completion is not confirmed. Applied / In review / Approved / Fees paid — proposed, not completion. Expired — the permit expired without a confirmed final status. Void / Withdrawn / Canceled — not evidence the work was installed. Any other status is shown exactly as the issuing office records it, without a completion reading.
Showing the 43 most recent county records — this parcel has more. The full set is on Pima County’s permit portal (search the parcel number).
Record numbers link to the issuing office’s official file — Pima County’s portal for county permits, the City of Tucson’s for city records. Highlighted rows are the ones that imply electrical work or an unpermitted-work finding.
This is an inference from public records — the year a structure was built, how it is classified, and what has been permitted. It is not an inspection, and nothing here confirms what is actually installed at this address. The only way to know is to look in the panel.
The contractor’s read is a plain-English brief of the record above, written by AI — what it shows across electrical, mechanical and the building itself, what is missing for the era, and what to verify on site.
The permanent link and the summary above, once. No list, no follow-up unless you ask for it.
How this report was built
This is a reading of public records for parcel 10922134C — 43 permits on file from 1996 to 2026 (14 building, 14 historical, 7 electrical / mechanical, 4 public records request) — assembled from the Pima County parcel file, the City of Tucson GIS layers, and Pima County’s Accela permit portal (searched by parcel and by address, because the county’s parcel links break on older records). Public records last checked 2026-08-16; the record is re-read at least weekly. Each permit and code case links to its official file. The verdicts are inferences from what was permitted and when, and from the era the building went up; they are not an inspection, and nothing here confirms what is installed. A permit that is present is strong evidence; a permit that is absent is weak evidence — plenty of work is never permitted, and older county records were only partly moved online.
The interactive version of this report can also read the plan sheets behind a City of Tucson permit and write a contractor’s brief of the whole record — those buttons appear once the page finishes loading. Written and maintained by Arizona Electrical Solutions, LLC, a licensed Tucson contractor (ROC 276948 CR-11 electrical, ROC 326401 CR-39 HVAC, ROC 329360 KB-1, ROC 312437 KA).
Look up a different address: Tucson permit history & electrical upgrade check · see permit data by neighborhood.
